English  |  正體中文  |  简体中文  |  总笔数 :2831207  
造访人次 :  33250813    在线人数 :  584
教育部委托研究计画      计画执行:国立台湾大学图书馆
 
臺灣學術機構典藏系統 (Taiwan Academic Institutional Repository, TAIR)
关于TAIR

浏览

消息

著作权

相关连结

"tran d h"的相关文件

回到依作者浏览
依题名排序 依日期排序

显示项目 1-17 / 17 (共1页)
1 
每页显示[10|25|50]项目

机构 日期 题名 作者
國立臺灣科技大學 2020 Optimizing non-unit repetitive project resource and scheduling by evolutionary algorithms Tran, D.-H.;Chou, J.-S.;Luong, D.-L.
國立臺灣科技大學 2019 Combining machine learning models via adaptive ensemble weighting for prediction of shear capacity of reinforced-concrete deep beams Prayogo, D.;Cheng, M.-Y.;Wu, Y.-W.;Tran, D.-H.
國立臺灣科技大學 2019 Multi-objective symbiotic organisms optimization for making time-cost tradeoffs in repetitive project scheduling problem Tran, D.-H.;Chou, J.-S.;Luong, D.-L.
國立臺灣科技大學 2019 Nature-inspired metaheuristic ensemble model for forecasting energy consumption in residential buildings Tran, D.-H.;Luong, D.-L.;Chou, J.-S.
國立臺灣科技大學 2018 Optimization model for construction project resource leveling using a novel modified symbiotic organisms search Prayogo D.; Cheng M.-Y.; Wong F.T.; Tjandra D.; Tran D.-H.
國立臺灣科技大學 2017 Fuzzy clustering chaotic-based differential evolution for resource leveling in construction projects Cheng, M.-Y;Tran, D.-H;Hoang, N.-D.
國立臺灣科技大學 2016 A novel Multiple Objective Symbiotic Organisms Search (MOSOS) for time-cost-labor utilization tradeoff problem Tran, D.-H;Cheng, M.-Y;Prayogo, D.
國立臺灣科技大學 2016 Chaotic initialized multiple objective differential evolution with adaptive mutation strategy (CA-MODE) for construction project time-cost-quality trade-off Cheng, M.-Y;Tran, D.-H;Cao, M.-T.
國立臺灣科技大學 2016 Integrating Chaotic Initialized Opposition Multiple-Objective Differential Evolution and Stochastic Simulation to Optimize Ready-Mixed Concrete Truck Dispatch Schedule Cheng, M.-Y;Tran, D.-H.
國立臺灣科技大學 2016 Optimizing Multiple-Resources Leveling in Multiple Projects Using Discrete Symbiotic Organisms Search Cheng, M.-Y;Prayogo, D;Tran, D.-H.
國立臺灣科技大學 2016 Solving resource-constrained project scheduling problems using hybrid artificial bee colony with differential evolution Tran, D.-H;Cheng, M.-Y;Cao, M.-T.
國立臺灣科技大學 2016 Using Fuzzy Clustering Chaotic-based Differential Evolution to solve multiple resources leveling in the multiple projects scheduling prob lem Tran, D.-H;Cheng, M.-Y;Pham, A.-D.
國立臺灣科技大學 2015 Hybrid multiple objective artificial bee colony with differential evolution for the time-cost-quality tradeoff problem Tran, D.-H.;Cheng, M.-Y.;Cao, M.-T.
國立臺灣科技大學 2015 Opposition-Based Multiple-Objective Differential Evolution to Solve the Time-Cost-Environment Impact Trade-Off Problem in Construction Projects Cheng, M.-Y.;Tran, D.-H.
國立臺灣科技大學 2014 Two-phase differential evolution for the multiobjective optimization of time-cost tradeoffs in resource-constrained construction projects Cheng, M.-Y.;Tran, D.-H.
國立臺灣科技大學 2014 A hybrid fuzzy inference model based on RBFNN and artificial bee colony for predicting the uplift capacity of suction caissons Cheng, M.-Y.;Cao, M.-T.;Tran, D.-H.
國立臺灣科技大學 2014 Using a fuzzy clustering chaotic-based differential evolution with serial method to solve resource-constrained project scheduling problems Cheng, M.-Y.;Tran, D.-H.;Wu, Y.-W.

显示项目 1-17 / 17 (共1页)
1 
每页显示[10|25|50]项目