國立臺灣大學 |
2006-04 |
Han Chinese Cell and Genome Bank in Taiwan: Purpose, Design and Ethical Considerations
|
Pan, W.-H.; Fann, C.S.J.; Wu, J.-Y.; Hung, Y.-T.; Ho, M.-S.; Tai, T.H.; Chen, Y.-J.; Liao, C.-J.; Yang, M.-L.; Cheng, A.T.-A.; Chen, Y.-T. |
國立臺灣科技大學 |
2006 |
Makespan minimization for two parallel machines with an availability constraint
|
Liao, C. J. ; Shyur, D. L. ; Lin, C. H. |
國立臺灣科技大學 |
2006 |
A performance evaluation of permutation vs.non-permutation schedules in a flowshop
|
Liao, C. J. ; Liao, L. M. ; Tseng, C. T. |
國立臺灣大學 |
2006 |
Sorption of chlorophenols by organo-clay complexes
|
Liao, C. J.; C. P. Chen; Wang, M. K.; P. N. Chiang; C. W. Pai |
國立臺灣科技大學 |
2005 |
Minimizing the total tardiness in a single machine with controllable processing times
|
Tseng, C. T. ; Liao, C. J. ; Huang, K. L. |
國立臺灣科技大學 |
2005 |
Two-stage hybrid flowshop scheduling with missing operations
|
Liao, T. S. ; Tseng, C. T. ; Lu, W. C. ; Liao, C. J. |
國立臺灣科技大學 |
2005 |
Makespan minimization for two parallel machines with an availability constraint
|
Liao C.-J.; Shyur D.-L.; Lin C.-H. |
國立臺灣科技大學 |
2004 |
An ant colony system for permutation flow-shop sequencing
|
Ying, G. C. ; Liao, C. J. |
國立臺灣科技大學 |
2004 |
Makespan Minimization Subject to Flowtime Optimality on Identical Parallel Machines
|
Lin, C. H. ; Liao, C. J. |
國立臺灣科技大學 |
2004 |
Scheduling under machine breakdown in a continuous industry
|
Liao, C. J. ; Chen, W. J. |
國立臺灣科技大學 |
2004 |
Scheduling with Different maintenance Polices in a textile company
|
Chen, W. J. ; Liao, C. J. |
國立臺灣科技大學 |
2004 |
Ant colony optimization combined with taboo search for the job shop scheduling problem
|
Huang, K. L. ; Liao, C. J. |
國立臺灣科技大學 |
2004 |
Minimizing makespan for two parallel machines with job limit on each availability interval
|
Liao, C. J. ; Chen, C. M. ; Lin, C. H. |
國立臺灣科技大學 |
2004 |
An ant colony optimization for single machine weighted tardiness scheduling with sequence-dependent setups
|
Liao, C. J. ; Juan, H. C. |
國立臺灣科技大學 |
2004 |
Makespan Minimization for Two Parallel Machines with Availability Constraints
|
Lin, C. H. ; Liao, C. J. |
國立臺灣科技大學 |
2002 |
局部搜尋法在流程型工廠多準則排程之研究
|
Liao, C. J. |
國立臺灣科技大學 |
2001 |
護士的雇用及排班之整合決策
|
Liao, C. J. |
臺大學術典藏 |
2001 |
Petal-like apatite formed on the surface of tricalcium phosphate ceramic after soaking in distilled water
|
Lin F.-H.;Liao C.-J.;Chen K.-S.;Jui-Sheng Sun;Lin C.-P.; Lin F.-H.; Liao C.-J.; Chen K.-S.; JUI-SHENG SUN; Lin C.-P. |
臺大學術典藏 |
1999 |
The effect of sintered β-dicalcium pyrophosphate particle size on newborn wistar rat osteoblasts
|
Jui-Sheng Sun;Tsuang Y.-H.;Liao C.-J.;Liu H.-C.;Hang Y.-S.;Lin F.-H.; JUI-SHENG SUN; Tsuang Y.-H.; Liao C.-J.; Liu H.-C.; Hang Y.-S.; Lin F.-H. |
國立勤益科技大學 |
1998-11 |
A case study in a dual resource constrained job shop
|
Liao, C.J. ; Lin, H.T. |
國立勤益科技大學 |
1998-07 |
Just-in-Time Manufacture of Home-Use Sewing Machines Using Backward Scheduling
|
Liao, C.J. ; Lin, H.T. |
臺大學術典藏 |
1998 |
Preparation of high-temperature stabilized β-tricalcium phosphate by heating deficient hydroxyapatite with Na4P2O7·10H2O addition
|
Lin F.-H.; Liao C.-J.; Chen K.-S.; JUI-SHENG SUN |