English  |  正體中文  |  简体中文  |  0  
???header.visitor??? :  52879813    ???header.onlineuser??? :  704
???header.sponsordeclaration???
 
臺灣學術機構典藏系統 (Taiwan Academic Institutional Repository, TAIR)
???ui.leftmenu.abouttair???

???ui.leftmenu.bartitle???

???index.news???

???ui.leftmenu.copyrighttitle???

???ui.leftmenu.link???

"hui ping tserng"???jsp.browse.items-by-author.description???

???jsp.browse.items-by-author.back???
???jsp.browse.items-by-author.order1??? ???jsp.browse.items-by-author.order2???

Showing items 1-50 of 82  (2 Page(s) Totally)
1 2 > >>
View [10|25|50] records per page

Institution Date Title Author
臺大學術典藏 2022-03-22T15:04:46Z Research on Monitoring the Nature Frequency of Bridges by Using Wireless Sensors- Bao Bridge and Wanshou Bridge for Example HUI-PING TSERNG; Chen, Hung Yi; Lee, Pi Ru; Chen, Ching Wei
臺大學術典藏 2022-03-22T08:27:51Z Developing a risk management process for infrastructure projects using idef0 Tserng H.-P;Cho I.-C;Chen C.-H;Liu Y.-F.; Tserng H.-P; Cho I.-C; Chen C.-H; Liu Y.-F.; HUI-PING TSERNG
臺大學術典藏 2022-03-22T08:27:51Z Developing a risk management process for infrastructure projects using idef0 Tserng H.-P;Cho I.-C;Chen C.-H;Liu Y.-F.; Tserng H.-P; Cho I.-C; Chen C.-H; Liu Y.-F.; HUI-PING TSERNG
臺大學術典藏 2022-03-22T08:27:51Z Real-time individual workload management at tunnel worksite using wearable heart rate measurement devices Chen W.-C;Tserng H.P.; Chen W.-C; Tserng H.P.; HUI-PING TSERNG
臺大學術典藏 2022-03-22T08:27:51Z Real-time individual workload management at tunnel worksite using wearable heart rate measurement devices Chen W.-C;Tserng H.P.; Chen W.-C; Tserng H.P.; HUI-PING TSERNG
臺大學術典藏 2022-03-22T08:25:08Z Developing a risk management process for infrastructure projects using idef0 Tserng H.-P;Cho I.-C;Chen C.-H;Liu Y.-F.; Tserng H.-P; Cho I.-C; Chen C.-H; Liu Y.-F.; HUI-PING TSERNG
臺大學術典藏 2022-03-22T08:25:08Z Real-time individual workload management at tunnel worksite using wearable heart rate measurement devices Chen W.-C;Tserng H.P.; Chen W.-C; Tserng H.P.; HUI-PING TSERNG
臺大學術典藏 2022-03-01 Using a Unique Retaining Method for Building Foundation Excavation: A Case Study on Sustainable Construction Methods and Circular Economy Tzou, Hong Kee; HUI-PING TSERNG; Ho, Shiau Jing; Liu, Tai Yi
臺大學術典藏 2021-08-05T02:36:41Z Automating the generation of indoor space topology for 3D route planning using BIM and 3D-GIS techniques Lin W.Y;Lin P.H;Tserng H.P.; Lin W.Y; Lin P.H; Tserng H.P.; HUI-PING TSERNG
臺大學術典藏 2021-07-21T23:20:47Z Developing a risk management process for infrastructure projects using idef0 HUI-PING TSERNG; Cho, I. Cheng; Chen, Chun Hung; Liu, Yu Fan
臺大學術典藏 2021-03-29T06:09:21Z 房地產開發選擇權評價:二項式選擇權定價模型與蒙特卡羅模擬混合法 葉怡成(I-Cheng Yeh);曾惠斌(Hui-Ping Tseng);官苑鈞(Yuan-Chun Kuan);謝博文(Po-Wen Hsieh); 葉怡成(I-Cheng Yeh); 曾惠斌(Hui-Ping Tseng); 官苑鈞(Yuan-Chun Kuan); 謝博文(Po-Wen Hsieh); HUI-PING TSERNG
臺大學術典藏 2021-03-29T06:09:20Z Management and Research on Public Construction Contract Termination and Cancellation - A Case Study of School Building Renovation Project 卓逸程(I-Cheng Cho);曾惠斌(H. P Tserng);徐景文(Ching-Wen Hsu); 卓逸程(I-Cheng Cho); 曾惠斌(H. P Tserng); 徐景文(Ching-Wen Hsu); HUI-PING TSERNG
臺大學術典藏 2021-03-29T06:09:20Z 臺灣私有建築物耐震評估補強經費之財務供需規劃暨其配套措施研議 周瑞生(Jui-Sheng Chou);歐昱辰(Yu-Chen Ou);曾惠斌(Hui-Ping Tserng);陳瑞鈴(Jui-Ling Chen);蔡綽芳(Chou-Fang Tsai);張人傑(Jen-Chieh Chang); 周瑞生(Jui-Sheng Chou); 歐昱辰(Yu-Chen Ou); 曾惠斌(Hui-Ping Tserng); 陳瑞鈴(Jui-Ling Chen); 蔡綽芳(Chou-Fang Tsai); 張人傑(Jen-Chieh Chang); HUI-PING TSERNG
