English  |  正體中文  |  简体中文  |  2819103  
???header.visitor??? :  28447155    ???header.onlineuser??? :  655
???header.sponsordeclaration???
 
臺灣學術機構典藏系統 (Taiwan Academic Institutional Repository, TAIR)
???ui.leftmenu.abouttair???

???ui.leftmenu.bartitle???

???index.news???

???ui.leftmenu.copyrighttitle???

???ui.leftmenu.link???

"pearn wen lea"???jsp.browse.items-by-author.description???

???jsp.browse.items-by-author.back???
???jsp.browse.items-by-author.order1??? ???jsp.browse.items-by-author.order2???

Showing items 46-70 of 76  (4 Page(s) Totally)
<< < 1 2 3 4 > >>
View [10|25|50] records per page

Institution Date Title Author
國立交通大學 2014-12-12T02:14:35Z 多郵差在有向網路中之運輸問題 洪志勳; Hong, Jr-Shiun; 彭文理; Pearn Wen-Lea
國立交通大學 2014-12-12T02:14:35Z 混合網路上的多郵差問題 曾海裕; Tzeng, Hae-Yuh; 彭文理; Pearn Wen-Lea
國立交通大學 2014-12-12T01:50:53Z TFT-LCD模組廠物料配置問題求解模式之構建 薛武; Hsueh, Wu; 彭文裡; 鍾淑馨; Pearn, Wen-Lea; Chung, Shu-Hsing
國立交通大學 2014-12-12T01:50:50Z 太陽能廠電池段製程主生產排程規劃系統之構建 李盛中; Li, Sheng-Chung; 彭文理; Pearn, Wen-Lea
國立交通大學 2014-12-12T01:50:49Z 單邊規格多品質特性製程能力量測 蔡孟純; Tsai, Meng-Chun; 彭文理; Pearn, Wen-Lea
國立交通大學 2014-12-12T01:50:49Z 多品質特性雙邊規格的供應商選擇問題:一個高檢定力有效的檢定方法 王振宇; Wang, Chen-Yu; 彭文理; Pearn, Wen-Lea
國立交通大學 2014-12-12T01:50:49Z 太陽能廠晶錠-晶圓製程主生產排程規劃系統之構建 黃博祥; Huang, Po-Hsiang; 鍾淑馨; 彭文理; Chung, Shu-Hsing; Pearn, Wen-Lea
國立交通大學 2014-12-12T01:50:49Z 太陽能模組裝配廠主生產排程規劃系統之構建 饒峰銘; Rao, Fong-Ming; 鍾淑馨; 彭文理; Chung, Shu-Hsing; Pearn, Wen-Lea
國立交通大學 2014-12-12T01:50:10Z 單邊規格多品質特性製程之抽樣計畫 高君敏; Kao, Chun-Min; 彭文理; 洪慧念; Pearn, Wen-Lea; Hung, Hui-Nien
國立交通大學 2014-12-12T01:41:41Z S-DBR與CCPM的緩衝管理於不同環境之影響 謝政峰; 李榮貴; 彭文理; Li, Rong-Kwei; Pearn, Wen-Lea
國立交通大學 2014-12-12T01:31:51Z 考慮多品質特性製程之計量抽樣計劃 李佳蕙; Lee, Jia-Huei; 彭文理; Pearn, Wen-Lea
國立交通大學 2014-12-12T01:31:46Z 考慮Gamma製程變異數發生變動下之製程能力調整 古品倫; Ku, Pin-Lun; 彭文理; Pearn, Wen-Lea
國立交通大學 2014-12-12T01:25:37Z 衡量報童類型產品的獲利能力之可達成能力指標及其應用 蘇榮弘; Su, Rung-Hung; 彭文理; Pearn, Wen-Lea
國立交通大學 2014-12-12T01:21:55Z 考量整備時間與工件動態到達之單機延遲時間分析模型 高清貴; Kao, Ching-Kuei; 鍾淑馨; 彭文理; Chung, Shu-Hsing; Pearn, Wen-Lea
國立交通大學 2014-12-08T15:37:44Z Multi-server retrial queue with second optional service: algorithmic computation and optimisation Ke, Jau-Chuan; Wu, Chia-Huang; Pearn, Wen Lea
國立交通大學 2014-12-08T15:36:07Z Capability Assessment for Weibull In-Cell Touch Panel Manufacturing Processes With Variance Change Tai, Yu-Ting; Pearn, Wen Lea; Huang, Kai-Bin; Liao, Lu-Wei
國立交通大學 2014-12-08T15:34:13Z Analytic Solution to Product Acceptance Determination for Gold Bumping Process With Multiple Manufacturing Lines Pearn, Wen Lea; Tai, Yu Ting; Wu, Chia Huang; Chuang, Ching Ching
國立交通大學 2014-12-08T15:31:28Z The performance measures and randomized optimization for an unreliable server M([x])/G/1 vacation system Ke, Jau-Chuan; Huang, Kai-Bin; Pearn, Wen Lea
國立交通大學 2014-12-08T15:30:35Z Analysis of an infinite multi-server queue with an optional service Ke, Jau-Chuan; Wu, Chia-Huang; Pearn, Wen Lea
國立交通大學 2014-12-08T15:29:25Z A heuristic algorithm for the optimization of a retrial system with Bernoulli vacation Ke, Jau-Chuan; Wu, Chia-Huang; Pearn, Wen Lea
國立交通大學 2014-12-08T15:29:24Z Product selection for newsboy-type products with normal demands and unequal costs Su, Rung Hung; Pearn, Wen Lea
國立交通大學 2014-12-08T15:29:03Z Accessing Manufacturing Yield for Gamma Wafer Sawing Processes in COG Packaging Pearn, Wen-Lea; Tai, Yu-Ting; Huang, Kai-Bin; Ku, Pin-Lun
國立交通大學 2014-12-08T15:20:54Z A batch arrival queue under randomised multi-vacation policy with unreliable server and repair Ke, Jau-Chuan; Huang, Kai-Bin; Pearn, Wen Lea
國立交通大學 2014-12-08T15:17:17Z Measuring production performance of different product mixes in semiconductor fabrication Chung, Shu-Hsing; Pearn, Wen Lea; Lee, Amy H. I.
國立交通大學 2014-12-08T15:13:18Z Optimal control of the N policy M/G/1 queueing system with server breakdowns and general startup times Wang, Kuo-Hsiung; Wang, Tsung-Yin; Pearn, Wen Lea

Showing items 46-70 of 76  (4 Page(s) Totally)
<< < 1 2 3 4 > >>
View [10|25|50] records per page