English  |  正體中文  |  简体中文  |  2818744  
???header.visitor??? :  28297743    ???header.onlineuser??? :  574
???header.sponsordeclaration???
 
臺灣學術機構典藏系統 (Taiwan Academic Institutional Repository, TAIR)
???ui.leftmenu.abouttair???

???ui.leftmenu.bartitle???

???index.news???

???ui.leftmenu.copyrighttitle???

???ui.leftmenu.link???

"liao c j"???jsp.browse.items-by-author.description???

???jsp.browse.items-by-author.back???
???jsp.browse.items-by-author.order1??? ???jsp.browse.items-by-author.order2???

Showing items 51-75 of 137  (6 Page(s) Totally)
<< < 1 2 3 4 5 6 > >>
View [10|25|50] records per page

Institution Date Title Author
國立臺灣科技大學 2016 Exploring eco-innovation in dynamic organizational capability under incomplete information in the Taiwanese lighting industry Wu, K.-J;Liao, C.-J;Chen, Chen C.-C;Lin, Y;Tsai, C.F.M.
國立臺灣科技大學 2016 Vision-Based Hand Gesture Recognition System for a Dynamic and Complicated Environment Liao, C.-J;Su, Su S.-F;Chen, M.-C.
國立臺灣科技大學 2016 Two new approaches for a two-stage hybrid flowshop problem with a single batch processing machine under waiting time constraint Chung, T.-P;Sun, H;Liao, C.-J.
國立臺灣科技大學 2015 Exploring decisive factors in green supply chain practices under uncertainty Wu, K.-J.;Liao, C.-J.;Tseng, M.-L.;Chiu, A.S.F.
國立臺灣科技大學 2015 Integrating production and transportation scheduling in a two-stage supply chain Liao, C.-J.;Kuo, Y.-W.;Chung, T.-P.;Shih, S.C.
國立臺灣科技大學 2015 An efficient heuristic for a two-stage assembly scheduling problem with batch setup times to minimize makespan Liao, C.-J.;Lee, C.-H.;Lee, H.-C.
國立臺灣科技大學 2015 Understanding innovation for sustainable business management capabilities and competencies under uncertainty Wu, K.-J.;Liao, C.-J.;Tseng, M.-L.;Chou, P.-J.
國立臺灣科技大學 2015 Vision-Based Hand Gesture Recognition System for a Dynamic and Complicated Environment Liao, C.-J;Su, Su S.-F;Chen, M.-C.
國立臺灣師範大學 2014-12-02T06:33:51Z A comparative study of the professional competences development in Asian sport industry in higher education Cheng, Philip S. T.; Fang, E.; Liao, C. J.; Lin, B.Y.
國立臺灣師範大學 2014-12-02T06:33:51Z A comparative study of the professional competences development in Asian sport industry in higher education Cheng, Philip S. T.; Fang, E.; Liao, C. J.; Lin, B.Y.
國立臺灣科技大學 2014 A canned food scheduling problem with batch due date Chung, T.-P.;Liao, C.-J.;Smith, M.
國立臺灣科技大學 2014 Exploring decisive factors in green supply chain practices under uncertainty Wu, K.-J.;Liao, C.-J.;Tseng, M.-L.;Chiu, A.S.F.
國立臺灣科技大學 2014 Scheduling with multi-attribute setup times on two identical parallel machines Lee, C.-H.;Liao, C.-J.;Chung, T.-P.
國立臺灣科技大學 2014 A comparison of five hybrid metaheuristic algorithms for unrelated parallel-machine scheduling and inbound trucks sequencing in multi-door cross docking systems Liao, T.W.;Chang, P.C.;Kuo, R.J.;Liao, C.-J.
國立臺灣科技大學 2014 Unrelated parallel machine scheduling with dedicated machines and common deadline Lee, C.-H.;Liao, C.-J.;Chao, C.-W.
國立臺灣科技大學 2014 Risk management for outsourcing biomedical waste disposal - Using the failure mode and effects analysis Liao, C.-J.;Ho, C.C.
國立臺灣科技大學 2013 An immunoglobulin-based artificial immune system for solving the hybrid flow shop problem Chung, T.-P.;Liao, C.-J.
國立臺灣科技大學 2013 Batch scheduling problem for a machinery factory with fixed-position layout Lin, R.;Liao, C.-J.
國立臺灣科技大學 2013 Meta-heuristics for manufacturing scheduling and logistics problems Liao, C.-J.;Gen, M.;Tiwari, M.K.;Chang, P.-C.
國立臺灣科技大學 2013 Evaluation of advantages of an energy storage system using recycled EV batteries Chen, T.-H.;Hsieh, T.-Y.;Yang, N.-C.;Yang, J.-S.;Liao, C.-J.
國立臺灣科技大學 2012 Scheduling with multi-attribute setup times Lee, C.-H.;Liao, C.-J.;Chao, C.-W.
國立臺灣科技大學 2012 A case study of batch scheduling for an assembly shop Lin, R.;Liao, C.-J.
國立臺灣科技大學 2012 A discrete electromagnetism-like mechanism for single machine total weighted tardiness problem with sequence-dependent setup times Chao, C.-W.;Liao, C.-J.
國立臺灣科技大學 2012 An approach using particle swarm optimization and bottleneck heuristic to solve hybrid flow shop scheduling problem Liao, C.-J.;Tjandradjaja, E.;Chung, T.-P.
國立臺灣科技大學 2012 Neighborhood search procedures for single machine tardiness scheduling with sequence-dependent setups Liao, C.-J.;Tsou, H.-H.;Huang, K.-L.

Showing items 51-75 of 137  (6 Page(s) Totally)
<< < 1 2 3 4 5 6 > >>
View [10|25|50] records per page