English  |  正體中文  |  简体中文  |  Total items :2828323  
Visitors :  32224269    Online Users :  985
Project Commissioned by the Ministry of Education
Project Executed by National Taiwan University Library
 
臺灣學術機構典藏系統 (Taiwan Academic Institutional Repository, TAIR)
About TAIR

Browse By

News

Copyright

Related Links

"liao c j"

Return to Browse by Author
Sorting by Title Sort by Date

Showing items 91-115 of 137  (6 Page(s) Totally)
<< < 1 2 3 4 5 6 > >>
View [10|25|50] records per page

Institution Date Title Author
國立臺灣海洋大學 2010 Progress Toward an Asian Marine Core Research Center in Taiwan Ocean Research Institute (TORI) Chou C.-C.;Liao C.-J.;Huang Y.-L.;Chen M.-.T.;Yu P.-S.;Liu S.-Y.;Liu C.-S.
國立臺灣科技大學 2009 Minimizing total tardiness on a single machine with controllable processing times Tseng C.-T.; Liao C.-J.; Huang K.-L.
國立臺灣科技大學 2009 Minimizing the sum of job completion times on capacitated two-parallel machines Liao C.-J.; Chao C.-W.; Lin C.-H.
國立臺灣科技大學 2009 A least flexibility first heuristic to coordinate setups in a two- or three-stage supply chain Liao C.-J.; Shyu C.-C.; Tseng C.-T.
國立臺灣科技大學 2008 Makespan minimization for multiple uniform machines Lin, C. H. ; Liao, C. J.
國立臺灣科技大學 2008 A note on two-stage hybrid flowshop scheduling with missing operations Tseng, C. T. ; Liao, C. J. ; Liao, T. X.
國立臺灣科技大學 2008 Minimizing total tardiness on a single machine with controllable processing times Tseng, C. T. ; Liao, C. J. ; Huang, K. L.
國立臺灣科技大學 2008 Ant colony optimization combined with taboo search for the job shop scheduling problem Huang, K. L. ; Liao, C. J.
國立臺灣科技大學 2008 A discrete particle swarm optimization for lot-streaming flowshop scheduling problem Tseng, C. T. ; Liao, C. J.
國立臺灣科技大學 2008 A least flexibility first heuristic for setup coordination between two and three stages of a supply chain Liao, C. J. ; Shyu, C. C. ; Tseng, C. T.
國立臺灣科技大學 2008 An ant colony optimization algorithm for scheduling in agile manufacturing Liao, C. J. ; Liao, C. C.
國立臺灣科技大學 2008 A particle swarm optimization algorithm for hybrid flow-shop scheduling with multiprocessor tasks Tseng, C. T. ; Liao, C. J.
國立臺灣科技大學 2008 Improved MILP models for two-machine flowshop with batch processing machines Liao, C. J. ; Liao, L. M.
國立臺灣科技大學 2008 Minimizing makespan on parallel machines with machine eligibility restrictions Lin, C. H. ; Liao, C. J.
國立臺灣科技大學 2008 Scheduling on identical machines with batch arrivals in semiconductor testing house Chung T.P.; Liao C.J.; Su L.H.
國立臺灣科技大學 2008 A heuristic for parallel machine scheduling with machine preference for the electroetching of aluminium foil Chao C.W.; Chuang M.C.; Liao C.J.
國立臺灣科技大學 2008 An ant colony optimisation algorithm for scheduling in agile manufacturing Liao, C.-J.;Liao, C.-C.
國立成功大學 2007-08 Laboratory tests for simulating abrasion damage of a woven geotextile Huang, Ching-Chuan; Tzeng, Y. S.; Liao, C. J.
國立臺灣科技大學 2007 A discrete version of particle swarm optimization for flowshop scheduling problems Liao, C. J. ; Tseng, C. T. ; Luarn, P.
國立臺灣科技大學 2007 An ant colony optimization for single machine tardiness scheduling with sequence-dependent setups Liao, C. J. ; Juan, H. C.
國立臺灣科技大學 2007 A variable neighborhood search for minimizing single machine weighted earliness and tardiness with common due date Liao, C. J. ; Cheng, C. C.
國立臺灣科技大學 2007 Makespan minimization for two parallel machines with an unavailable period on each machine Lin, C. H. ; Liao, C. J.
國立臺灣科技大學 2007 Minimizing makespan for two parallel machines with job limit on each availability interval Liao, C. J. ; Chen, C. M. ; Lin, C. H.
國立臺灣科技大學 2007 Performance of organic light-emitting diodes with a mixed emitting layer: Relationship between mixed-layer carrier mobility and efficiency/lifetime Liu S.-W.; Liao C.-J.; Lee C.-C.; Chen C.-T.; Wang J.-K.
國立臺灣科技大學 2007 An ant colony optimization for single-machine tardiness scheduling with sequence-dependent setups Liao, C.-J.;Juan, H.-C.

Showing items 91-115 of 137  (6 Page(s) Totally)
<< < 1 2 3 4 5 6 > >>
View [10|25|50] records per page