朝陽科技大學 |
2019-07-07 |
Solving a hybrid multiproduct replenishing problem
|
邱元錫; 王聖嘉; Chen, H-C.;Zhao, Z-Y.;Lai, C-M. |
朝陽科技大學 |
2019-07-07 |
Combining an adjustable fabrication rate into a multi-item stock refilling problem
|
王聖嘉; 邱元錫; Huang, Yi-Jing;Wu, C-S.;Lin, J-N.;You, L-W. |
朝陽科技大學 |
2019-07-06 |
Combining an adjustable fabrication rate into a multi-item stock refilling problem(初稿)
|
Huang, Y-J.;Wu, C-S.;Lin, J-N.;You, L-W.; 王聖嘉;邱元錫 |
朝陽科技大學 |
2019-07 |
Satisfying multiproduct demand with a FPR-based inventory system featuring expedited rate and scraps
|
王聖嘉; 邱元錫; Huang, Yi-Jing; Chiu, Tiffany |
朝陽科技大學 |
2019-07 |
Production and distribution decisions for a multi-product system with component commonality, postponement strategy and quality assurance using a two-machine scheme
|
王聖嘉; 邱元錫;張輝鑫; Kuo, J-S. |
朝陽科技大學 |
2019-05-21 |
Production planning incorporating issues of reliability and backlogging with service level constraint
|
Chiu, Tiffany; Liang, Gang-Ming; 王聖嘉; 邱元錫 |
朝陽科技大學 |
2019-05 |
Meeting multiproduct demand with a hybrid inventory replenishment system featuring quality reassurance
|
邱元錫; 林宏達; 張輝鑫; Chiu, Victoria |
朝陽科技大學 |
2019-04 |
Joint effects of stochastic machine failure, backorder of permissible shortage, rework, and scrap on stock replenishing decision
|
邱元錫; 王聖嘉; Chen, Yu-Ru;Chiu, Victoria |
朝陽科技大學 |
2018-07-08 |
Alternative method to resolve an EPLS problem incorporating overtime feature
|
邱元錫; 王聖嘉; Jhan, J-H., Wu, C-S. |
朝陽科技大學 |
2018-07-08 |
Solving an economic production lot size problem incorporating overtime feature
|
王聖嘉; 邱元錫; Huang, Yi-Jing, Chen, Hui-Cun |
朝陽科技大學 |
2018-05-15 |
Incorporating flexible fabrication rate and random scrap into a FPR-based supply-chain system
|
邱元錫; Chiu, Han-Ying Chen & Tiffany; 王聖嘉 |
朝陽科技大學 |
2018-03-15 |
Optimization of an economic production quantity-based system with random scrap and adjustable production rate
|
邱元錫; Chiu, Han-Ying Chen & Victoria; 王聖嘉 |
朝陽科技大學 |
2018-01 |
Alternative approach to optimize a multiproduct intra-supply chain system with failure in rework
|
邱元錫;黃明弘;周中理;王聖嘉 |
朝陽科技大學 |
2017-12 |
On a delayed differentiation multi-product FPR model with scrap and a multi-delivery policy – II, using two-machine production scheme
|
邱元錫; Liu, Y-P. & 宋鵬程 |
朝陽科技大學 |
2017-12 |
Finite production rate model with backlogging, service level constraint, rework, and random breakdown.
|
王聖嘉; Liu, C-J., Chen, Y-R.; 邱元錫 |
朝陽科技大學 |
2017-09 |
Optimal Batch Size Considering Partial Outsourcing Plan and Rework
|
邱元錫; Liu, C-J. & 黃明弘 |
朝陽科技大學 |
2017-08-15 |
On mathematical modeling of a multi-product EMQ model with an enhanced end items issuing policy and failures in rework
|
邱元錫; Lin, H-D; Wu, M-F. |
朝陽科技大學 |
2017-07-08 |
Alternative approach on meeting product demand by an imperfect EPQ-based model and an external source
|
邱元錫; 王聖嘉; Jhan, J-H., Wu, C-S. |
朝陽科技大學 |
2017-07 |
On solving a fabrication lot-size and shipping frequency problem with an outsourcing policy and random scrap
|
邱元錫; Chiu, V. & 宋鵬程 |
朝陽科技大學 |
2017-07 |
Meeting product demand by an imperfect EPQ-based model and an external source
|
王聖嘉; 邱元錫; Liang, G-M., Chen, Y-R., Li, Y-Y. |
朝陽科技大學 |
2016-12-12 |
Effect of delayed differentiation on a multiproduct vendor-buyer integrated inventory system with rework
|
邱元錫; 王聖嘉; Kuo, J-S.; Hsieh, Y-T. |
朝陽科技大學 |
2016-12-05 |
Optimization of a Multi-Product Intra-Supply Chain System with Failure in Rework
|
邱元錫 |
朝陽科技大學 |
2016-12 |
Determining cycle time for a multi-product FPR model with rework and an improved delivery policy by alternative approach
|
邱元錫; 林宏達; 曾兆堂; 王聖嘉 |
朝陽科技大學 |
2016-12 |
A delayed differentiation multi-product FPR model with scrap and a multi-delivery policy – I: Using single-machine production scheme
|
邱元錫; Hsieh, Y-T., Juo, J-S.; 王聖嘉 |
朝陽科技大學 |
2016-12 |
A delayed differentiation multi-product FPR model with scrap and a multi-delivery policy – II: Using two-machine production scheme
|
王聖嘉; (Hsieh, Y-T.); 邱元錫; 黃明弘 |