臺大學術典藏 2021-02-04T02:48:30Z Earthquake damage assessment and cost-benefit analysis of seismic retrofitting for private buildings in metropolitan area: case studies on Xingfu and Weiguanjinlong buildings in Tainan city | 都會區私有建築物震損評估與耐震補強成本效益分析-以臺南市幸福及維冠金龍大樓為例 Chou, J.-S.; Ou, Y.-C.; Tserng, H.-P.; Chen, J.-L.; Tsai, C.-F.; Wu, Y.-Z.; Chen, Y.-M.; Chou, J.-S.; Ou, Y.-C.; Tserng, H.-P.; Chen, J.-L.; Tsai, C.-F.; Wu, Y.-Z.; Chen, Y.-M.; Yu-Chen Ou; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:46Z Health Assessment and Maintenance Strategy for Bridge Management Systems: Lessons Learned in Taiwan Tserng, H. Ping; Chung, Chin-Lung; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:46Z Interactive path planning for multi-equipment landfill operations (vol 10, pg 155, 2000) Tserng, H. P.; Ran, B.; Russell, J. S.; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:46Z Determining minimum contract time for highway projects Shr, J. F.; Thompson, B. P.; Russell, J. S.; Ran, B.; Tserng, H. P.; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:45Z OPSALC: A computer-integrated operations planning system for autonomous landfill compaction Tserng, H.-P.; Veeramani, D.; Kunigahalli, R.; Russell, J.S.; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:45Z Motion Planning for an Autonomous Compactor in a Waste Landfill Site Kunigahalli, R.; Russell, J.S.; Tserng, H.?P.; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:45Z Closure to "Developing a Resource Supply Chain Planning System or Construction Projects" by H. Ping Tserng, Samuel Y. L. Yin, and Sherman H. A. Li Tserng, H. Ping; Yin, Samuel Y. L.; Sherman, H. a. U.; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:43Z AutoPave: Towards an automated paving system for asphalt pavement compaction operations Krishnamurthy, B.K.; Tserng, H.-P.; Schmitt, R.L.; Russell, J.S.; Bahia, H.U.; Hanna, A.S.; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:42Z An accelerated subcontracting and procuring model for construction projects Tserng, H.P.; Lin, P.H.; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:42Z Interactive path planning for multi-equipment landfill operations Tserng, H.P.; Ran, B.; Russell, J.S.; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:42Z Determining minimum contract time for highway projects Shr, J.-F.; Thompson, B.P.; Russell, J.S.; Ran, B.; Tserng, H.P.; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:42Z Computer-integrated collaborative design and operation in the construction industry Veeramani, D.; Tserng, H.P.; Russell, J.S.; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:41Z Development of an object-oriented scheduling model for construction projects Fan, S.-L.; Tserng, H.P.; Wang, M.-T.; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:41Z Developing an electronic acquisition model for project scheduling using XML-based information standard Tserng, H.P.; Lin, W.Y.; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:41Z A framework of electronic tendering for government procurement: A lesson learned in Taiwan Liao, T.S.; Wang, M.T.; Tserng, H.P.; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:41Z A 3-D graphical database system for landfill operations using GPS Tserng, H.P.; Russell, J.S.; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:40Z Module-based construction schedule administration for public infrastructure agencies HUI-PING TSERNG;Tserng, H.P.;Wang, W.C.;Dzeng, R.J.; Dzeng, R.J.; Wang, W.C.; Tserng, H.P.; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:40Z Module-based construction schedule administration for public infrastructure agencies HUI-PING TSERNG;Tserng, H.P.;Wang, W.C.;Dzeng, R.J.; Dzeng, R.J.; Wang, W.C.; Tserng, H.P.; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:39Z Developing a resource supply chain planning system for construction projects HUI-PING TSERNG; Tserng, H.P.; Yin, S.Y.L.; Li, S.
