|
English
|
正體中文
|
简体中文
|
总笔数 :2817097
|
|
造访人次 :
27674143
在线人数 :
1431
教育部委托研究计画 计画执行:国立台湾大学图书馆
|
|
|
"lee shine der"的相关文件
显示项目 1-18 / 18 (共1页) 1 每页显示[10|25|50]项目
國立成功大學 |
2016-04-03 |
Economic lot sizing in a production system with random demand
|
Lee, Shine-Der; Yang, Chin-Ming; Lan, Shu-Chuan |
國立成功大學 |
2014-07-06 |
A Cut Approach for Solving the Single-Row Machine Layout Problem
|
Lee, Shine-Der |
國立成功大學 |
2014-06 |
ECONOMIC PRODUCTION LOT SIZING MODEL WITH STOCHASTIC DEMAND
|
Lee, Shine-Der; Lan, Shu-Chuan; Yang, Chin-Ming |
國立成功大學 |
2013-10-15 |
Joint production and shipment lot sizing for a delivery price-based production facility
|
Lee, Shine-Der; Fu, Yen-Chen |
國立成功大學 |
2013-03-01 |
An economic production quantity model with a positive resetup point under random demand
|
Lee, Shine-Der; Yang, Chin-Ming |
國立成功大學 |
2013-01 |
Production lot sizing with a secondary outsourcing facility
|
Lee, Shine-Der; Lan, Shu-Chuan |
國立成功大學 |
2008 |
Exact and inexact solution procedures for the order picking in an automated carousal conveyor
|
Lee, Shine-Der; Kuo, Y. C. |
國立成功大學 |
2007-05 |
On solving the discrete location problems when the facilities are prone to failure
|
Lee, Shine-Der; Chang, Wen-Tin |
國立成功大學 |
2004-09 |
Joint determination of machine cells and linear intercell layout
|
Chiang, Chih-Ping; Lee, Shine-Der |
國立成功大學 |
2004-06 |
A genetic-based algorithm with the optimal partition approach for the cell formation in bi-directional linear flow layout
|
Chiang, Chih-Ping; Lee, Shine-Der |
國立成功大學 |
2002-09 |
Buffer sizing in manufacturing production systems with complex routings
|
Lee, Shine-Der; Ho, Siu-Hwa |
國立成功大學 |
2002-03-01 |
Cell formations in the uni-directional loop material handling environment
|
Lee, Shine-Der; Chiang, Chih-Ping |
國立成功大學 |
2001-10 |
A cut-tree-based approach for clustering machine cells in the bidirectional linear flow layout
|
Lee, Shine-Der; Chiang, Chih-Ping |
國立成功大學 |
2001-04 |
Configuring layout in unidirectional loop manufacturing systems
|
Lee, Shine-Der; Huang, Kuo-Hsu; Chiang, Chih-Ping |
國立成功大學 |
2001-04 |
On solving unreliable planar location problems
|
Lee, Shine-Der |
國立成功大學 |
2000-08 |
Buffer sizing in complex cellular manufacturing systems
|
Lee, Shine-Der |
國立成功大學 |
2000-05-16 |
Production lot sizing in failure prone two-stage serial systems
|
Lee, Shine-Der; Rung, J. M. |
國立成功大學 |
1998-06 |
Configuring layout for a cellular manufacturing system
|
Lee, Shine-Der |
显示项目 1-18 / 18 (共1页) 1 每页显示[10|25|50]项目
|