| 國立政治大學 |
2008-06 |
Organizational Learning with Continuous Depreciation of Knowledge
|
唐揆; Kim, I.;Moskowitz, H.;Plante, R.;Seo, H.L.;Tang, Kwei |
| 國立政治大學 |
2006.08 |
Incentive maintenance outsourcing contracts for channel coordination and improvement
|
唐揆; Tang, Kwei |
| 國立政治大學 |
2006.01 |
Maintenance Outsourcing of a Multi-process Manufacturing System with Multiple Contractors
|
唐揆; Tang, Kwei |
| 國立政治大學 |
2006 |
Optimal process control policies under a time-varying cost structure
|
Tang, Kwei;Gong, Linguo;Chang, Dong-Shang; 唐揆 |
| 國立政治大學 |
2005-08 |
Market basket analysis in a multiple store environment
|
Chen, Yen-Liang ; Tang, Kwei ; Shen, Ren-Jie ; Hua, Ya-Han; 唐揆; 企管系 |
| 國立政治大學 |
2005 |
Finding theKth shortest path in a time-schedule network
|
Tang, Kwei;Chen, Yen-Liang; 唐揆 |
| 國立政治大學 |
2003-08 |
Time Analysis for Planning a Path in a Time-Window Network
|
唐揆; Chen, Y.L.;Shaio, L.J.;Tang, Kwei |
| 國立政治大學 |
2002-11 |
TIME-BASED PRICING AND LEADTIME POLICIES FOR A BUILD-TO-ORDER MANUFACTURER
|
唐揆; Tang, , Kwei;Tang, J. |
| 國立政治大學 |
2002-06 |
EFFECTS OF RANDOM SHIFTS OF TESTING EQUIPMENT ON PROCESS CONTROL SYSTEM DESIGN AND SELECTION OF PROCESS CONTROL POLICIES
|
唐揆; Ding, J.;Gong, L.;Tang, Kwei |
| 國立政治大學 |
2001-01 |
The First K Minimum Cost Paths in a Time-Schedule Network
|
唐揆; Chen, Y. L.;Rinks, D.;Tang, Kwei |
| 國立政治大學 |
2000 |
Joint determination of process mean, production run size and material order quantity for a container-filling process
|
Tang, Kwei;Gong, Linguo;Roan, Jinshyang; 唐揆 |
| 國立政治大學 |
2000 |
Process improvement for a container-filling process with random shifts
|
Tang, Kwei;Gong, Linguo;Williams, William W.; 唐揆 |
| 國立政治大學 |
2000 |
Sensor-Based On-line Screening Procedure and Tool Replacement Policy
|
唐揆; Chang, D. S.;Tang, Kwei;Lai, C .W. |
| 國立政治大學 |
1999-05 |
Cost analysis of two-attribute warranty policies based on the product usage rate
|
Tang, Kwei;Chun, Young H.; 唐揆 |
| 國立政治大學 |
1999 |
Performance comparison between on-line sensors and control charts in manufacturing process monitoring
|
Tang, Kwei;Gong, Linguo;Williams, William W.;Jwo, Wushong; 唐揆 |
| 國立政治大學 |
1998-10 |
Minimum time paths in a network with mixed time constraints
|
Tang, Kwei;Chen, Yen-Liang; 唐揆 |
| 國立政治大學 |
1998-01 |
Process Mean Determination with Quantity Discounts in Raw Material Cost
|
唐揆; Gong, L.;Roan, J.;Tang, Kwei |
| 國立政治大學 |
1997-07 |
Using On-line Sensors in Statistical Process Control
|
唐揆; Gong, L.;Jwo, W.;Tang, Kwei |
| 國立政治大學 |
1997-02 |
Exact bayesian estimation of system reliability from component test data
|
唐揆; Tang, J.;Tang, Kwei;Moskowitz, H. |
| 國立政治大學 |
1997 |
Critical path in an activity network with time constraints
|
Tang, Kwei;Chen, Yen-Liang;Rinks, Dan; 唐揆 |
| 國立政治大學 |
1997 |
Monitoring machine operations using on-line sensors
|
Tang, Kwei;Gong, Linguo; 唐揆 |
| 國立政治大學 |
1997 |
Process mean determination under constant raw material supply
|
Tang, Kwei;Gong, Linguo;Roan, Jinshyang; 唐揆 |
| 國立政治大學 |
1997 |
A Markovian model for process setup and improvement
|
Tang, Kwei;Gong, Linguo;Pruett, James; 唐揆 |
| 國立政治大學 |
1997 |
A Review of: “Statistics - Principles and Methods, third edition” Richard A. Johnson and Gouri K. Bhattacharyya John Wiley and Sons, 1996, 720 pp., ISBN 0471041947
|
