臺大學術典藏 |
2022-03-22T08:27:51Z |
Developing a risk management process for infrastructure projects using idef0
|
Tserng H.-P;Cho I.-C;Chen C.-H;Liu Y.-F.; Tserng H.-P; Cho I.-C; Chen C.-H; Liu Y.-F.; HUI-PING TSERNG |
臺大學術典藏 |
2022-03-22T08:27:51Z |
Developing a risk management process for infrastructure projects using idef0
|
Tserng H.-P;Cho I.-C;Chen C.-H;Liu Y.-F.; Tserng H.-P; Cho I.-C; Chen C.-H; Liu Y.-F.; HUI-PING TSERNG |
臺大學術典藏 |
2022-03-22T08:27:51Z |
Real-time individual workload management at tunnel worksite using wearable heart rate measurement devices
|
Chen W.-C;Tserng H.P.; Chen W.-C; Tserng H.P.; HUI-PING TSERNG |
臺大學術典藏 |
2022-03-22T08:27:51Z |
Real-time individual workload management at tunnel worksite using wearable heart rate measurement devices
|
Chen W.-C;Tserng H.P.; Chen W.-C; Tserng H.P.; HUI-PING TSERNG |
臺大學術典藏 |
2022-03-22T08:25:08Z |
Developing a risk management process for infrastructure projects using idef0
|
Tserng H.-P;Cho I.-C;Chen C.-H;Liu Y.-F.; Tserng H.-P; Cho I.-C; Chen C.-H; Liu Y.-F.; HUI-PING TSERNG |
臺大學術典藏 |
2022-03-22T08:25:08Z |
Real-time individual workload management at tunnel worksite using wearable heart rate measurement devices
|
Chen W.-C;Tserng H.P.; Chen W.-C; Tserng H.P.; HUI-PING TSERNG |
臺大學術典藏 |
2021-08-05T02:36:41Z |
Automating the generation of indoor space topology for 3D route planning using BIM and 3D-GIS techniques
|
Lin W.Y;Lin P.H;Tserng H.P.; Lin W.Y; Lin P.H; Tserng H.P.; HUI-PING TSERNG |
臺大學術典藏 |
2021-02-04T02:48:30Z |
Earthquake damage assessment and cost-benefit analysis of seismic retrofitting for private buildings in metropolitan area: case studies on Xingfu and Weiguanjinlong buildings in Tainan city | 都會區私有建築物震損評估與耐震補強成本效益分析-以臺南市幸福及維冠金龍大樓為例
|
Chou, J.-S.; Ou, Y.-C.; Tserng, H.-P.; Chen, J.-L.; Tsai, C.-F.; Wu, Y.-Z.; Chen, Y.-M.; Chou, J.-S.; Ou, Y.-C.; Tserng, H.-P.; Chen, J.-L.; Tsai, C.-F.; Wu, Y.-Z.; Chen, Y.-M.; Yu-Chen Ou; HUI-PING TSERNG |
臺大學術典藏 |
2020-01-06T03:11:05Z |
Mobile construction supply chain management using PDA and bar codes
|
SHIANG-TAI LIN; Lin, S. T.; Lin, Y. C.; Dzeng, R. J.; Tserng, H. P. |
臺大學術典藏 |
2019-12-20T08:42:37Z |
Developing an analytical model for the optimal capital structure of the building company
|
Tsai, L.-K.; Tserng, H.-P.; Ho, S.P.; Sung, C.-W.; Chou, Y.-S.; SHIH-PING HO |
臺大學術典藏 |
2019-12-20T08:42:36Z |
Enhancing knowledge sharing management using BIM technology in construction
|
Ho, S.-P.; Tserng, H.-P.; Jan, S.-H.; SHIH-PING HO |
臺大學術典藏 |
2019-12-20T08:42:35Z |
Proactive measures of governmental debt guarantees to facilitate Public-Private Partnerships project
|
Tserng, H.P.; Ho, S.-P.; Chou, J.-S.; Lin, C.; SHIH-PING HO |
臺大學術典藏 |
2019-12-20T08:42:35Z |
Developing BIM-assisted as-built schedule management system for general contractors
|
Tserng, H.-P.; Ho, S.-P.; Jan, S.-H.; SHIH-PING HO |
臺大學術典藏 |
2019-12-19T07:12:57Z |
An implementation of light-weight compression algorithm for wireless sensor network technology in structure health monitoring
|
Hsu, C.-H.; Lin, C.-T.; Tserng, H.-P.; Han, J.-Y.; JEN-YU HAN |
臺大學術典藏 |
2019-12-19T07:12:46Z |
Interactive path planning for multi-equipment landfill operations (vol 10, pg 155, 2000)
|
Tserng, H. P.; Ran, B.; Russell, J. S.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:46Z |
Determining minimum contract time for highway projects
|
Shr, J. F.; Thompson, B. P.; Russell, J. S.; Ran, B.; Tserng, H. P.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:45Z |
OPSALC: A computer-integrated operations planning system for autonomous landfill compaction
|
Tserng, H.-P.; Veeramani, D.; Kunigahalli, R.; Russell, J.S.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:45Z |
Motion Planning for an Autonomous Compactor in a Waste Landfill Site
|
Kunigahalli, R.; Russell, J.S.; Tserng, H.?P.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:43Z |
AutoPave: Towards an automated paving system for asphalt pavement compaction operations
|
Krishnamurthy, B.K.; Tserng, H.-P.; Schmitt, R.L.; Russell, J.S.; Bahia, H.U.; Hanna, A.S.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:42Z |
An accelerated subcontracting and procuring model for construction projects
|
Tserng, H.P.; Lin, P.H.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:42Z |
Interactive path planning for multi-equipment landfill operations
|
Tserng, H.P.; Ran, B.; Russell, J.S.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:42Z |
