|
English
|
正體中文
|
简体中文
|
总笔数 :2856600
|
|
造访人次 :
53470746
在线人数 :
964
教育部委托研究计画 计画执行:国立台湾大学图书馆
|
|
|
"ho chia huei"的相关文件
显示项目 21-26 / 26 (共1页) 1 每页显示[10|25|50]项目
| 淡江大學 |
2004-12-01 |
A Minimax distribution free procedure for the integrated vendor-buyer inventory model with quality improvement and lead time reduction
|
Ouyang, Liang-yuh; 吳坤山; Wu, Kun-shan; Ho, Chia-huei |
| 淡江大學 |
2004-08-01 |
Impact of investing in quality improvement and lead time reduction on the integrated vendor-buyer inventory models
|
Ouyang, Liang-yuh; 吳坤山; Wu, Kun-shan; Ho, Chia-huei |
| 淡江大學 |
2004-06-21 |
The supply chain model for a single-vendor single-buyer system with defective items and controllable lead time
|
Ouyang, Liang-yuh; Wu, Kun-shan; Ho, Chia-huei |
| 淡江大學 |
2004-05-29 |
A minimax distribution free procedure for an integrated vendor-buyer inventory model with defective item and controllable lead time
|
歐陽良裕; Ouyang, Liang-yuh; 吳坤山; Wu, Kun-shan; Ho, Chia-huei |
| 淡江大學 |
2003-12-01 |
The supply chain model for a single-vendor single-buyer system with defective items and controllable lead time
|
Ouyang, Liang-yuh; 吳坤山; Wu, Kun-shan; Ho, Chia-huei |
| 淡江大學 |
2003-08-01 |
An integrated vendor-buyer cooperative inventory model involving defective items
|
Ouyang, Liang-yuh; 吳坤山; Wu, Kun-shan; Ho, Chia-huei |
显示项目 21-26 / 26 (共1页) 1 每页显示[10|25|50]项目
|