English  |  正體中文  |  简体中文  |  2823016  
???header.visitor??? :  30169002    ???header.onlineuser??? :  1091
???header.sponsordeclaration???
 
臺灣學術機構典藏系統 (Taiwan Academic Institutional Repository, TAIR)
???ui.leftmenu.abouttair???

???ui.leftmenu.bartitle???

???index.news???

???ui.leftmenu.copyrighttitle???

???ui.leftmenu.link???

"chun lung chen"???jsp.browse.items-by-author.description???

???jsp.browse.items-by-author.back???
???jsp.browse.items-by-author.order1??? ???jsp.browse.items-by-author.order2???

Showing items 11-34 of 34  (2 Page(s) Totally)
1 2 > >>
View [10|25|50] records per page

Institution Date Title Author
國立臺灣海洋大學 2014-01 Key issues of wind capacity integration in congested areas of the Taiwan power system Chun-Lung Chen
國立臺灣海洋大學 2014-01 Multi-area Economic Generation and Reserve Dispatch Considering Large-scale Integration of Wind Power Chun-Lung Chen; Zih-Yan Chen; Tsung-Ying Lee
國立臺灣海洋大學 2012-05 A novel direct search approach for combined heat and power dispatch Chun-Lung Chen; T.Y. Lee; C. L. Lu; R.M. Jan
國立臺灣海洋大學 2011 以微處理器控制之PMOS群可切換式控制的太陽能板裝置(2008) 陳俊隆; Chun-Lung Chen
國立臺灣海洋大學 2011 A Novel Particle Swarm Optimation Algorithm Solution Of Economic Dispatch With Valve Point Loading Chun-Lung Chen;Rong-Mow Jan;Tsung-Ying Lee;Cheng-Hsiung Chen
義守大學 2010-07 空調系統節能控制之開發 陳俊龍; Chun-Lung Chen
國立臺灣海洋大學 2009-06 Key Issues of Wind Plant Integration into Electric Power Systems T.-Y. Lee;Chun.-Lung. Chen
國立臺灣海洋大學 2009-06 Wind-PV Capacity Coordination for a Time-Of-Use Rate Industrial User T.Y. Lee; Chun-Lung Chen
國立臺灣海洋大學 2008-11 Effects of wind energy supplied by independent power producers on the generation dispatch of electric power utilities Chia-Liang Lu;Chun-Lung Chen;Daw-Shang Hwang;Yuang-Tung Cheng
國立臺灣海洋大學 2008-06 Optimal Integration of Wind Farms to Isolated Wind-Diesel Energy System Chun-Lung Chen;Sheng-Chuan Hsieh;Tsung-Ying Lee;Chia-Liang Lu
國立臺灣海洋大學 2008-03 Optimal Wind–Thermal Generating Unit Commitment Chun-Lung Chen
國立臺灣海洋大學 2007-04 Iteration particle swarm optimization for contract capacities selection of time-of-use rates industrial customers Tsung-Ying Lee;Chun-Lung Chen
國立臺灣海洋大學 2007-02 Effects of Photovoltaic Generation System on the Contract Capacity Selection of Time-Of-Use Rate Industrial Users Tsung-Ying Lee;Chun-Lung Chen
國立臺灣海洋大學 2007-02 Unit commitment with probabilistic reserve: An IPSO approach Tsung-Ying Lee;Chun-Lung Chen
國立臺灣海洋大學 2007-01 Non-convex economic dispatch: A direct search approach Chun-Lung Chen
國立臺灣海洋大學 2007 Impact Analysis of Transmission Capacity Constraints on Wind Power Penetration and Production Cost in Generation Dispatch Chun-Lung Chen;Tsung-Ying Lee
國立臺灣海洋大學 2006-11 Optimal Wind-Thermal Coordination Dispatch in Isolated Power Systems with Large Integration of Wind Capacity Chun-Lung Chen;Tsung-Ying Lee;Rong-Mow Jan
國立臺灣海洋大學 2006-06 Environmentally-Constrained Economic Dispatch using a Penalty Function-Direct Search Method Chun-Lung Chen
國立臺灣海洋大學 2006 ECONOMIC DISPATCH OF LARGE SCALE WIND-THERMAL HYBRID GENERATION SYSTEMS Chun-Lung Chen
國立臺灣海洋大學 2006 The Effects of Hydro Units and Pumped Storage Units on Optimal Generation Scheduling of a Competitive Market in Power Systems T.Y. Lee;Chun-Lung Chen;R. M. Jan
國立臺灣海洋大學 2005-11 Optimal generation and reserve dispatch in a multi-area competitive market using a hybrid direct search method Chun-Lung Chen
義守大學 2003 具有快速式學習之神經網路於訊號的應用研究 陳俊融; Chun-Lung Chen
國立臺灣海洋大學 2001-11 Direct Search Method for Solving Economic Dispatch Problem considering Transmission Capacity Constraints Chun-Lung Chen;Nanming Chen
國立臺灣科技大學 2001 Multi-area economic generation and reserve dispatch Chun-Lung Chen;Chen, N.

Showing items 11-34 of 34  (2 Page(s) Totally)
1 2 > >>
View [10|25|50] records per page