|
"luh p b"的相关文件
显示项目 11-28 / 28 (共2页) 1 2 > >> 每页显示[10|25|50]项目
| 臺大學術典藏 |
2018-09-10T07:04:07Z |
Payment cost minimization auction for deregulated electricity markets with transmission capacity constraints
|
Zhao, F.; Luh, P.B.; Yan, J.H.; Stern, G.A.; Chang, S.-C.; SHI-CHUNG CHANG |
| 臺大學術典藏 |
2018-09-10T07:04:07Z |
Modeling and optimization of crowd guidance for building emergency evacuation
|
Wang, P.; Luh, P.B.; Chang, S.-C.; Sun, J.; SHI-CHUNG CHANG |
| 臺大學術典藏 |
2018-09-10T07:04:07Z |
Group elevator scheduling with advance information for normal and emergency modes
|
Luh, P.B.; Xiong, B.; Chang, S.-C.; SHI-CHUNG CHANG |
| 臺大學術典藏 |
2018-09-10T06:31:19Z |
Coherent modeling and effective coordination for building emergency evacuation
|
Xiong, B.; Luh, P.B.; Chang, S.-C.; Michel, L.; See, A.; SHI-CHUNG CHANG |
| 臺大學術典藏 |
2018-09-10T05:58:46Z |
Payment cost minimization auction for deregulated electricity markets using surrogate optimization
|
Luh, P.B.; Blankson, W.E.; Chen, Y.; Yan, J.H.; Stern, G.A.; Chang, S.-C.; Zhao, F.; SHI-CHUNG CHANG |
| 臺大學術典藏 |
2018-09-10T05:23:44Z |
OPTIMAL TASK ALLOCATION OF TWO SERVICE STATIONS WITH THREE CLASSES OF TASKS.
|
Wu, Z.J.;Luh, P.B.;Chang, S.C.;Serfaty, D.;Kleinman, D.L.;Castanon, D.A.; Wu, Z.J.; Luh, P.B.; Chang, S.C.; Serfaty, D.; Kleinman, D.L.; Castanon, D.A.; SHI-CHUNG CHANG |
| 臺大學術典藏 |
2018-09-10T05:23:43Z |
Achieving x-sigma deliveries in supply chains
|
Yu, D.; Luh, P.B.; Chang, S.-C.; SHI-CHUNG CHANG |
| 臺大學術典藏 |
2018-09-10T05:23:42Z |
Coherent configuration and operation of building transportation systems
|
Luh, P.B.; Michel, L.; Santos Jr.; E.; Yu, D.; See, A.; Xiong, B.; Johnson, G.; Chang, S.C.; SHI-CHUNG CHANG |
| 臺大學術典藏 |
2018-09-10T04:55:25Z |
Optimal auction for the deregulated electricity market using augmented lagrangian and surrogate optimization
|
Luh, P.B.;Blankson, W.E.;Chen, Y.;Yan, J.H.;Stern, G.A.;Chang, S.-C.;Zhao, F.; Luh, P.B.; Blankson, W.E.; Chen, Y.; Yan, J.H.; Stern, G.A.; Chang, S.-C.; Zhao, F.; SHI-CHUNG CHANG |
| 國立臺灣科技大學 |
2017 |
Head Dependence of Pump-Storage-Unit Model Applied to Generation Scheduling
|
Chen, Chen C.-H.;Chen, N.;Luh, P.B. |
| 臺大學術典藏 |
2012 |
Truthful auction mechanism design for short-interval secondary spectrum access market
|
Zhan, S.-C.; Chang, S.-C.; Luh, P.B.; Lieu, H.-H.; SHI-CHUNG CHANG |
| 國立臺灣大學 |
2006 |
Payment cost minimization auction for deregulated electricity markets using surrogate optimization
|
Luh, P.B.; Blankson, W.E.; Chen, Ying; Yan, J.H.; Stern, G.A.; Chang, Shi-Chung; Zhao, Feng |
| 臺大學術典藏 |
2006 |
Payment cost minimization auction for deregulated electricity markets using surrogate optimization
|
Luh, P.B.;Blankson, W.E.;Chen, Ying;Yan, J.H.;Stern, G.A.;Chang, Shi-Chung;Zhao, Feng; Luh, P.B.; Blankson, W.E.; Chen, Ying; Yan, J.H.; Stern, G.A.; Chang, Shi-Chung; Zhao, Feng; Luh, P.B.; Blankson, W.E.; Chen, Ying; Yan, J.H.; Stern, G.A.; Chang, Shi-Chung; Zhao, Feng |
| 國立臺灣大學 |
2005 |
A 1600-MIPS parallel processor IC for job-shop scheduling
|
Chen, Kuan-Hung; Chiueh, Tzi-Dar; Chang, Shi-Chung; Luh, P.B. |
| 國立臺灣大學 |
2005 |
Design and Implementation of a Parallel Processor IC for Job Shop Scheduling
|
Chen, K.-H.; Chiueh, T.- D.; Chang, S.-C.; Luh, P. B. |
| 臺大學術典藏 |
2005 |
A 1600-MIPS parallel processor IC for job-shop scheduling
|
Chen, Kuan-Hung; Chiueh, Tzi-Dar; Chang, Shi-Chung; Luh, P.B.; Chen, Kuan-Hung; Chiueh, Tzi-Dar; Chang, Shi-Chung; Luh, P.B. |
| 國立臺灣大學 |
2001-05 |
SIMD architecture for job shop scheduling problem solving
|
Chen, Kuan-Hung; Chang, Shi-Chung; Chiueh, Tzi-Dor; Luh, P.B.; Zhao, Xing |
| 臺大學術典藏 |
1990 |
Hydroelectric generation scheduling with an effective differential dynamic programming algorithm
|
Chang, S.C.;Chen, C.H.;Kong Fong, I.;Luh, P.B.; Chang, S.C.; Chen, C.H.; Kong Fong, I.; Luh, P.B.; SHI-CHUNG CHANG |
显示项目 11-28 / 28 (共2页) 1 2 > >> 每页显示[10|25|50]项目
|