English  |  正體中文  |  简体中文  |  Total items :2825920  
Visitors :  31408289    Online Users :  920
Project Commissioned by the Ministry of Education
Project Executed by National Taiwan University Library
 
臺灣學術機構典藏系統 (Taiwan Academic Institutional Repository, TAIR)
About TAIR

Browse By

News

Copyright

Related Links

"ling huey su"

Return to Browse by Author
Sorting by Title Sort by Date

Showing items 1-11 of 11  (1 Page(s) Totally)
1 
View [10|25|50] records per page

Institution Date Title Author
中原大學 2009-10-28 Infinite capacity planning for IC packaging plants James C. Chen; Ling-Huey Su; Cheng-Ju Sun; Mei-Feng Hsu
中原大學 2009-02 Minimizing earliness and tardiness subject to total completion time in an identical parallel machine system Ling-Huey Su
中原大學 2009 Scheduling on identical parallel machines to minimize total completion time with deadline and machine eligibility constraints Ling-Huey Su
中原大學 2009 Scheduling parallel machines with resource-dependent processing times Ling-Huey Su; Chun-Yuan Lien
中原大學 2009 A two-stage flowshop scheduling with limited buffer storage Ling-Huey Su; Dar-Li Yang; Hou-Kuan Chou
中原大學 2003 A hybrid two-stage flowshop with limited waiting time constraints Ling-Huey Su
中原大學 2001-09 Heuristic for scheduling in a bicriteria single machine problem Ling-Huey Su;Fuh-Der Chou
中原大學 2001 Scheduling n jobs on one machine to minimize the maximum lateness with a minimum number of tardy jobs Pei-Chann Chang;Ling-Huey Su
中原大學 2000-12 Scheduling job iwth burn in board constraint on semiconductor burn-in operations to minimize the mean flow time Hui-Mei Wang;Ling-Huey Su;Pei-Chann Chang;
中原大學 2000 Heuristic for Scheduling in a Two-machine Bicriteria Dynamic Flowshop with Setup and Processing Times Separated Ling-Huey Su;Fuh-Der Chou
元智大學 1997 有關延遲時間與完工時間在零工工廠排程之研究 蘇玲慧; Ling-Huey Su

Showing items 1-11 of 11  (1 Page(s) Totally)
1 
View [10|25|50] records per page