|
English
|
正體中文
|
简体中文
|
总笔数 :2822924
|
|
造访人次 :
30060349
在线人数 :
1137
教育部委托研究计画 计画执行:国立台湾大学图书馆
|
|
|
"邱元錫"的相关文件
显示项目 11-20 / 111 (共12页) << < 1 2 3 4 5 6 7 8 9 10 > >> 每页显示[10|25|50]项目
朝陽科技大學 |
2020-09-13 |
Solving optimal batch size considering partial outsourcing plan and rework without derivatives
|
邱元錫; 王聖嘉; ZHAO, Zhong-Yun;LIAN, Jian-Hua;KE, Chih-Yun |
朝陽科技大學 |
2020-07-15 |
A vendor-buyer coordinated system featuring an unreliable machine, scrap, outsourcing, and multiple shipments
|
邱元錫; 王聖嘉; Zhao, Zhong-Yun; Chiu, Victoria |
朝陽科技大學 |
2020-06-15 |
Combining the delayed differentiation policy and common parts’ partial outsourcing strategy into a multi-item FPR-based system
|
王聖嘉; 邱元錫; Zhao, Zhong-Yun; Chiu, Tiffany |
朝陽科技大學 |
2020-05 |
Determining the optimal cycle length for a multiproduct EMQ problem considering rework and overtime options
|
邱元錫; 宋鵬程; Wu, Cheng-Sian; Chiu, Victoria; Chiu, Yuan-Shyi |
朝陽科技大學 |
2020-02-29 |
Note on Cost Minimization for a Multi-product Fabrication-Distribution Problem with Commonality, Postponement and Quality Assurance
|
邱元錫; 林宏達; Wu, Hua-Yao |
朝陽科技大學 |
2020-01-17 |
A hybrid finite production rate system featuring random breakdown and rework
|
邱元錫; 王聖嘉; Chen, Hui-Cun; Wu, Hua-Yao |
朝陽科技大學 |
2020-01 |
Determining optimal uptime considering an unreliable machine, a maximum permitted backorder level, a multi-delivery plan, and disposal/rework of imperfect items
|
邱元錫; 王聖嘉; Li, Y-Y.; Chiu, T. |
朝陽科技大學 |
2019-12-15 |
Incorporating outsourcing, stochastic failure, and scrap into batch fabrication planning
|
邱元錫; 周中理; Jhan, J-H.; Chiu, Victoria |
朝陽科技大學 |
2019-10 |
Determining rotation cycle and distribution frequency for a vendor-buyer integrated multi-item system considering an external provider and rework
|
邱元錫; Chen, Hui-Cun; 黃明弘; 張輝鑫 |
朝陽科技大學 |
2019-09 |
A decision model for a quality-assured EPQ-based intra-supply chain system considering overtime option
|
邱元錫; 林宏達; Chen, Y-R.; Chiu, V. |
显示项目 11-20 / 111 (共12页) << < 1 2 3 4 5 6 7 8 9 10 > >> 每页显示[10|25|50]项目
|