|
"pearn wl"的相關文件
顯示項目 66-90 / 91 (共4頁) << < 1 2 3 4 > >> 每頁顯示[10|25|50]項目
國立交通大學 |
2014-12-08T15:18:52Z |
Maximum entropy analysis to the N policy M/G/1 queueing system with server breakdowns and general startup times
|
Wang, KH; Wang, TY; Pearn, WL |
國立交通大學 |
2014-12-08T15:18:33Z |
The integrated circuit packaging scheduling problem (ICPSP): A case study
|
Pearn, WL; Chung, SH; Yang, MH; Chen, CY |
國立交通大學 |
2014-12-08T15:18:31Z |
A service level model for the control wafers safety inventory problem
|
Chung, SH; Kang, HY; Pearn, WL |
國立交通大學 |
2014-12-08T15:18:23Z |
A Bayesian approach for assessing process precision based on multiple samples
|
Pearn, WL; Wu, CW |
國立交通大學 |
2014-12-08T15:18:20Z |
A Bayesian approach to obtain a lower bound for the C-pm capability index
|
Lin, GH; Pearn, WL; Yang, YS |
國立交通大學 |
2014-12-08T15:18:12Z |
Approximate solutions for the Maximum Benefit Chinese Postman Problem
|
Pearn, WL; Chiu, WC |
國立交通大學 |
2014-12-08T15:18:02Z |
Testing manufacturing performance based on capability index C-pm
|
Lin, PC; Pearn, WL |
國立交通大學 |
2014-12-08T15:17:59Z |
Testing process capability based on C-pm in the presence of random measurement errors
|
Pearn, WL; Shu, MH; Hsu, BM |
國立交通大學 |
2014-12-08T15:17:40Z |
Critical acceptance values and sample sizes of a variables sampling plan for very low fraction of detectives
|
Pearn, WL; Wu, CW |
國立交通大學 |
2014-12-08T15:16:52Z |
Variables sampling plans with PPM fraction of defectives and process loss consideration
|
Pearn, WL; Wu, CW |
國立交通大學 |
2014-12-08T15:16:22Z |
Tool replacement for production with a low fraction of defectives
|
Pearn, WL; Hsu, YC; Wu, CW |
國立交通大學 |
2014-12-08T15:16:07Z |
Quality yield measure for processes with asymmetric tolerances
|
Pearn, WL; Lin, PC; Chang, YC; Wu, CW |
國立交通大學 |
2014-12-08T15:15:53Z |
Production quality and yield assurance for processes with multiple independent characteristics
|
Pearn, WL; Wu, CW |
國立交通大學 |
2014-12-08T15:04:46Z |
DISTRIBUTIONAL AND INFERENTIAL PROPERTIES OF PROCESS CAPABILITY INDEXES
|
PEARN, WL; KOTZ, S; JOHNSON, NL |
國立交通大學 |
2014-12-08T15:04:40Z |
SOME PROCESS CAPABILITY INDEXES ARE MORE RELIABLE THAN ONE MIGHT THINK
|
KOTZ, S; PEARN, WL; JOHNSON, NL |
國立交通大學 |
2014-12-08T15:03:54Z |
ALGORITHMS FOR THE WINDY POSTMAN PROBLEM
|
PEARN, WL; LI, ML |
國立交通大學 |
2014-12-08T15:03:44Z |
SOLVABLE CASES OF THE K-PERSON CHINESE POSTMAN PROBLEM
|
PEARN, WL |
國立交通大學 |
2014-12-08T15:03:25Z |
ALGORITHMS FOR THE CHINESE POSTMAN PROBLEM ON MIXED NETWORKS
|
PEARN, WL; LIU, CM |
國立交通大學 |
2014-12-08T15:03:11Z |
ESTIMATING PROCESS CAPABILITY INDEXES FOR NONNORMAL PEARSONIAN POPULATIONS
|
PEARN, WL; CHEN, KS |
國立交通大學 |
2014-12-08T15:03:09Z |
ALGORITHMS FOR THE RURAL POSTMAN PROBLEM
|
PEARN, WL; WU, TC |
國立交通大學 |
2014-12-08T15:02:59Z |
A Bayesian-like estimator of C-pk
|
Pearn, WL; Chen, KS |
國立交通大學 |
2014-12-08T15:02:09Z |
The performance of process capability index C-s on skewed distributions
|
Pearn, WL; Chang, CS |
國立交通大學 |
2014-12-08T15:02:06Z |
The asymptotic distribution of the estimated process capability index (C)over-tilde(pk)
|
Chen, SM; Pearn, WL |
國立交通大學 |
2014-12-08T15:01:21Z |
An application of non-normal process capability indices
|
Chen, KS; Pearn, WL |
國立交通大學 |
2014-12-08T15:01:16Z |
Capability indices for non-normal distributions with an application in electrolytic capacitor manufacturing
|
Pearn, WL; Chen, KS |
顯示項目 66-90 / 91 (共4頁) << < 1 2 3 4 > >> 每頁顯示[10|25|50]項目
|