| 國立交通大學 |
2014-12-08T15:47:53Z |
Economic design of (x)over-bar-control charts for continuous flow process with multiple assignable causes
|
Yang, Yit-Ming; Su, Chia-Yi; Pearn, W. L. |
| 國立交通大學 |
2014-12-08T15:38:07Z |
Optimal management for infinite capacity N-policy M/G/1 queue with a removable service station
|
Chang, Y. C.; Pearn, W. L. |
| 國立交通大學 |
2014-12-08T15:37:39Z |
An effective powerful test for one-sided supplier selection problem
|
Pearn, W. L.; Hung, H. N.; Chuang, Y. S.; Su, R. H. |
| 國立交通大學 |
2014-12-08T15:36:55Z |
Product Acceptance Determination for Processes with Multiple Independent Lines
|
Pearn, W. L.; Wu, C. H.; Chuang, C. C. |
| 國立交通大學 |
2014-12-08T15:32:20Z |
Supplier Selection Critical Decision Values for Processes with Multiple Independent Lines
|
Pearn, W. L.; Wu, C. H. |
| 國立交通大學 |
2014-12-08T15:31:13Z |
Supplier Selection for Processes with Multiple Characteristics Based on Testing Capability Index C-pk
|
Pearn, W. L.; Wu, C. H. |
| 國立交通大學 |
2014-12-08T15:31:12Z |
A Close Form Solution for the Product Acceptance Determination Based on the Popular Index C-pk
|
Pearn, W. L.; Wu, C. H. |
| 國立交通大學 |
2014-12-08T15:30:57Z |
Assessing Profitability of a Newsboy-Type Product with Normally Distributed Demand Based on Multiple Samples
|
Su, Rung-Hung; Yang, Dong-Yuh; Pearn, W. L. |
| 國立交通大學 |
2014-12-08T15:30:36Z |
Yield-Related Process Capability Indices for Processes of Multiple Quality Characteristics
|
Shiau, Jyh-Jen Horng; Yen, Chia-Ling; Pearn, W. L.; Lee, Wan-Tsz |
| 國立交通大學 |
2014-12-08T15:29:51Z |
Supplier Selection for Multiple-Characteristics Processes with One-Sided Specifications
|
Pearn, W. L.; Wu, C. H. |
| 國立交通大學 |
2014-12-08T15:29:44Z |
Measuring PPM Non-conformities for Processes with Asymmetric Tolerances
|
Pearn, W. L.; Wu, C. H. |
| 國立交通大學 |
2014-12-08T15:29:40Z |
Comparative analysis of a randomized N-policy queue: An improved maximum entropy method
|
Wang, Kuo-Hsiung; Yang, Dong-Yuh; Pearn, W. L. |
| 國立交通大學 |
2014-12-08T15:29:25Z |
A Note on "Capability Assessment for Processes with Multiple Characteristics: A Generalization of the Popular Index Cpk"
|
Pearn, W. L.; Wu, C. H.; Tsai, M. C. |
| 國立交通大學 |
2014-12-08T15:29:25Z |
An Extension of the Product Acceptance Determination for One-Sided Process with Multiple Characteristics
|
Pearn, W. L.; Wu, C. H.; Hung, H. N.; Kao, C. M. |
| 國立交通大學 |
2014-12-08T15:29:19Z |
Profitability evaluation for newsboy-type product with normally distributed demand
|
Su, R. H.; Pearn, W. L. |
| 國立交通大學 |
2014-12-08T15:29:14Z |
Profitability evaluation for newsboy-type product with normally distributed demand
|
Su, R. H.; Pearn, W. L. |
| 國立交通大學 |
2014-12-08T15:29:08Z |
The burn-in test scheduling problem with batch dependent processing time and sequence dependent setup time
|
Pearn, W. L.; Hong, J. S.; Tai, Y. T. |
| 國立交通大學 |
2014-12-08T15:29:01Z |
A wind turbine evaluation model under a multi-criteria decision making environment
|
Lee, Amy H. I.; Hung, Meng-Chan; Kang, He-Yau; Pearn, W. L. |
| 國立交通大學 |
2014-12-08T15:28:33Z |
Precision Tool Condition Monitoring for Grinding Wheel in IC Manufacturing of Silicon Wafer
|
Hsu, Ya-Chen; Pearn, W. L.; Chuang, Ya-Fei |
| 國立交通大學 |
2014-12-08T15:27:21Z |
The Interrelationship Between N-policy M/G/1/K and F-policy G/M/1/K Queues with Startup Time
|
Kuo, Ching-Chang; Wang, Kuo-Hsiung; Pearn, W. L. |
| 國立交通大學 |
2014-12-08T15:24:05Z |
An Effective Powerful Test for Supplier Selection Evaluation with Multiple Characteristics
|
Pearn, W. L.; Tai, Y. T.; Wang, C. Y. |
| 國立交通大學 |
2014-12-08T15:24:05Z |
Implementation of Evaluating Process Capability Index C-pk for Processes with Multiple Characteristics
|
Pearn, W. L.; Wu, C. H. |
| 國立交通大學 |
2014-12-08T15:23:16Z |
Measuring the Manufacturing Yield for Processes With Multiple Manufacturing Lines
|
Tai, Y. T.; Pearn, W. L.; Kao, Chun-Min |
| 國立交通大學 |
2014-12-08T15:22:56Z |
Cycle time estimation for semiconductor final testing processes with Weibull-distributed waiting time
|
Tai, Y. T.; Pearn, W. L.; Lee, J. H. |
| 國立交通大學 |
2014-12-08T15:22:35Z |
