English  |  正體中文  |  简体中文  |  0  
???header.visitor??? :  51207858    ???header.onlineuser??? :  724
???header.sponsordeclaration???
 
臺灣學術機構典藏系統 (Taiwan Academic Institutional Repository, TAIR)
???ui.leftmenu.abouttair???

???ui.leftmenu.bartitle???

???index.news???

???ui.leftmenu.copyrighttitle???

???ui.leftmenu.link???

"ting p s"???jsp.browse.items-by-author.description???

???jsp.browse.items-by-author.back???
???jsp.browse.items-by-author.order1??? ???jsp.browse.items-by-author.order2???

Showing items 11-23 of 23  (1 Page(s) Totally)
1 
View [10|25|50] records per page

Institution Date Title Author
國立臺灣科技大學 2015 The algorithm for the optimal cycle time and pricing decisions for an integrated inventory system with order-size dependent trade credit in supply chain management Chung, K.-J.;Liao, J.-J.;Ting, P.-S.;Lin, S.-D.;Srivastava, H.M.
國立臺灣科技大學 2015 The inventory model under supplier's partial trade credit policy in a supply chain system Chung, K.-J.;Ting, P.-S.
國立臺灣科技大學 2015 When crowdsourcing meets mobile sensing: A social network perspective Chen, P.-Y.;Cheng, S.-M.;Ting, P.-S.;Lien, C.-W.;Chu, F.-J.
國立臺灣科技大學 2015 Supervised collective classification for crowdsourcing Chen, P.-Y;Lien, C.-W;Chu, F.-J;Ting, P.-S;Cheng, S.-M.
國立臺灣科技大學 2014 Some formulations for optimal solutions with delays in payment and price-discount offers in the supply chain system Ting, P.-S.;Chung, K.-J.
國立臺灣科技大學 2014 Remarks on the optimization method of a manufacturing system with stochastic breakdown and rework process in supply chain management Ting, P.-S.;Chung, K.-J.
國立臺灣科技大學 2014 On the convexity for the expected total cost per unit time of the EPQ model with scrap, rework and stochastic machine breakdown Ting, P.-S.;Chung, K.-J.
國立臺灣科技大學 2014 An inventory model with non-instantaneous receipt and exponentially deteriorating items for an integrated three layer supply chain system under two levels of trade credit Chung, K.-J.;Eduardo Cardenas-Barron, L.;Ting, P.-S.
實踐大學 2013 Remarks on the optimization method of a manufacturing system with stochastic breakdown and rework process in supply chain management Ting, P.S.;Chung, K.J.
實踐大學 2013 On the convexity for the expected total cost per unit time of the EPQ model with scrap, rework and stochastic machine breakdown Ting, P.S.;Chung, K.J.
實踐大學 2009 A simple cost minimization procedure for the (Q, r) inventory system with a specified fixed cost per stockout occasion Chung, K.J.;Ting, P.S.;Hou, K.L.
實踐大學 2009 An accurate and reliable solution algorithm for the (Q, r) inventory system with a fixed shortage cost Ting, P.S.;Hou, K.L.;Chung, K.J.
實踐大學 1998 Economic ordering policy for deteriorating items with a linearly increasing demand Chung, K.J.;Ting, P.S.

Showing items 11-23 of 23  (1 Page(s) Totally)
1 
View [10|25|50] records per page