國立臺灣海洋大學 |
2010 |
Progress Toward an Asian Marine Core Research Center in Taiwan Ocean Research Institute (TORI)
|
Chou C.-C.;Liao C.-J.;Huang Y.-L.;Chen M.-.T.;Yu P.-S.;Liu S.-Y.;Liu C.-S. |
國立臺灣科技大學 |
2009 |
Minimizing total tardiness on a single machine with controllable processing times
|
Tseng C.-T.; Liao C.-J.; Huang K.-L. |
國立臺灣科技大學 |
2009 |
Minimizing the sum of job completion times on capacitated two-parallel machines
|
Liao C.-J.; Chao C.-W.; Lin C.-H. |
國立臺灣科技大學 |
2009 |
A least flexibility first heuristic to coordinate setups in a two- or three-stage supply chain
|
Liao C.-J.; Shyu C.-C.; Tseng C.-T. |
國立臺灣科技大學 |
2008 |
Makespan minimization for multiple uniform machines
|
Lin, C. H. ; Liao, C. J. |
國立臺灣科技大學 |
2008 |
A note on two-stage hybrid flowshop scheduling with missing operations
|
Tseng, C. T. ; Liao, C. J. ; Liao, T. X. |
國立臺灣科技大學 |
2008 |
Minimizing total tardiness on a single machine with controllable processing times
|
Tseng, C. T. ; Liao, C. J. ; Huang, K. L. |
國立臺灣科技大學 |
2008 |
Ant colony optimization combined with taboo search for the job shop scheduling problem
|
Huang, K. L. ; Liao, C. J. |
國立臺灣科技大學 |
2008 |
A discrete particle swarm optimization for lot-streaming flowshop scheduling problem
|
Tseng, C. T. ; Liao, C. J. |
國立臺灣科技大學 |
2008 |
A least flexibility first heuristic for setup coordination between two and three stages of a supply chain
|
Liao, C. J. ; Shyu, C. C. ; Tseng, C. T. |
國立臺灣科技大學 |
2008 |
An ant colony optimization algorithm for scheduling in agile manufacturing
|
Liao, C. J. ; Liao, C. C. |
國立臺灣科技大學 |
2008 |
A particle swarm optimization algorithm for hybrid flow-shop scheduling with multiprocessor tasks
|
Tseng, C. T. ; Liao, C. J. |
國立臺灣科技大學 |
2008 |
Improved MILP models for two-machine flowshop with batch processing machines
|
Liao, C. J. ; Liao, L. M. |
國立臺灣科技大學 |
2008 |
Minimizing makespan on parallel machines with machine eligibility restrictions
|
Lin, C. H. ; Liao, C. J. |
國立臺灣科技大學 |
2008 |
Scheduling on identical machines with batch arrivals in semiconductor testing house
|
Chung T.P.; Liao C.J.; Su L.H. |
國立臺灣科技大學 |
2008 |
A heuristic for parallel machine scheduling with machine preference for the electroetching of aluminium foil
|
Chao C.W.; Chuang M.C.; Liao C.J. |
國立臺灣科技大學 |
2008 |
An ant colony optimisation algorithm for scheduling in agile manufacturing
|
Liao, C.-J.;Liao, C.-C. |
國立成功大學 |
2007-08 |
Laboratory tests for simulating abrasion damage of a woven geotextile
|
Huang, Ching-Chuan; Tzeng, Y. S.; Liao, C. J. |
國立臺灣科技大學 |
2007 |
A discrete version of particle swarm optimization for flowshop scheduling problems
|
Liao, C. J. ; Tseng, C. T. ; Luarn, P. |
國立臺灣科技大學 |
2007 |
An ant colony optimization for single machine tardiness scheduling with sequence-dependent setups
|
Liao, C. J. ; Juan, H. C. |
國立臺灣科技大學 |
2007 |
A variable neighborhood search for minimizing single machine weighted earliness and tardiness with common due date
|
Liao, C. J. ; Cheng, C. C. |
國立臺灣科技大學 |
2007 |
Makespan minimization for two parallel machines with an unavailable period on each machine
|
Lin, C. H. ; Liao, C. J. |
國立臺灣科技大學 |
2007 |
Minimizing makespan for two parallel machines with job limit on each availability interval
|
Liao, C. J. ; Chen, C. M. ; Lin, C. H. |
國立臺灣科技大學 |
2007 |
Performance of organic light-emitting diodes with a mixed emitting layer: Relationship between mixed-layer carrier mobility and efficiency/lifetime
|
Liu S.-W.; Liao C.-J.; Lee C.-C.; Chen C.-T.; Wang J.-K. |
國立臺灣科技大學 |
2007 |
An ant colony optimization for single-machine tardiness scheduling with sequence-dependent setups
|
Liao, C.-J.;Juan, H.-C. |