|
English
|
正體中文
|
简体中文
|
总笔数 :2853524
|
|
造访人次 :
45229681
在线人数 :
705
教育部委托研究计画 计画执行:国立台湾大学图书馆
|
|
|
"pearn wl"的相关文件
显示项目 26-35 / 91 (共10页) << < 1 2 3 4 5 6 7 8 9 10 > >> 每页显示[10|25|50]项目
| 國立交通大學 |
2014-12-08T15:41:16Z |
Capability measures for processes with multiple characteristics
|
Chen, KS; Pearn, WL; Lin, PC |
| 國立交通大學 |
2014-12-08T15:41:15Z |
Capability measures for m-dependent stationary processes
|
Chen, SM; Hsu, YS; Pearn, WL |
| 國立交通大學 |
2014-12-08T15:41:14Z |
An algorithm for calculating the lower confidence bounds of C-PU and C-PL with application to low-drop-out linear regulators
|
Pearn, WL; Shu, MH |
| 國立交通大學 |
2014-12-08T15:41:08Z |
A reliable procedure for testing linear regulators with one-sided specification limits based on multiple samples
|
Pearn, WL; Lin, GH |
| 國立交通大學 |
2014-12-08T15:40:48Z |
Manufacturing capability control for multiple power-distribution switch processes based on modified C-pk MPPAC
|
Pearn, WL; Shu, MH |
| 國立交通大學 |
2014-12-08T15:40:33Z |
An algorithm for calculating the lower confidence bounds of C-PU and C-PL with application to low-drop-out linear regulators (vol 43, pg 495, 2003)
|
Pearn, WL; Shu, MH |
| 國立交通大學 |
2014-12-08T15:40:32Z |
On the Maximum Benefit Chinese Postman Problem
|
Pearn, WL; Wang, KH |
| 國立交通大學 |
2014-12-08T15:40:12Z |
Lower confidence bounds with sample size information for C-pm applied to production yield assurance
|
Pearn, WL; Shu, MH |
| 國立交通大學 |
2014-12-08T15:40:08Z |
Distributional and inferential properties of the estimated precision C-p based on multiple samples
|
Pearn, WL; Yang, YS |
| 國立交通大學 |
2014-12-08T15:40:07Z |
Cost benefit analysis of series systems with warm standby components
|
Wang, KH; Pearn, WL |
显示项目 26-35 / 91 (共10页) << < 1 2 3 4 5 6 7 8 9 10 > >> 每页显示[10|25|50]项目
|