|
English
|
正體中文
|
简体中文
|
总笔数 :2822924
|
|
造访人次 :
30058744
在线人数 :
1202
教育部委托研究计画 计画执行:国立台湾大学图书馆
|
|
|
"leu s s"的相关文件
显示项目 26-45 / 45 (共2页) << < 1 2 每页显示[10|25|50]项目
國立臺灣科技大學 |
2009 |
Bayesian updating of reliability of civil infrastructure facilities based on condition-state data and fault-tree model
|
Ching, J.Y.;Leu, S.S. |
國立臺灣大學 |
2009 |
Bayesian updating of reliability of civil infrastructure facilities based on condition-state data and fault-tree model
|
Ching, J.; Leu, S.-S. |
國立臺灣科技大學 |
2008 |
Project performance evaluation based on statistical process control techniques
|
Leu, S.-S.;Lin, Y.-C. |
國立臺灣科技大學 |
2008 |
Constraint-based clustering model for determining contract packages of bridge maintenance inspection
|
Cheng, Y.-M.;Leu, S.-S. |
國立臺灣科技大學 |
2006-04 |
Data Mining Model for Identifying Project Performance Variables
|
Chang, A.S.;Leu, S.-S. |
國立臺灣科技大學 |
2006 |
Data mining model for identifying project profitability variables
|
Chang, A.S.;Leu, S.-S. |
國立臺灣科技大學 |
2005-12 |
Digital image processing based approach for tunnel excavation faces
|
Leu, S.-S.;Chang, S.-L. |
國立臺灣科技大學 |
2005 |
SPC-based project performance evaluation system
|
Leu S.S.; Lin Y.C.; Chen T.A. |
國立臺灣科技大學 |
2004-05 |
Neural-network-based Regression Model of Ground Surface Settlement Induced by Deep Excavation
|
Leu, S.-S.;Lo, H.-C. |
國立臺灣科技大學 |
2004 |
A frame scaffold layout analysis and derivation system
|
Lin, S. W. ; Chou, S. Y. ; Lo, H. C. ; Leu, S. S. |
國立臺灣科技大學 |
2002-03 |
A Genetic-algorithm-based Resource-constrained Construction Scheduling Simulation Model
|
Leu, S.-S.;Hung, T.-H. |
國立臺灣科技大學 |
2002 |
An Optimal Construction Resource Leveling Scheduling Simulation Model
|
Leu, S.-S.;Hung, T.-H. |
國立臺灣科技大學 |
2001-05 |
Data Mining for Tunnel Support Stability using Neural Networks
|
Leu, S.-S.;Chen, C.-N.;Chang, S.-L. |
國立臺灣科技大學 |
2001-01 |
A GA-based Fuzzy Optimal Model for Construction Time-cost Trade-off
|
Leu, S.-S.;Chen, A.-T.;Yang, C.-H. |
國立臺灣科技大學 |
2001 |
A GA-based Model for Maximizing Precast Plant Production under Resource Constraints
|
Leu, S.-S.;Hwang, S.-T. |
國立臺灣科技大學 |
2000 |
A CPM-based Construction Quality Inspection and Decision-aid System
|
Leu, S.-S.;Tzeng, B.-R. |
國立臺灣科技大學 |
1999-12 |
A Fuzzy Optimal Model for Construction Resource Leveling Scheduling
|
Leu, S.-S.;hen, A.-T.;Yang, C.-H. |
國立臺灣科技大學 |
1999-07 |
Fuzzy Optimal Model for Resource-constrained Construction Scheduling
|
Leu, S.-S.;Chen, A.-T.;Yang, C.-H. |
國立臺灣科技大學 |
1999 |
A Genetic-algorithm-based Resource-constrained Construction Scheduling System
|
Leu, S.-S.;Yang, C.-H. |
國立臺灣科技大學 |
1998 |
Analysis of Powder Factor for Tunnel Blasting using Neural Networks
|
Leu, S.-S.;Lin, S.-F.;Chen, C.-K.;Wang, S.-W. |
显示项目 26-45 / 45 (共2页) << < 1 2 每页显示[10|25|50]项目
|