An Effective Procedure for Calculating Weibull Production Yield with Mean Shift
|
Hsu, Ya-Chen; Pearn, W. L.; Li, Yuan-Yi |
| 國立交通大學 |
2014-12-08T15:21:51Z |
ANALYTICAL METHOD FOR ACCURACY ANALYSIS OF THE RANDOMIZED T-POLICY QUEUE
|
Wang, Kuo-Hsiung; Yang, Dong-Yuh; Pearn, W. L. |
| 國立交通大學 |
2014-12-08T15:21:23Z |
Production yield measure for multiple characteristics processes based on S-pk(T) under multiple samples
|
Pearn, W. L.; Yen, Ching-Ho; Yang, Dong-Yuh |
| 國立交通大學 |
2014-12-08T15:21:13Z |
An Integrated Multi-Criteria Decision Making Model for Evaluating Wind Farm Performance
|
Kang, He-Yau; Hung, Meng-Chan; Pearn, W. L.; Lee, Amy H. I.; Kang, Mei-Sung |
| 國立交通大學 |
2014-12-08T15:21:02Z |
An Effective Test for Supplier Selection Evaluation with Multiple Characteristics
|
Tai, Y. T.; Pearn, W. L.; You, S. K. |
| 國立交通大學 |
2014-12-08T15:20:59Z |
Capability Assessment for Processes with Multiple Characteristics: A Generalization of the Popular Index C(pk)
|
Pearn, W. L.; Shiau, J. -J. H.; Tai, Y. T.; Li, M. Y. |
| 國立交通大學 |
2014-12-08T15:20:51Z |
Efficient Tool Replacement Procedure Based on Yield Evaluation
|
Lin, Chen-ju; Pearn, W. L. |
| 國立交通大學 |
2014-12-08T15:20:49Z |
Two Tests for Supplier Selection Based on Process Yield
|
Pearn, W. L.; Liao, Mou-Yuan; Wu, Chien-Wei; Chu, Yao-Tsung |
| 國立交通大學 |
2014-12-08T15:20:48Z |
Process Capability Evaluation for Square Bumps with Mean Shift
|
Pearn, W. L.; Hung, H. N.; Tai, Y. T.; Hou, H. H. |
| 國立交通大學 |
2014-12-08T15:20:33Z |
Optimal production run time for two-stage production system with imperfect processes and allowable shortages
|
Pearn, W. L.; Su, R. H.; Weng, M. W.; Hsu, C. H. |
| 國立交通大學 |
2014-12-08T15:16:25Z |
Multiple-process performance analysis chart based on process loss indices
|
Pearn, W. L.; Chang, Y. C.; Wu, Chien-Wei |
| 國立交通大學 |
2014-12-08T15:15:41Z |
Precision measures for processes with multiple manufacturing lines
|
Pearn, W. L.; Chang, C. S. |
| 國立交通大學 |
2014-12-08T15:15:33Z |
Bayesian approach for measuring EEPROM process capability based on the one-sided indices C-PU and C-PL
|
Wu, Chien-Wei; Pearn, W. L. |
| 國立交通大學 |
2014-12-08T15:15:31Z |
One-sided process capability assessment in the presence of measurement errors
|
Pearn, W. L.; Liao, Mou-Yuan |
| 國立交通大學 |
2014-12-08T15:15:29Z |
Measuring production yield for processes with multiple quality characteristics
|
Pearn, W. L.; Wang, F. K.; Yen, C. H. |
| 國立交通大學 |
2014-12-08T15:15:20Z |
Measuring process performance based on expected loss with asymmetric tolerances
|
Pearn, W. L.; Chang, Y. C.; Wu, Chien-Wei |
| 國立交通大學 |
2014-12-08T15:15:10Z |
Accuracy analysis of the percentile method for estimating non normal manufacturing quality
|
Wu, Chien-Wei; Pearn, W. L.; Chang, C. S.; Chen, H. C. |
| 國立交通大學 |
2014-12-08T15:15:01Z |
On the sampling distributions of the estimated process loss indices with asymmetric tolerances
|
Chang, Y. C.; Pearn, W. L.; Wu, Chien-Wei |
| 國立交通大學 |
2014-12-08T15:15:01Z |
Multivariate capability indices: Distributional and inferential properties
|
Pearn, W. L.; Wang, F. K.; Yen, C. H. |
| 國立交通大學 |
2014-12-08T15:15:01Z |
Optimal management for a finite M/M/R queueing system with two arrival modes
|
Wang, Kuo-Hsiung; Ke, Jyh-Bin; Pearn, W. L. |
| 國立交通大學 |
2014-12-08T15:15:01Z |
A comparison of two methods for transforming non-normal manufacturing data
|
Chung, S. H.; Pearn, W. L.; Yang, Y. S. |
| 國立交通大學 |
2014-12-08T15:15:00Z |
Estimating process yield based on S-pk for multiple samples
|
Pearn, W. L.; Cheng, Ya Ching |
| 國立交通大學 |
2014-12-08T15:14:47Z |
An effective decision making method for product acceptance
|
Pearn, W. L.; Wu, Chien-Wei |
| 國立交通大學 |
2014-12-08T15:14:22Z |
Scheduling integrated circuit assembly operations on die bonder
|
Pearn, W. L.; Chung, S. H.; Lai, C. M. |
| 國立交通大學 |
2014-12-08T15:14:10Z |
Due-date assignment for wafer fabrication under demand variate environment
|
Pearn, W. L.; Chung, S. H.; Lai, C. A. |
| 國立交通大學 |
2014-12-08T15:13:35Z |
Measuring process capability based on Cpmk with gauge measurement errors
|
Hsu, B. M.; Shu, M. H.; Pearn, W. L. |