臺大學術典藏 2019-12-19T07:12:39Z Mobile construction supply chain management using PDA and Bar Codes Tserng, H.P.; Dzeng, R.-J.; Lin, Y.-C.; Lin, S.-T.; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:39Z Automating schedule review for expressway construction Dzeng, R.J.; Tserng, H.P.; Wang, W.C.; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:39Z Developing an activity-based knowledge management system for contractors Tserng, H.P.; Lin, Y.-C.; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:38Z Distilling and managing engineers' experience in construction projects using a pattern approach Chang, C.-H.; Lin, Y.-C.; Tserng, H.P.; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:38Z Establishing domain testing resources to support advance text-based information retrieval applications for architecture, engineering, construction and facility management (AEC/FM) Lin, K.Y.; Hsieh, S.H.; Tserng, H.P.; Chou, K.W.; Lin, H.T.; Huang, C.P.; Tzeng, K.F.; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:38Z Enhancing knowledge exchange through web map-based knowledge management system in construction: Lessons learned in Taiwan Lin, Y.-C.; Wang, L.-C.; Tserng, H.P.; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:38Z Automated construction of the Paghuashan tunnel for Taiwan High Speed Rail (THSR) project Lin, P.H.; Tserng, H.P.; Lin, C.C.; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:38Z Object-oriented scheduling for repetitive projects with soft logics Fan, S.-L.; Tserng, H.P.; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:37Z Exploring the effectiveness of chinese-to-english machine translation for clir applications in earthquake engineering Lin, K.Y.; Chou, K.W.; Lin, H.T.; Hsieh, S.H.; Tserng, H.P.; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:37Z A model of integrating the cycle of construction knowledge flows: Lessons learned in Taiwan Yin, S.Y.L.; Tserng, H.P.; Tsai, M.D.; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:37Z Enabling the creation of domain-specific reference collections to support text-based information retrieval experiments in the architecture, engineering and construction industries Lin, K.Y.; Hsieh, S.H.; Tserng, H.P.; Chou, K.W.; Lin, H.T.; Huang, C.P.; Tzeng, K.F.; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:37Z Developing a project knowledge management framework for tunnel construction: Lessons learned in Taiwan Tserng, H.P.; Chang, C.-H.; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:36Z Developing an ARIS-house-based method from existing information systems to project-based enterprise resource planning for general contractor Tserng, H.P.; Yin, S.Y.L.; Skibniewski, M.J.; Lee, M.H.; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:36Z A production modeling with genetic algorithms for a stationary pre-cast supply chain Li, S.H.A.; Tserng, H.P.; Yin, S.Y.L.; Hsu, C.W.; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:36Z Analysing dispute mediation cases of infrastructure projects through project life cycle Tserng, H.P.; Teng, W.-K.; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:36Z A study of ontology-based risk management framework of construction projects through project life cycle Tserng, H.P.; Yin, S.Y.L.; Dzeng, R.J.; Wou, B.; Tsai, M.D.; Chen, W.Y.; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:36Z Developing a precast production management system using RFID technology Yin, S.Y.L.; Tserng, H.P.; Wang, J.C.; Tsai, S.C.; HUI-PING TSERNG
臺大學術典藏 2019-12-19T07:12:36Z Maintenance strategy for bridge components on the basis of performance Tserng, H.P.; Yin, S.Y.-L.; Chung, C.-L.; HUI-PING TSERNG

Showing items 1-50 of 82  (2 Page(s) Totally)
1 2 > >>
View [10|25|50] records per page