| 國立交通大學 |
2014-12-08T15:15:00Z |
Estimating process yield based on S-pk for multiple samples
|
Pearn, W. L.; Cheng, Ya Ching |
| 國立交通大學 |
2014-12-08T15:14:47Z |
An effective decision making method for product acceptance
|
Pearn, W. L.; Wu, Chien-Wei |
| 國立交通大學 |
2014-12-08T15:14:22Z |
Scheduling integrated circuit assembly operations on die bonder
|
Pearn, W. L.; Chung, S. H.; Lai, C. M. |
| 國立交通大學 |
2014-12-08T15:14:10Z |
Due-date assignment for wafer fabrication under demand variate environment
|
Pearn, W. L.; Chung, S. H.; Lai, C. A. |
| 國立交通大學 |
2014-12-08T15:13:35Z |
Measuring process capability based on Cpmk with gauge measurement errors
|
Hsu, B. M.; Shu, M. H.; Pearn, W. L. |
| 國立交通大學 |
2014-12-08T15:13:35Z |
Optimal tool replacement for processes with low fraction defective
|
Pearn, W. L.; Hsu, Ya-Chen |
| 國立交通大學 |
2014-12-08T15:13:32Z |
Tool replacement policy for one-sided processes with low fraction defective
|
Pearn, W. L.; Hsu, Y-C; Shiau, J-J Horng |
| 國立交通大學 |
2014-12-08T15:13:19Z |
Estimating and testing process precision with presence of gauge measurement errors
|
Pearn, W. L.; Liao, Mou-Yuan |
| 國立交通大學 |
2014-12-08T15:13:11Z |
Optimal control of an M/G/1/K queueing system with combined F policy and startup time
|
Wang, K.-H.; Kuo, C.-C.; Pearn, W. L. |
| 國立交通大學 |
2014-12-08T15:13:01Z |
Testing process precision for truncated normal distributions
|
Pearn, W. L.; Hung, H. N.; Peng, N. F.; Huang, C. Y. |
| 國立交通大學 |
2014-12-08T15:12:55Z |
Bootstrap approach for supplier selection based on production yield
|
Wu, C. -W.; Shu, M. H.; Pearn, W. L.; Liu, K. H. |
| 國立交通大學 |
2014-12-08T15:12:41Z |
A variables sampling plan based on C-pmk for product acceptance determination
|
Wu, Chien-Wei; Pearn, W. L. |
| 國立交通大學 |
2014-12-08T15:12:05Z |
Decision-making in a single-period inventory environment with fuzzy demand
|
Su, Rung-Hung; Yang, Dong-Yuh; Pearn, W. L. |
| 國立交通大學 |
2014-12-08T15:11:26Z |
A recursive method for the F-policy G/M/1/K queueing system with an exponential startup time
|
Wang, Kuo-Hsiung; Kuo, Ching-Chang; Pearn, W. L. |
| 國立交通大學 |
2014-12-08T15:10:35Z |
Capability adjustment or gamma processes with mean shift consideration in implementing Six Sigma program
|
Hsu, Ya-Chen; Pearn, W. L.; Wu, Pei-Ching |
| 國立交通大學 |
2014-12-08T15:10:25Z |
A comparison of methods for estimating loss-based capability index
|
Wu, Chien-Wei; Shu, Ming-Hung; Pearn, W. L.; Cheng, Feng-Tsung |
| 國立交通大學 |
2014-12-08T15:10:15Z |
An Improved Approach for Estimating Product Performance Based on the Capability Index C(pmk)
|
Pearn, W. L.; Yang, Dong-Yuh; Cheng, Ya-Ching |
| 國立交通大學 |
2014-12-08T15:10:14Z |
Select better suppliers based on manufacturing precision for processes with multivariate data
|
Yen, C. H.; Pearn, W. L. |
| 國立交通大學 |
2014-12-08T15:10:14Z |
Minimising makespan on parallel batch processing machines with non-identical ready time and arbitrary job sizes
|
Chung, S. H.; Tai, Y. T.; Pearn, W. L. |
| 國立交通大學 |
2014-12-08T15:10:05Z |
An overview of theory and practice on process capability indices for quality assurance
|
Wu, Chien-Wei; Pearn, W. L.; Kotz, Samuel |
| 國立交通大學 |
2014-12-08T15:09:13Z |
An Effective Scheduling Approach for Maximizing Polyimide Printing Weighted Throughput in Cell Assembly Factories
|
Chung, S. H.; Tai, Y. T.; Pearn, W. L. |
| 國立交通大學 |
2014-12-08T15:09:13Z |
Statistical Approach for Cycle Time Estimation in Semiconductor Packaging Factories
|
Pearn, W. L.; Tai, Yu-Ting; Lee, J. H. |
| 國立交通大學 |
2014-12-08T15:09:11Z |
Fast and effective algorithms for the liquid crystal display module (LCM) scheduling problem with sequence-dependent setup time
|
Chung, S. H.; Pearn, W. L.; Tai, Y. T. |
| 國立交通大學 |
2014-12-08T15:09:02Z |
Photolithography Control in Wafer Fabrication Based on Process Capability Indices With Multiple Characteristics
|
Pearn, W. L.; Kang, H. Y.; Lee, A. H. -I.; Liao, M. Y. |
| 國立交通大學 |
2014-12-08T15:09:02Z |
Sample size determination for production yield estimation with multiple independent process characteristics
|
Hsu, Ya-Chen; Pearn, W. L.; Chuang, Ya-Fei |