臺大學術典藏 |
2022-03-22T08:27:51Z |
Developing a risk management process for infrastructure projects using idef0
|
Tserng H.-P;Cho I.-C;Chen C.-H;Liu Y.-F.; Tserng H.-P; Cho I.-C; Chen C.-H; Liu Y.-F.; HUI-PING TSERNG |
臺大學術典藏 |
2022-03-22T08:27:51Z |
Developing a risk management process for infrastructure projects using idef0
|
Tserng H.-P;Cho I.-C;Chen C.-H;Liu Y.-F.; Tserng H.-P; Cho I.-C; Chen C.-H; Liu Y.-F.; HUI-PING TSERNG |
臺大學術典藏 |
2022-03-22T08:27:51Z |
Real-time individual workload management at tunnel worksite using wearable heart rate measurement devices
|
Chen W.-C;Tserng H.P.; Chen W.-C; Tserng H.P.; HUI-PING TSERNG |
臺大學術典藏 |
2022-03-22T08:27:51Z |
Real-time individual workload management at tunnel worksite using wearable heart rate measurement devices
|
Chen W.-C;Tserng H.P.; Chen W.-C; Tserng H.P.; HUI-PING TSERNG |
臺大學術典藏 |
2022-03-22T08:25:08Z |
Developing a risk management process for infrastructure projects using idef0
|
Tserng H.-P;Cho I.-C;Chen C.-H;Liu Y.-F.; Tserng H.-P; Cho I.-C; Chen C.-H; Liu Y.-F.; HUI-PING TSERNG |
臺大學術典藏 |
2022-03-22T08:25:08Z |
Real-time individual workload management at tunnel worksite using wearable heart rate measurement devices
|
Chen W.-C;Tserng H.P.; Chen W.-C; Tserng H.P.; HUI-PING TSERNG |
臺大學術典藏 |
2021-08-05T02:36:41Z |
Automating the generation of indoor space topology for 3D route planning using BIM and 3D-GIS techniques
|
Lin W.Y;Lin P.H;Tserng H.P.; Lin W.Y; Lin P.H; Tserng H.P.; HUI-PING TSERNG |
臺大學術典藏 |
2021-02-04T02:48:30Z |
Earthquake damage assessment and cost-benefit analysis of seismic retrofitting for private buildings in metropolitan area: case studies on Xingfu and Weiguanjinlong buildings in Tainan city | 都會區私有建築物震損評估與耐震補強成本效益分析-以臺南市幸福及維冠金龍大樓為例
|
Chou, J.-S.; Ou, Y.-C.; Tserng, H.-P.; Chen, J.-L.; Tsai, C.-F.; Wu, Y.-Z.; Chen, Y.-M.; Chou, J.-S.; Ou, Y.-C.; Tserng, H.-P.; Chen, J.-L.; Tsai, C.-F.; Wu, Y.-Z.; Chen, Y.-M.; Yu-Chen Ou; HUI-PING TSERNG |
臺大學術典藏 |
2020-01-06T03:11:05Z |
Mobile construction supply chain management using PDA and bar codes
|
SHIANG-TAI LIN; Lin, S. T.; Lin, Y. C.; Dzeng, R. J.; Tserng, H. P. |
臺大學術典藏 |
2019-12-20T08:42:37Z |
Developing an analytical model for the optimal capital structure of the building company
|
Tsai, L.-K.; Tserng, H.-P.; Ho, S.P.; Sung, C.-W.; Chou, Y.-S.; SHIH-PING HO |
臺大學術典藏 |
2019-12-20T08:42:36Z |
Enhancing knowledge sharing management using BIM technology in construction
|
Ho, S.-P.; Tserng, H.-P.; Jan, S.-H.; SHIH-PING HO |
臺大學術典藏 |
2019-12-20T08:42:35Z |
Proactive measures of governmental debt guarantees to facilitate Public-Private Partnerships project
|
Tserng, H.P.; Ho, S.-P.; Chou, J.-S.; Lin, C.; SHIH-PING HO |
臺大學術典藏 |
2019-12-20T08:42:35Z |
Developing BIM-assisted as-built schedule management system for general contractors
|
Tserng, H.-P.; Ho, S.-P.; Jan, S.-H.; SHIH-PING HO |
臺大學術典藏 |
2019-12-19T07:12:57Z |
An implementation of light-weight compression algorithm for wireless sensor network technology in structure health monitoring
|
Hsu, C.-H.; Lin, C.-T.; Tserng, H.-P.; Han, J.-Y.; JEN-YU HAN |
臺大學術典藏 |
2019-12-19T07:12:46Z |
Interactive path planning for multi-equipment landfill operations (vol 10, pg 155, 2000)
|
Tserng, H. P.; Ran, B.; Russell, J. S.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:46Z |
Determining minimum contract time for highway projects
|
Shr, J. F.; Thompson, B. P.; Russell, J. S.; Ran, B.; Tserng, H. P.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:45Z |
OPSALC: A computer-integrated operations planning system for autonomous landfill compaction
|
Tserng, H.-P.; Veeramani, D.; Kunigahalli, R.; Russell, J.S.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:45Z |
Motion Planning for an Autonomous Compactor in a Waste Landfill Site
|
Kunigahalli, R.; Russell, J.S.; Tserng, H.?P.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:43Z |
AutoPave: Towards an automated paving system for asphalt pavement compaction operations
|
Krishnamurthy, B.K.; Tserng, H.-P.; Schmitt, R.L.; Russell, J.S.; Bahia, H.U.; Hanna, A.S.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:42Z |
An accelerated subcontracting and procuring model for construction projects
|
Tserng, H.P.; Lin, P.H.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:42Z |
Interactive path planning for multi-equipment landfill operations
|
Tserng, H.P.; Ran, B.; Russell, J.S.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:42Z |
Determining minimum contract time for highway projects
|
Shr, J.-F.; Thompson, B.P.; Russell, J.S.; Ran, B.; Tserng, H.P.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:42Z |
Computer-integrated collaborative design and operation in the construction industry
|
Veeramani, D.; Tserng, H.P.; Russell, J.S.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:41Z |
Development of an object-oriented scheduling model for construction projects
|
Fan, S.-L.; Tserng, H.P.; Wang, M.-T.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:41Z |
Developing an electronic acquisition model for project scheduling using XML-based information standard
|
Tserng, H.P.; Lin, W.Y.; HUI-PING TSERNG |