English  |  正體中文  |  简体中文  |  Total items :2856565  
Visitors :  53426514    Online Users :  656
Project Commissioned by the Ministry of Education
Project Executed by National Taiwan University Library
 
臺灣學術機構典藏系統 (Taiwan Academic Institutional Repository, TAIR)
About TAIR

Browse By

News

Copyright

Related Links

"徐旭昇"

Return to Browse by Author
Sorting by Title Sort by Date

Showing items 31-55 of 71  (3 Page(s) Totally)
<< < 1 2 3 > >>
View [10|25|50] records per page

Institution Date Title Author
元智大學 2007-12 Minimizing The Makespan Of The Material Constrained Component Scheduling Problem : A Case Of Multiple Identical PCBs Per Unit Assembly With Identical Machines In Series 徐旭昇; Wei-Shung Chang
元智大學 2007-10 Variable Neighborhood Search For A Payment Model In The Resource-Constrained Project Scheduling Problem With Simple Discount Rate 徐旭昇; Zhi-Jie Chen
元智大學 2007-10 Solving The Time/Cost Trade-Off Project Scheduling Problem With Renewable Resource Constraints And A Project Deadline 徐旭昇; Zhi-Jie Chen; Pong-Yang Lei
元智大學 2007-09 Hybrid Evolutionary Algorithms for the Multi-Mode Resource-Constrained Project Scheduling Problem with the Objective to Minimize Execution Cost within a Due Date 徐旭昇; Pong-Yang Lei
元智大學 2007-08 貝式方法於選別型雙次抽樣檢驗計畫之設計 黃一平; 徐旭昇
元智大學 2007-07 Local Search Based Metaheuristics for the Multi-Source Capacitated Facility Location Problem 徐旭昇; Wei-Shung Chang; Pong-Yeng Lei
元智大學 2006-12 模擬退火演算法求解多源容量限制設施選位問題 雷鵬遠; 張煒嵩; 徐旭昇
元智大學 2006-12 Simulated Annealing Algorithms for the Multi-Source Capacitated Warehouse Location Problem 徐旭昇; W.-S Chang; P.-Y Lei; C.-C. Lu
元智大學 2006-11 變動臨域搜尋法求解多源容量限制設施選位問題 雷鵬遠; 張煒嵩; 徐旭昇
元智大學 2006-11 加劇產品失效成本抽樣檢驗計畫之設計 - 元件功能值變異數未知 黃一平; 徐旭昇
元智大學 2006-10 Application of a hybrid ant colony optimization for the multilevel thresholding in image processing 梁音勻嘉; 徐旭昇; Angela H.L. Chen
元智大學 2006-10 Economic Design of a Rectifying Inspection Sampling Procedure for Single Specification Limit Products 徐旭昇; I.-P. Huang
元智大學 2006-06 A two-phase method for the multi-mode resource-constrained project scheduling problem 徐旭昇; Angela H.L. Chen; Zhi-Jie Chen; Hsin-Hui Lin
元智大學 2006-06 A hybrid genetic algorithm approach to the operation sequence of a high speed chip placement machine 徐旭昇; Wei-Chung Chang
元智大學 2006-06 A hybrid genetic algorithm approach to the operation sequence of a high speed chip placement machine 徐旭昇; Wei-Chung Chang
元智大學 2006-04 A Bayesian analysis of the Deming cost model with normally distributed sampling data 徐旭昇; I.-C. Yu
元智大學 2005-12 C.-C. Chyu, A. H.L. Chen, and X.-H. Lin, “A Hybrid Ant Colony Approach to Multi-mode Resource-Constrained Project Scheduling Problems with non-renewable types,” 徐旭昇; A. H.L. Chen; X.-H. Lin
元智大學 2005-12 A Mixed Strategy Genetic Local Search Algorithm for the Resource-Constrained Project Scheduling Problem 徐旭昇; H.L. Chen; Zhi-Jie Chen
元智大學 2005-11 混合基因法於PCB製程高速機置件順序問題之解算效果分析 林欣慧; 張煒嵩; 徐旭昇
元智大學 2005-11 瀰集進化演算法求解多資源限制專案排程問題 陳芝傑; 陳香伶; 徐旭昇
元智大學 2005-07 Memetics Algorithms for the Project Scheduling Problem 徐旭昇; Angela H.L. Chen; Zhi-Jie Chen
元智大學 2004-12 An Ant Colony Approach to Resource-Constrained Project Scheduling Problems 梁音勻嘉; 徐旭昇; Angela H.L. Chen; Wen-Ching Kao
元智大學 2004-12 An Economical Inspection Sampling Model for a Product Containing Series-Structured Components 徐旭昇
元智大學 2004-12 基因區域最佳化解算印刷電路板高速機置件順序問題之效果分析 - 同類型元件可分機分槽擺置情況 徐旭昇; 陳彥芬
元智大學 2004-11 組件品質特性屬常態分配下戴明成本模式之貝氏分析 徐旭昇

Showing items 31-55 of 71  (3 Page(s) Totally)
<< < 1 2 3 > >>
View [10|25|50] records per page