English  |  正體中文  |  简体中文  |  2818750  
???header.visitor??? :  28400879    ???header.onlineuser??? :  1006
???header.sponsordeclaration???
 
臺灣學術機構典藏系統 (Taiwan Academic Institutional Repository, TAIR)
???ui.leftmenu.abouttair???

???ui.leftmenu.bartitle???

???index.news???

???ui.leftmenu.copyrighttitle???

???ui.leftmenu.link???

"pearn wl"???jsp.browse.items-by-author.description???

???jsp.browse.items-by-author.back???
???jsp.browse.items-by-author.order1??? ???jsp.browse.items-by-author.order2???

Showing items 41-65 of 91  (4 Page(s) Totally)
<< < 1 2 3 4 > >>
View [10|25|50] records per page

Institution Date Title Author
國立交通大學 2014-12-08T15:39:20Z A case study on the multistage IC final testing scheduling problem with reentry Pearn, WL; Chung, SH; Chen, AY; Yang, MH
國立交通大學 2014-12-08T15:39:16Z C-pm MPPAC for manufacturing quality control applied to precision voltage reference process Pearn, WL; Shu, MH; Hsu, BM
國立交通大學 2014-12-08T15:39:09Z On the distributional properties of the estimated process accuracy index C-a Lin, GH; Pearn, WL
國立交通大學 2014-12-08T15:39:06Z Accuracy analysis of the estimated process treld based onS(pk) Pearn, WL; Chuang, CC
國立交通大學 2014-12-08T15:39:04Z Optimal management of the N-policy M/E-k/1 queuing system with a removable service station: a sensitivity investigation Pearn, WL; Chang, YC
國立交通大學 2014-12-08T15:38:57Z Lower confidence bounds for C-PU and C-PL based on multiple samples with application to production yield assurance Pearn, WL; Shu, MH; Hsu, BM
國立交通大學 2014-12-08T15:38:52Z C-pm MPPAC for manufacturing quality control applied to the precision voltage reference process Pearn, WL; Shu, MH; Hsu, BM
國立交通大學 2014-12-08T15:38:50Z Procedure for supplier selection based on C-pm applied to super twisted nematic liquid crystal display processes Pearn, WL; Wu, CW; Lin, HC
國立交通大學 2014-12-08T15:37:25Z Distributional and inferential properties of the process loss indices Pearn, WL; Chang, YC; Wu, CW
國立交通大學 2014-12-08T15:37:20Z Algorithms for the wafer probing scheduling problem with sequence-dependent set-up time and due date restrictions Pearn, WL; Chung, SH; Yang, MH; Chen, YH
國立交通大學 2014-12-08T15:37:14Z Quality-yield measure for production processes with very low fraction defective Pearn, WL; Chang, YC; Wu, CW
國立交通大學 2014-12-08T15:37:13Z Testing process performance based on capability index C-pk with critical values Pearn, WL; Lin, PC
國立交通大學 2014-12-08T15:36:51Z Bootstrap approach for estimating process quality yield with application to light emitting diodes Pearn, WL; Chang, YC; Wu, CW
國立交通大學 2014-12-08T15:36:51Z Procedures for testing manufacturing precision C(p)based on ((X)over-bar, R) or ((X)over-bar, S) control chart samples Pearn, WL; Wu, CW; Chuang, HC
國立交通大學 2014-12-08T15:36:50Z Capability measure for asymmetric tolerance non-normal processes applied to speaker driver manufacturing Pearn, WL; Wu, CW; Wang, KH
國立交通大學 2014-12-08T15:36:50Z Measuring manufacturing capability for couplers and wavelength division multiplexers Wu, CW; Pearn, WL
國立交通大學 2014-12-08T15:36:10Z Process capabitity assessment for index C-pk based on bayesian approach Pearn, WL; Wu, CW
國立交通大學 2014-12-08T15:34:57Z Capability testing based on CPM with multiple samples Wu, CW; Pearn, WL
國立交通大學 2014-12-08T15:34:50Z A linear programming model for the control wafers downgrading problem Chung, SH; Pearn, WL; Kang, HY
國立交通大學 2014-12-08T15:19:28Z Control wafers inventory management in the wafer fabrication photolithography area Chung, SH; Pearn, WL; Kang, HY
國立交通大學 2014-12-08T15:19:20Z Analytic network process (ANP) approach for product mix planning in semiconductor fabricator Chung, SH; Lee, AHI; Pearn, WL
國立交通大學 2014-12-08T15:19:05Z Assessing process performance based on the incapability index C-pp Lin, PC; Pearn, WL
國立交通大學 2014-12-08T15:19:00Z Product mix optimization for semiconductor manufacturing based on AHP and ANP analysis Chung, SH; Lee, AHI; Pearn, WL
國立交通大學 2014-12-08T15:18:54Z Cost benefit analysis of series systems with warm standby components and general repair time Wang, KH; Liu, YC; Pearn, WL
國立交通大學 2014-12-08T15:18:52Z Monitoring manufacturing quality for multiple Li-BPIC processes based on capability index C-pmk Pearn, WL; Shu, MH; Hsu, BM

Showing items 41-65 of 91  (4 Page(s) Totally)
<< < 1 2 3 4 > >>
View [10|25|50] records per page