朝陽科技大學 |
2021-04-01 |
A delayed differentiation multiproduct model with the outsourcing of common parts, overtime strategy for end products, and quality reassurance
|
王聖嘉;Chiu, Victoria;黃明弘;邱元錫 |
朝陽科技大學 |
2021-04 |
A delayed differentiation multiproduct model with the outsourcing of common parts, overtime strategy for end products, and quality reassurance
|
王聖嘉; Chiu, Yuan-Shyi Peter;Hwang, Ming-Hon; Chiu, Victoria |
朝陽科技大學 |
2021-03 |
ECONOMIC MANUFACTURING QUANTITY MODEL WITH MACHINE FAILURE, OVERTIME, AND REWORK/DISPOSAL OF NONCONFORMING ITEMS
|
邱元錫; 王聖嘉; Chiu, Tiffany; Lin, Hong-Dar |
朝陽科技大學 |
2021-02-01 |
Studying the effect of stochastic breakdowns, overtime, and rework on inventory replenishment decision
|
Wu, Hua Yao; Wu, Cheng-Sian; 王聖嘉; 邱元錫 |
朝陽科技大學 |
2021-01 |
A multi-item batch fabrication problem featuring delayed product differentiation, outsourcing, and quality assurance
|
邱元錫; 張輝鑫; 王聖嘉; Chiu, Tiffany |
朝陽科技大學 |
2020-12-15 |
Mathematical modeling for multiproduct EPQ problem featuring delayed differentiation, expedited rate, and scrap
|
Wang, Y.; Lin, J-N.; 林宏達; 王聖嘉 |
朝陽科技大學 |
2020-10-15 |
Determining the fabrication runtime for a buyer-vendor system with stochastic breakdown, accelerated rate, repairable items, and multi-delivery strategy
|
王聖嘉; 宋鵬程; Liang-Wei You, Yunsen Wang |
朝陽科技大學 |
2020-09-13 |
Solving optimal batch size considering partial outsourcing plan and rework without derivatives
|
邱元錫; 王聖嘉; ZHAO, Zhong-Yun;LIAN, Jian-Hua;KE, Chih-Yun |
朝陽科技大學 |
2020-09 |
The Collective Influence of Component Commonality, Adjustable-Rate, Postponement, and Rework on Multi-Item Manufacturing Decision
|
Chiu, Tiffany; You, Liang-Wei;Ye, Tsu-Ming; 王聖嘉 |
朝陽科技大學 |
2020-08-31 |
Optimal hybrid inventory replenishment runtime for a vendor- buyer coordinated system with breakdowns and rework/disposal of nonconforming items
|
王聖嘉; 宋鵬程; Wu, Hua-Yao |
朝陽科技大學 |
2020-07-15 |
A vendor-buyer coordinated system featuring an unreliable machine, scrap, outsourcing, and multiple shipments
|
邱元錫; 王聖嘉; Zhao, Zhong-Yun; Chiu, Victoria |
朝陽科技大學 |
2020-06-15 |
Combining the delayed differentiation policy and common parts’ partial outsourcing strategy into a multi-item FPR-based system
|
王聖嘉; 邱元錫; Zhao, Zhong-Yun; Chiu, Tiffany |
朝陽科技大學 |
2020-01-17 |
A hybrid finite production rate system featuring random breakdown and rework
|
邱元錫; 王聖嘉; Chen, Hui-Cun; Wu, Hua-Yao |
朝陽科技大學 |
2020-01 |
Determining optimal uptime considering an unreliable machine, a maximum permitted backorder level, a multi-delivery plan, and disposal/rework of imperfect items
|
邱元錫; 王聖嘉; Li, Y-Y.; Chiu, T. |
朝陽科技大學 |
2019-08-30 |
Exploration of a multi-product EPQ-based system with overtime and quality reassurance
|
王聖嘉; 周中理; 林宏達; 黃明弘 |
朝陽科技大學 |
2019-07-07 |
Solving a hybrid multiproduct replenishing problem
|
邱元錫; 王聖嘉; Chen, H-C.;Zhao, Z-Y.;Lai, C-M. |
朝陽科技大學 |
2019-07-07 |
Combining an adjustable fabrication rate into a multi-item stock refilling problem
|
王聖嘉; 邱元錫; Huang, Yi-Jing;Wu, C-S.;Lin, J-N.;You, L-W. |
朝陽科技大學 |
2019-07-06 |
Combining an adjustable fabrication rate into a multi-item stock refilling problem(初稿)
|
Huang, Y-J.;Wu, C-S.;Lin, J-N.;You, L-W.; 王聖嘉;邱元錫 |
朝陽科技大學 |
2019-07 |
Satisfying multiproduct demand with a FPR-based inventory system featuring expedited rate and scraps
|
王聖嘉; 邱元錫; Huang, Yi-Jing; Chiu, Tiffany |
朝陽科技大學 |
2019-07 |
Production and distribution decisions for a multi-product system with component commonality, postponement strategy and quality assurance using a two-machine scheme
|
王聖嘉; 邱元錫;張輝鑫; Kuo, J-S. |
朝陽科技大學 |
2019-05-21 |
Production planning incorporating issues of reliability and backlogging with service level constraint
|
Chiu, Tiffany; Liang, Gang-Ming; 王聖嘉; 邱元錫 |
朝陽科技大學 |
2019-04 |
Joint effects of stochastic machine failure, backorder of permissible shortage, rework, and scrap on stock replenishing decision
|
邱元錫; 王聖嘉; Chen, Yu-Ru;Chiu, Victoria |
朝陽科技大學 |
2019-01 |
Mathematical modeling for a fabrication-inventory problem with scrap, an acceptable stock-out level, stochastic failures, and a multi-shipment policy
|
王聖嘉; Chiu, Y-S.P.; Chen, H-Y.; Wu, H.Y. |
朝陽科技大學 |
2018-07-08 |
Alternative method to resolve an EPLS problem incorporating overtime feature
|
邱元錫; 王聖嘉; Jhan, J-H., Wu, C-S. |
朝陽科技大學 |
2018-07-08 |
Solving an economic production lot size problem incorporating overtime feature
|
王聖嘉; 邱元錫; Huang, Yi-Jing, Chen, Hui-Cun |