臺大學術典藏 |
2021-08-05T02:37:10Z |
Application of Fault Tree Analysis and Swiss Cheese Model to the Overspeed Derailment of Puyuma Train in Yilan, Taiwan
|
Jong J.-C;Lai Y.-C;Young C.-C;Chen Y.-F.; Jong J.-C; Lai Y.-C; Young C.-C; Chen Y.-F.; YUNG-CHENG LAI |
臺大學術典藏 |
2019-12-24T06:17:47Z |
Development and application of rail transit capacity models in taiwan
|
YUNG-CHENG LAI;Chiang, P.-C.;Huang, S.-H.;Lai, Y.-C.;Jong, J.-C.; Jong, J.-C.; Lai, Y.-C.; Huang, S.-H.; Chiang, P.-C.; YUNG-CHENG LAI |
臺大學術典藏 |
2019-12-20T08:43:07Z |
Decision support system to optimize railway stopping patterns
|
SHYUE-KOONG CHANG;Chang, S.K.;Suen, C.-S.;Jong, J.-C.; Jong, J.-C.; Suen, C.-S.; Chang, S.K.; SHYUE-KOONG CHANG |
臺大學術典藏 |
2019-12-20T08:43:06Z |
Development of two-stage hybrid method to solve high-speed rail train scheduling problem
|
Jong, J.-C.; Chang, S.; Lai, Y.-C.; SHYUE-KOONG CHANG |
淡江大學 |
2013-01 |
Development of a Two-Stage Hybrid Method for Solving High Speed Rail Train Scheduling Problem
|
Jong, J. C.; Chang, S.; Lai, Y. C. |
淡江大學 |
2012-01 |
A Decision Support System to Optimize Railway Stopping Patterns: Application to the Taiwan High Speed Rail
|
Jong, J. C.; Suen, C. S.; Chang, S. K. |
淡江大學 |
2012 |
A Decision Support System to Optimize Railway Stopping Patterns: Application to the Taiwan High Speed Rail
|
Jong, J. C.; Suen, C. S.; Chang, S. K. |
淡江大學 |
2011-07 |
Using Fault Tree Analysis to Identify the Failures of Level Crossing Protection Devices
|
Jong, J. C.; Lin, T. H.; Suen, C. S.; Lee C. K.; Chen, I. C.; Wu, H. J. |
淡江大學 |
2011-06 |
The Impact on Commuter Rail Capacity from Advanced Signaling Systems
|
Lai, Y. C.; Wang, S. H.; Jong, J. C. |
淡江大學 |
2011-05 |
Investigation and Estimation of Train Dwell Time for Timetable Planning
|
Jong, J. C.; Chang, E. F. |
淡江大學 |
2011-01 |
Development of Analytical Capacity Models for Commuter Rail Operations with Advanced Signaling Systems
|
Lai, Y. C.; Wang, S. H.; Jong, J. C. |
淡江大學 |
2011-01 |
Development and Application of Rail Transit Capacity Models in Taiwan
|
Jong, J. C.; Lai, Y. C.; Huang, S. H. ; Chiang, P. C. |
淡江大學 |
2011 |
Development and Application of Rail Transit Capacity Models in Taiwan
|
Jong, J. C.; Lai, Y. C.; Huang, S. H. ; Chiang, P. C. |
國立臺灣大學 |
2011 |
The Risk Analysis on Train Delay Causes of TRA
|
Jong, J.C.; Huang, S.H.; Lee, C.K.; Lai, Y.C.; Lin, K.S.; Liu, J.R. |
國立臺灣大學 |
2011 |
The Impact on Commuter Rail Capacity from Advanced Signaling Systems
|
Lai, Y.C.; Wang, S.H.; Jong, J.C. |
淡江大學 |
2010-12 |
Evaluation of The Capacity Impact on TRA System from Advanced Signaling Systems
|
Lai, Y. C.; Wang, S. H.; Jong, J. C. |
淡江大學 |
2010-01 |
Railway Capacity Model and Decision Support Process for Strategic Capacity Planning
|
Lai, Y. C.; Shih, M. C.; Jong, J. C. |
淡江大學 |
2010 |
The Simulation of Passengers’ Time-Space Characteristics Using Ticket Sales Records with insufficient Data
|
Jong, J. C.; Chang, E. F. |
淡江大學 |
2010 |
The Analysis on Train Reliability of Taiwan High Speed Rail
|
Jong, J. C.; Lin, T. H.; Lee, C. K.; Hu. H. L. |
淡江大學 |
2010 |
Railway Capacity Model and Decision Support Process for Strategic Capacity Planning
|
Lai, Y. C.; Shih, M. C.; Jong, J. C. |
國立臺灣大學 |
2010 |
Evaluation of the Capacity Impact on TRA system from Advanced Signaling systems
|
Lai, Y.C.; Wang, S.H.; Jong, J.C. |
國立臺灣大學 |
2010 |
Rail Capacity Analysis for Urban Rapid Transit System - A Case Study for the Banqiao-Nangang Line of Taipei Metro
|
Jong, J.C.; Hunag, S.H.; Lee, C.K.; Lai, Y.C.; Lin, K.S.; Liu, J.R. |
淡江大學 |
2009-11 |
A capacity analysis on Taiwan high speed rail using a periodic timetabling method
|
Lee, C-K; Jong, J. C.; Chang, E. F. |
淡江大學 |
2009-02 |
A Rail Capacity Model for Estimating Hourly Throughputs with Mixed Traffic and Complex Track Layouts
|
Jong, J. C.; Chang, E. F.; Huang, S H |
淡江大學 |
2008-05 |
Optimizing Train Service Plan for Intercity Railways
|
Jong, J. C.; Suen, Chian-Shan |