| 元智大學 |
2013-12-07 |
建構智慧型汽車座椅品質異常診斷系統
|
江志明; 黃國格; Chuen-Sheng Cheng |
| 元智大學 |
2013-11-16 |
整合平滑樣線法與決策樹於非線性剖面製程之研究
|
黃兆雅 ; 李虹葶; Chuen-Sheng Cheng |
| 元智大學 |
2013-11-16 |
應用六標準差DMAIC方法論提升印刷電路板成型製程能力之研究
|
林大景; 黃國格; Chuen-Sheng Cheng |
| 元智大學 |
2013-10-14 |
Monitoring of Nonlinear Product and Process Profiles Using Support Vector Machines
|
Chuen-Sheng Cheng; Lee, H. T; Chen, S. Y. |
| 元智大學 |
2013-07-18 |
Identifying process status changes via integration of independent component analysis and support vector machine
|
Chuen-Sheng Cheng; Kuo-Ko Huang |
| 元智大學 |
2013-02 |
Monitoring of Within-part and Between-part Variations with Independent Comonent Analysis and Statistical Process Control
|
Kuo-Ko Huang 黃國格; Chuen-Sheng Cheng |
| 元智大學 |
2013-02 |
The research of using climate temperature stipulates the temperature specification of electronics product with inverse simulation and inverse FAT-to improve the product reliability and reach DFSS
|
Chi-Ming Kuan 關季明; Chuen-Sheng Cheng |
| 元智大學 |
2013-02 |
The research of using climate temperature stipulates the temperature specification of electronics product with inverse simulation and inverse FAT-to improve the product reliability and reach DFSS
|
Chuen-Sheng Cheng; Kuan, C. M., |
| 元智大學 |
2013-02 |
Monitoring of Within-part and Between-part Variations with Independent
|
Chuen-Sheng Cheng; Huang, K. K |
| 元智大學 |
2012-12-15 |
結合分析網路程序法與損失函數以建構供應商之評選模式
|
張玉榮; 黃國格; Chuen-Sheng Cheng |
| 元智大學 |
2012-12-15 |
應用整體式分類模型診斷多變量製程平均數偏移
|
黃奕錞; 李虹葶; Chuen-Sheng Cheng |
| 元智大學 |
2012-12-15 |
應用整體式分類模型診斷多變量製程平均數偏移
|
黃奕錞; 李虹葶; Chuen-Sheng Cheng |
| 元智大學 |
2012-12 |
Research on product reliability improvement by using DMAIC process: A case study of cold cathode fluorescent lamp
|
Kuan, C. M. 關季明; Chuen-Sheng Cheng |
| 元智大學 |
2012-11-17 |
應用分析網路程序法與折衷排序法建立外包商之評選模式-以系統級封裝設計公司為例
|
林怡真; 黃國格; Chuen-Sheng Cheng |
| 元智大學 |
2012-11-15 |
應用支援向量回歸建立製程/產品剖面資料之監控程序,
|
吳薏苓; 李虹葶; 陳佩雯; Chuen-Sheng Cheng |
| 元智大學 |
2012-11-15 |
Integrating independent component analysis and support vector machine for identifying process status changes
|
Chuen-Sheng Cheng; Huang, K. K. |
| 元智大學 |
2012-10 |
Increasing the sensitivity of cumulative quality control charts for monitoring high-yield process with runs rules
|
Chen, P. W, 陳佩雯; Chen, S. J. 陳思蓉; Chuen-Sheng Cheng |
| 元智大學 |
2012-08-01 |
Identifying the process status change using independent component analysis and support vector machine
|
Huang, K. k; Chuen-Sheng Cheng; Chen, P. W.; Hsu, M. S.; Chiang, M. J. |
| 元智大學 |
2012-08-01 |
The application of decision tree-based ensemble classifiers for diagnosing the mean shift signals in multivariate control chart
|
Lee, H. T.; Chuen-Sheng Cheng; Tai, Y.; Huang, Y. C. |
| 元智大學 |
2012-08-01 |
Monitoring of process and product profiles using artificial neural networks
|
Chuen-Sheng Cheng; Wu, I. L.; Chen, S. Y.; Lee, Y. L. |
| 元智大學 |
2012-08 |
Using neural network to predict current gain of III-V compound semiconductor epitaxy wafer
|
Chen, P. W. 陳佩雯; Lee, T. C. 李聰智; Chuen-Sheng Cheng |
| 元智大學 |
2012-07 |
Identifying the out-of-control variables of multivariate control chart using ensemble SVM classifiers
|
Chuen-Sheng Cheng; Lee, H. T. |
| 元智大學 |
2012-07 |
Identifying the out-of-control variables of multivariate control chart using ensemble SVM classifiers
|
Chuen-Sheng Cheng; Lee, H. T |
| 元智大學 |
2012-06 |
Early validation method for reliability growth based on environmental stress screening
|
Chuen-Sheng Cheng; Kuan, C. M. |
| 元智大學 |
2012-04 |
The application of design for Six Sigma on high level smart phone development
|
Chuen-Sheng Cheng; Lee, S. C; Chen, P. W.; Huang, K. K. |