臺大學術典藏 |
2018-09-10T06:04:17Z |
Evolutionary Engineering Collaboration for DFM/DFY Solutions between Foundry and EDA Tools Vendors: A Preliminary Exploration
|
RUEY-SHAN GUO;H. Chang;Y. Su; RUEY-SHAN GUO; H. Chang; Y. Su; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T06:04:17Z |
Evolutionary Engineering Collaboration for DFM/DFY Solutions between Foundry and EDA Tools Vendors: A Preliminary Exploration
|
RUEY-SHAN GUO;H. Chang;Y. Su; RUEY-SHAN GUO; H. Chang; Y. Su; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T06:04:17Z |
The Design of Supply Chain Contract in Consideration of Risk Pooling and Risk Sharing
|
RUEY-SHAN GUO;F. Pai;H. Lo,;D. Chiang;R. Guo; RUEY-SHAN GUO; F. Pai; H. Lo,; D. Chiang; R. Guo; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T06:04:17Z |
The Design of Supply Chain Contract in Consideration of Risk Pooling and Risk Sharing
|
RUEY-SHAN GUO;F. Pai;H. Lo,;D. Chiang;R. Guo; RUEY-SHAN GUO; F. Pai; H. Lo,; D. Chiang; R. Guo; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T06:04:17Z |
The Design of Supply Chain Contract in Consideration of Risk Pooling and Risk Sharing
|
RUEY-SHAN GUO;F. Pai;H. Lo,;D. Chiang;R. Guo; RUEY-SHAN GUO; F. Pai; H. Lo,; D. Chiang; R. Guo; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T06:04:17Z |
Abnormal Trend Detection of Sequence-disordered Data Using EWMA Method
|
RUEY-SHAN GUO; RUEY-SHAN GUO; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T06:04:17Z |
Abnormal Trend Detection of Sequence-disordered Data Using EWMA Method
|
RUEY-SHAN GUO; RUEY-SHAN GUO; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T06:04:17Z |
Abnormal Trend Detection of Sequence-disordered Data Using EWMA Method
|
RUEY-SHAN GUO; RUEY-SHAN GUO; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T06:04:16Z |
供應鏈雙佔結構下的品質與價格競爭
|
RUEY-SHAN GUO; RUEY-SHAN GUO; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T06:04:16Z |
供應鏈雙佔結構下的品質與價格競爭
|
RUEY-SHAN GUO; RUEY-SHAN GUO; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T06:04:16Z |
供應鏈雙佔結構下的品質與價格競爭
|
RUEY-SHAN GUO; RUEY-SHAN GUO; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T06:04:16Z |
Take-or-Pay Supply Chain Contract under Market Price Volatility
|
RUEY-SHAN GUO;F. Pai;Chen;R. Guo, M;D. Chiang; RUEY-SHAN GUO; F. Pai; Chen; R. Guo, M; D. Chiang; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T06:04:16Z |
Take-or-Pay Supply Chain Contract under Market Price Volatility
|
RUEY-SHAN GUO;F. Pai;Chen;R. Guo, M;D. Chiang; RUEY-SHAN GUO; F. Pai; Chen; R. Guo, M; D. Chiang; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T06:04:16Z |
Take-or-Pay Supply Chain Contract under Market Price Volatility
|
RUEY-SHAN GUO;F. Pai;Chen;R. Guo, M;D. Chiang; RUEY-SHAN GUO; F. Pai; Chen; R. Guo, M; D. Chiang; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T06:04:16Z |
Semiconductor Supply Chain Monitoring Schemes for Echelon WIP Inventory Using CONWIP Concept
|
RUEY-SHAN GUO;L. Yang;D. Chiang; RUEY-SHAN GUO; L. Yang; D. Chiang; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T06:04:16Z |
Semiconductor Supply Chain Monitoring Schemes for Echelon WIP Inventory Using CONWIP Concept
|
RUEY-SHAN GUO;L. Yang;D. Chiang; RUEY-SHAN GUO; L. Yang; D. Chiang; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T06:04:16Z |
Semiconductor Supply Chain Monitoring Schemes for Echelon WIP Inventory Using CONWIP Concept
|
RUEY-SHAN GUO;L. Yang;D. Chiang; RUEY-SHAN GUO; L. Yang; D. Chiang; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T06:04:16Z |