Tang, Kwei; 唐揆 |
| 國立政治大學 |
1997 |
Statistics – Principles and Methods, third edition
|
Tang, Kwei; 唐揆 |
| 國立政治大學 |
1997 |
Automated Extraction of Welds from Digitized Radiographic Images Based on MLP Neural Networks
|
唐揆; Liao, T. W.;Tang, Kwei |
| 國立政治大學 |
1995 |
Determining the optimal warranty price based on the producer's and customers' risk preferences
|
Tang, Kwei;Chun, Young Hak; 唐揆 |
| 國立政治大學 |
1994-12 |
Design of a two-stage procedure for three-class screening
|
唐揆; Kim, C.T.;Tang, Kwei;Peters, M. |
| 國立政治大學 |
1994-07 |
Design of Screening Procedures: A Review
|
唐揆; Tang, Kwei;Tang, J. |
| 國立政治大學 |
1994-03 |
Bayes credibility intervals for reliability of series systems with very reliable components
|
唐揆; Tang, J.;Tang, Kwei;Moskowitz, H. |
| 國立政治大學 |
1993-06 |
A Note on Parallel Equipment Replacement
|
唐揆; Tang, J.;Tang, Kwei |
| 國立政治大學 |
1993 |
Determination of the Optimal Process Mean When Inspection is Based on a Correlated Variable
|
唐揆; Tang, Kwei;Lo, J. |
| 國立政治大學 |
1992-07 |
Burn-in Time and Estimation of Change-Point with Weibull-Exponential Mixture Distribution
|
唐揆; Chou, Kwei;Tang, Kwei |
| 國立政治大學 |
1992-05 |
A Pictorial Approach to Poor Quality Cost Management
|
唐揆; Chen, Y.S.;Tang, Kwei |
| 國立政治大學 |
1992 |
Bayesian Variables Acceptance Sampling Plans: Quadratic Loss Function and Step Loss Function
|
唐揆; Moskowitz, H.;Tang, Kwei |
| 國立政治大學 |
1992 |
Comparison of renewal function estimators for censored data
|
唐揆; Schneider, H.;Lin, B.S.;Tang, Kwei |
| 國立政治大學 |
1991-08 |
Optimal Inspection Policy in Sequential Screening
|
唐揆; Park, J.S.;Peters, M.H.;Tang, Kwei |
| 國立政治大學 |
1991-06 |
Design of Multi Stage Screening Procedures for a Serial Production System
|
唐揆; Tang, Kwei |
| 國立政治大學 |
1990-12 |
Cost Effectiveness of Using a Correlated Variable in a Complete Inspection Plan When Inspection Error is Present
|
唐揆; Tang, Kwei;Schneider, H. |
| 國立政治大學 |
1990-12 |
Economic design of multi-characteristic models for a three-class screening procedure
|
唐揆; Lo, Yumei;Tang, Kwei |
| 國立政治大學 |
1990-11 |
Optimal Control of a Production Process Subject to Random Deterioration
|
唐揆; Schneider, H.;Tang, Kwei;O&apos, C.;Cinneide |
| 國立政治大學 |
1990-06 |
Design of Product Grading Procedures
|
唐揆; Tang, Kwei |
| 國立政治大學 |
1990 |
Adaptive Procedures for the Two-Stage Group-Testing Problem Based on Prior Distributions and Costs
|
唐揆; Schneider, H.;Tang, Kwei |
| 國立政治大學 |
1990 |
Establishing Investigation Thresholds for Preliminary Analytical Procedures
|
唐揆; Harper, R.M.;Strawser, J.R.;Tang, Kwei |
| 國立政治大學 |
1989-06 |
Design Of Product Specifications For Multi-Characteristic I
|
唐揆; Tang, Kwei;Tang, J. |
| 國立政治大學 |
1989 |
Empirical Comparisons of Five Procedures for Combining or Selecting Forecasts
|
唐揆; Ringuest, J.;Tang, Kwei |
| 國立政治大學 |
1989 |
A Two-sided Screening Procedure Using Several Correlated Variables
|
唐揆; Tang, J.;Tang, Kwei |
| 國立政治大學 |
1988-10 |
Design of a Two Stage Screening Procedure Using a Correlated Variable
|
唐揆; Tang, Kwei |
| 國立政治大學 |
1988-08 |
Joint Determination of Optimal Inventory and Quality Control Policy
|
唐揆; Peters, M.;Schneider, H.;Tang, Kwei |
| 國立政治大學 |
1988-07 |
Selection of the Optimal Inspection Precision Level for a Complete Inspection Plan
|
唐揆; Tang, Kwei;Schneider, H. |