|
???tair.name??? >
???browser.page.title.author???
|
"feng chung wei"???jsp.browse.items-by-author.description???
Showing items 1-11 of 11 (1 Page(s) Totally) 1 View [10|25|50] records per page
臺大學術典藏 |
2018-09-10T14:52:24Z |
WEB-BASED REAL TIME BRIDGE SCOUR MONITORING SYSTEM FOR DISASTER MANAGEMENT
|
Lin, Chih-Ting; Han, Jen-Yu; Weng, Kai-Wei; Hsu, Shu-Chien; JEN-YU HAN; CHIH-TING LIN; Feng, Chung-Wei; Ju, Shen-Haw; Tserng, Hui-Ping; Skibniewski, Miroslaw; Skibniewski, Miroslaw; Tserng, Hui-Ping; Ju, Shen-Haw; Feng, Chung-Wei; Lin, Chih-Ting; Han, Jen-Yu; Weng, Kai-Wei; Hsu, Shu-Chien |
國立成功大學 |
2016-08 |
Using a Simple Soil Spring Model and Support Vector Machine to Determine Bridge Scour Depth and Bridge Safety
|
Feng, Chung-Wei; Ju, Shen-Haw; Huang, Hsun-Yi |
國立交通大學 |
2014-12-08T15:07:31Z |
Clarifying the Relationship between Quality of Global Positioning System Data and Precision of Positioning
|
Yeh, Ta-Kang; Chen, Yi-Jao; Chung, Yi-Da; Feng, Chung-Wei; Xu, Guochang |
國立成功大學 |
2014 |
WEB-BASED REAL TIME BRIDGE SCOUR MONITORING SYSTEM FOR DISASTER MANAGEMENT
|
Skibniewski, Miroslaw; Tserng, Hui-Ping; Ju, Shen-Haw; Feng, Chung-Wei; Lin, Chih-Ting; Han, Jen-Yu; Weng, Kai-Wei; Hsu, Shu-Chien |
國立高雄應用科技大學 |
2011 |
USING BIM MODEL AND GENETIC ALGORITHMS TO OPTIMIZE THE CREW ASSIGNMENT FOR CONSTRUCTION PROJECT PLANNING
|
Chen, Yi-Jao; Feng, Chung-Wei; Wang, Yu-Ren; Wu, Hsueh-Ming |
國立成功大學 |
2006-05 |
An integrated modeling mechanism for optimizing the simulation model of the construction operation
|
Cheng, Tao-Ming; Feng, Chung-Wei; Hsu, Ming-Yuan |
國立成功大學 |
2006-03 |
Integrating fmGA and CYCLONE to optimize the schedule of dispatching RMC trucks
|
Feng, Chung-Wei; Wu, Hsien-Tang |
國立成功大學 |
2005-01 |
A hybrid mechanism for optimizing construction simulation models
|
Cheng, Tao-Ming; Feng, Chung-Wei; Chen, Yan-Liang |
國立成功大學 |
2004-05 |
Optimizing the schedule of dispatching RMC trucks through genetic algorithms
|
Feng, Chung-Wei; Cheng, Tao-Ming; Wu, Hsien-Tang |
國立成功大學 |
2003-05 |
An effective simulation mechanism for construction operations
|
Cheng, Tao-Ming; Feng, Chung-Wei |
國立成功大學 |
2000-04 |
Stochastic construction time-cost trade-off analysis
|
Feng, Chung-Wei; Liu, Liang; Burns, Scott A. |
Showing items 1-11 of 11 (1 Page(s) Totally) 1 View [10|25|50] records per page
|