Sensitivity Analysis of a Quadratic Goal Programming Model for Semiconductor Supply Chain
|
RUEY-SHAN GUO;C. Chen;A. Chen;D. Chiang; RUEY-SHAN GUO; C. Chen; A. Chen; D. Chiang; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T06:04:16Z |
Sensitivity Analysis of a Quadratic Goal Programming Model for Semiconductor Supply Chain
|
RUEY-SHAN GUO;C. Chen;A. Chen;D. Chiang; RUEY-SHAN GUO; C. Chen; A. Chen; D. Chiang; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T06:04:16Z |
Sensitivity Analysis of a Quadratic Goal Programming Model for Semiconductor Supply Chain
|
RUEY-SHAN GUO;C. Chen;A. Chen;D. Chiang; RUEY-SHAN GUO; C. Chen; A. Chen; D. Chiang; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T05:30:39Z |
Coordinated Multi-plant Production Planning in a Multi-Echelon Production Environment Considering Alternative Routes
|
David M. Chiang;Ruey-Shan Guo;Ho-Pu Lee;River Ji-Chyuan Liu; David M. Chiang; Ruey-Shan Guo; Ho-Pu Lee; River Ji-Chyuan Liu; MING-HUANG CHIANG |
臺大學術典藏 |
2018-09-10T05:30:39Z |
Coordinated Multi-plant Production Planning in a Multi-Echelon Production Environment Considering Alternative Routes
|
David M. Chiang;Ruey-Shan Guo;Ho-Pu Lee;River Ji-Chyuan Liu; David M. Chiang; Ruey-Shan Guo; Ho-Pu Lee; River Ji-Chyuan Liu; MING-HUANG CHIANG |
臺大學術典藏 |
2018-09-10T05:30:38Z |
Optimal Supply Chain Configurations in Semiconductor Manufacturing
|
David M. Chiang;Ruey-Shan Guo;Argon Chen et al.; David M. Chiang; Ruey-Shan Guo; Argon Chen et al.; MING-HUANG CHIANG |
臺大學術典藏 |
2018-09-10T05:30:38Z |
Optimal Supply Chain Configurations in Semiconductor Manufacturing
|
David M. Chiang;Ruey-Shan Guo;Argon Chen et al.; David M. Chiang; Ruey-Shan Guo; Argon Chen et al.; MING-HUANG CHIANG |
臺大學術典藏 |
2018-09-10T05:30:38Z |
Retailer’s Ordering Policy: The Trade-off between Emergent Replenishment and Backup Agreement
|
Ruey-Shan Guo;David M. Chiang;Fan-Yun Pai;Chang-Kung Tsao; Ruey-Shan Guo; David M. Chiang; Fan-Yun Pai; Chang-Kung Tsao; MING-HUANG CHIANG |
臺大學術典藏 |
2018-09-10T05:30:38Z |
Retailer’s Ordering Policy: The Trade-off between Emergent Replenishment and Backup Agreement
|
Ruey-Shan Guo;David M. Chiang;Fan-Yun Pai;Chang-Kung Tsao; Ruey-Shan Guo; David M. Chiang; Fan-Yun Pai; Chang-Kung Tsao; MING-HUANG CHIANG |
臺大學術典藏 |
2018-09-10T05:30:38Z |
Optimal Ordering Policy by Considering the Trade-off between Discount Vendor and Emergency Vendor
|
David M. Chiang;Ruey-Shan Guo;Fan-Yun Pai;Kuang-Chi, Chen; David M. Chiang; Ruey-Shan Guo; Fan-Yun Pai; Kuang-Chi, Chen; MING-HUANG CHIANG |
臺大學術典藏 |
2018-09-10T05:30:38Z |
Optimal Ordering Policy by Considering the Trade-off between Discount Vendor and Emergency Vendor
|
David M. Chiang;Ruey-Shan Guo;Fan-Yun Pai;Kuang-Chi, Chen; David M. Chiang; Ruey-Shan Guo; Fan-Yun Pai; Kuang-Chi, Chen; MING-HUANG CHIANG |
臺大學術典藏 |
2018-09-10T05:30:22Z |
Robust Supply Chain Configurations in Semiconductor Manufacturing
|
RUEY-SHAN GUO;A. Chen;D. Chiang; RUEY-SHAN GUO; A. Chen; D. Chiang; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T05:30:22Z |
Robust Supply Chain Configurations in Semiconductor Manufacturing
|
RUEY-SHAN GUO;A. Chen;D. Chiang; RUEY-SHAN GUO; A. Chen; D. Chiang; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T05:30:22Z |
Robust Supply Chain Configurations in Semiconductor Manufacturing
|
RUEY-SHAN GUO;A. Chen;D. Chiang; RUEY-SHAN GUO; A. Chen; D. Chiang; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T05:30:22Z |
Patterns of Vertical Engineering Collaboration between Foundry and Design Service Provider
|
RUEY-SHAN GUO; RUEY-SHAN GUO; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T05:30:22Z |
