English  |  正體中文  |  简体中文  |  2818693  
???header.visitor??? :  28270173    ???header.onlineuser??? :  842
???header.sponsordeclaration???
 
臺灣學術機構典藏系統 (Taiwan Academic Institutional Repository, TAIR)
???ui.leftmenu.abouttair???

???ui.leftmenu.bartitle???

???index.news???

???ui.leftmenu.copyrighttitle???

???ui.leftmenu.link???

"hwang f j"???jsp.browse.items-by-author.description???

???jsp.browse.items-by-author.back???
???jsp.browse.items-by-author.order1??? ???jsp.browse.items-by-author.order2???

Showing items 1-11 of 11  (1 Page(s) Totally)
1 
View [10|25|50] records per page

Institution Date Title Author
國立臺灣科技大學 2020 Energy-efficient single-machine scheduling problem with controllable job processing times under differential electricity pricing Tsao, Y.-C.;Thanh, V.-V.;Hwang, F.-J.
國立交通大學 2019-04-02T05:59:33Z Survey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machines Hwang, F. J.; Lin, B. M. T.
國立交通大學 2018-08-21T05:53:59Z Two-machine flowshop scheduling with three-operation jobs subject to a fixed job sequence Lin, Bertrand M. T.; Hwang, F. J.; Gupta, Jatinder N. D.
國立交通大學 2017-04-21T06:56:49Z Relocation scheduling subject to fixed processing sequences Lin, Bertrand M. T.; Hwang, F. J.; Kononov, Alexander V.
國立交通大學 2017-04-21T06:55:56Z Two-stage flexible flow shop scheduling subject to fixed job sequences Hwang, F. J.; Lin, Bertrand M. T.
國立交通大學 2017-04-21T06:55:17Z Acquisition planning and scheduling of computing resources Yang, Chien-Nan; Lin, Bertrand M. T.; Hwang, F. J.; Wang, Meng-Chun
國立交通大學 2014-12-08T15:37:35Z Total completion time minimization in a 2-stage differentiation flowshop with fixed sequences per job type Lin, Bertrand M. T.; Hwang, F. J.
國立交通大學 2014-12-08T15:36:21Z Scheduling for fabrication and assembly in a two-machine flowshop with a fixed job sequence Hwang, F. J.; Kovalyov, M. Y.; Lin, B. M. T.
國立交通大學 2014-12-08T15:22:33Z Two-stage assembly-type flowshop batch scheduling problem subject to a fixed job sequence Hwang, F. J.; Lin, B. M. T.
國立交通大學 2014-12-08T15:22:23Z Total completion time minimization in two-machine flow shop scheduling problems with a fixed job sequence Hwang, F. J.; Kovalyov, M. Y.; Lin, B. M. T.
國立交通大學 2014-12-08T15:11:41Z Coupled-task scheduling on a single machine subject to a fixed-job-sequence Hwang, F. J.; Lin, Bertrand M. T.

Showing items 1-11 of 11  (1 Page(s) Totally)
1 
View [10|25|50] records per page