English  |  正體中文  |  简体中文  |  0  
???header.visitor??? :  53084477    ???header.onlineuser??? :  854
???header.sponsordeclaration???
 
臺灣學術機構典藏系統 (Taiwan Academic Institutional Repository, TAIR)
???ui.leftmenu.abouttair???

???ui.leftmenu.bartitle???

???index.news???

???ui.leftmenu.copyrighttitle???

???ui.leftmenu.link???

"徐旭昇"???jsp.browse.items-by-author.description???

???jsp.browse.items-by-author.back???
???jsp.browse.items-by-author.order1??? ???jsp.browse.items-by-author.order2???

Showing items 1-10 of 71  (8 Page(s) Totally)
1 2 3 4 5 6 7 8 > >>
View [10|25|50] records per page

Institution Date Title Author
元智大學 2010-07 A Pareto evolutionary algorithm approach to bi-objective unrelated parallel machine scheduling problems 徐旭昇; Wei-Shung Chang
元智大學 2010-07 A Competitive Evolution Strategy Memetic Algorithm for Unrelated Parallel Machine Scheduling to Minimize Total Weighted Tardiness and Flow Time 徐旭昇; Wei-Shung Chang
元智大學 2010-06 A dual-population memetic algorithm for minimizing total cost of multi-mode resource-constrained project scheduling 徐旭昇; Zhi-Jie Chen
元智大學 2010-06 應用資料包絡分析法之保證區域模式評估多個排程方案效率之研究-以TFT-LCD偏光板裁切製程為例 張煒嵩; 徐旭昇
元智大學 2010-06 分期付款最大利潤現值資源限制專案排程解算之研究 徐志進; 方英傑; 徐旭昇
元智大學 2010-06 TFT-LCD Cell 製程生產排程及機台配置之決策分析 陳博文; 陳芝傑; 徐旭昇
元智大學 2010-05 Economic optimization of resource-constrained project scheduling: A two-phase metaheuristic approach 徐旭昇; Angela H.L. Chen
元智大學 2010-03 An evolutionary algorithm with multi-local search for the resource-constrained project scheduling problem 徐旭昇; Zhi-Jie Chen
元智大學 2009-12 A Multi-Criteria Decision Making for the Unrelated Parallel Machines Scheduling Problem 徐旭昇; Wei-Shung Chang
元智大學 2009-12 Simulated Annealing for the Fuzzy Bi-objective Unrelated Parallel Machine Scheduling 徐旭昇; Wei-Shung Chang

Showing items 1-10 of 71  (8 Page(s) Totally)
1 2 3 4 5 6 7 8 > >>
View [10|25|50] records per page