Patterns of Vertical Engineering Collaboration between Foundry and Design Service Provider
|
RUEY-SHAN GUO; RUEY-SHAN GUO; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T05:30:22Z |
Patterns of Vertical Engineering Collaboration between Foundry and Design Service Provider
|
RUEY-SHAN GUO; RUEY-SHAN GUO; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T05:30:22Z |
Inter-firm Collaboration Mechanism for Process-Product Innovation between Foundry and Fabless Design House
|
RUEY-SHAN GUO; RUEY-SHAN GUO; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T05:30:22Z |
Inter-firm Collaboration Mechanism for Process-Product Innovation between Foundry and Fabless Design House
|
RUEY-SHAN GUO; RUEY-SHAN GUO; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T05:30:22Z |
Inter-firm Collaboration Mechanism for Process-Product Innovation between Foundry and Fabless Design House
|
RUEY-SHAN GUO; RUEY-SHAN GUO; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T05:30:22Z |
Historically Explore on the Patterns of Business Model for Silicon Intellectual Property Providers in the Semiconductor Industry
|
RUEY-SHAN GUO; RUEY-SHAN GUO; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T05:30:22Z |
Historically Explore on the Patterns of Business Model for Silicon Intellectual Property Providers in the Semiconductor Industry
|
RUEY-SHAN GUO; RUEY-SHAN GUO; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T05:30:22Z |
Historically Explore on the Patterns of Business Model for Silicon Intellectual Property Providers in the Semiconductor Industry
|
RUEY-SHAN GUO; RUEY-SHAN GUO; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T05:30:22Z |
Patterns of Horizontal Collaboration for Total Solution Service Provision in the IC Design Industry
|
RUEY-SHAN GUO;Y. Chang;Y. Su; RUEY-SHAN GUO; Y. Chang; Y. Su; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T05:30:22Z |
Patterns of Horizontal Collaboration for Total Solution Service Provision in the IC Design Industry
|
RUEY-SHAN GUO;Y. Chang;Y. Su; RUEY-SHAN GUO; Y. Chang; Y. Su; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T05:30:22Z |
Patterns of Horizontal Collaboration for Total Solution Service Provision in the IC Design Industry
|
RUEY-SHAN GUO;Y. Chang;Y. Su; RUEY-SHAN GUO; Y. Chang; Y. Su; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T05:30:22Z |
Integrated QFD and Taguchi Robust Quality Engineering
|
RUEY-SHAN GUO;Y. Chu; RUEY-SHAN GUO; Y. Chu; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T05:30:22Z |
Integrated QFD and Taguchi Robust Quality Engineering
|
RUEY-SHAN GUO;Y. Chu; RUEY-SHAN GUO; Y. Chu; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T05:30:22Z |
Integrated QFD and Taguchi Robust Quality Engineering
|
RUEY-SHAN GUO;Y. Chu; RUEY-SHAN GUO; Y. Chu; RUEY-SHAN GUO |
臺大學術典藏 |
2018-09-10T05:30:21Z |
納入資源回收機制之製造商最佳新製與再製決策模式
|
MING-HUANG CHIANG;RUEY-SHAN GUO; MING-HUANG CHIANG; RUEY-SHAN GUO; RUEY-SHAN GUO; MING-HUANG CHIANG |
臺大學術典藏 |
2018-09-10T05:30:21Z |
納入資源回收機制之製造商最佳新製與再製決策模式
|
MING-HUANG CHIANG;RUEY-SHAN GUO; MING-HUANG CHIANG; RUEY-SHAN GUO; RUEY-SHAN GUO; MING-HUANG CHIANG |
臺大學術典藏 |
2018-09-10T05:30:21Z |
納入資源回收機制之製造商最佳新製與再製決策模式
|
MING-HUANG CHIANG;RUEY-SHAN GUO; MING-HUANG CHIANG; RUEY-SHAN GUO; RUEY-SHAN GUO; MING-HUANG CHIANG |
臺大學術典藏 |
2018-09-10T05:30:21Z |
Retailer’s Ordering Policy: The Tradeoff between Emergent Replenishment and Backup Agreement
|
RUEY-SHAN GUO;C. Tsao;F. Pai,;D. Chiang; RUEY-SHAN GUO; C. Tsao; F. Pai,; D. Chiang; RUEY-SHAN GUO |