Determining minimum contract time for highway projects
|
Shr, J.-F.; Thompson, B.P.; Russell, J.S.; Ran, B.; Tserng, H.P.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:42Z |
Computer-integrated collaborative design and operation in the construction industry
|
Veeramani, D.; Tserng, H.P.; Russell, J.S.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:41Z |
Development of an object-oriented scheduling model for construction projects
|
Fan, S.-L.; Tserng, H.P.; Wang, M.-T.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:41Z |
Developing an electronic acquisition model for project scheduling using XML-based information standard
|
Tserng, H.P.; Lin, W.Y.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:41Z |
A framework of electronic tendering for government procurement: A lesson learned in Taiwan
|
Liao, T.S.; Wang, M.T.; Tserng, H.P.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:41Z |
A 3-D graphical database system for landfill operations using GPS
|
Tserng, H.P.; Russell, J.S.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:40Z |
Module-based construction schedule administration for public infrastructure agencies
|
HUI-PING TSERNG;Tserng, H.P.;Wang, W.C.;Dzeng, R.J.; Dzeng, R.J.; Wang, W.C.; Tserng, H.P.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:39Z |
Developing a resource supply chain planning system for construction projects
|
HUI-PING TSERNG; Tserng, H.P.; Yin, S.Y.L.; Li, S. |
臺大學術典藏 |
2019-12-19T07:12:39Z |
Mobile construction supply chain management using PDA and Bar Codes
|
Tserng, H.P.; Dzeng, R.-J.; Lin, Y.-C.; Lin, S.-T.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:39Z |
Automating schedule review for expressway construction
|
Dzeng, R.J.; Tserng, H.P.; Wang, W.C.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:39Z |
Developing an activity-based knowledge management system for contractors
|
Tserng, H.P.; Lin, Y.-C.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:38Z |
Distilling and managing engineers' experience in construction projects using a pattern approach
|
Chang, C.-H.; Lin, Y.-C.; Tserng, H.P.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:38Z |
Establishing domain testing resources to support advance text-based information retrieval applications for architecture, engineering, construction and facility management (AEC/FM)
|
Lin, K.Y.; Hsieh, S.H.; Tserng, H.P.; Chou, K.W.; Lin, H.T.; Huang, C.P.; Tzeng, K.F.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:38Z |
Enhancing knowledge exchange through web map-based knowledge management system in construction: Lessons learned in Taiwan
|
Lin, Y.-C.; Wang, L.-C.; Tserng, H.P.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:38Z |
Automated construction of the Paghuashan tunnel for Taiwan High Speed Rail (THSR) project
|
Lin, P.H.; Tserng, H.P.; Lin, C.C.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:38Z |
Object-oriented scheduling for repetitive projects with soft logics
|
Fan, S.-L.; Tserng, H.P.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:37Z |
Exploring the effectiveness of chinese-to-english machine translation for clir applications in earthquake engineering
|
Lin, K.Y.; Chou, K.W.; Lin, H.T.; Hsieh, S.H.; Tserng, H.P.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:37Z |
A model of integrating the cycle of construction knowledge flows: Lessons learned in Taiwan
|
Yin, S.Y.L.; Tserng, H.P.; Tsai, M.D.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:37Z |
Enabling the creation of domain-specific reference collections to support text-based information retrieval experiments in the architecture, engineering and construction industries
|
Lin, K.Y.; Hsieh, S.H.; Tserng, H.P.; Chou, K.W.; Lin, H.T.; Huang, C.P.; Tzeng, K.F.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:37Z |
Developing a project knowledge management framework for tunnel construction: Lessons learned in Taiwan
|
Tserng, H.P.; Chang, C.-H.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:36Z |
Developing an ARIS-house-based method from existing information systems to project-based enterprise resource planning for general contractor
|
Tserng, H.P.; Yin, S.Y.L.; Skibniewski, M.J.; Lee, M.H.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:36Z |
A production modeling with genetic algorithms for a stationary pre-cast supply chain
|
Li, S.H.A.; Tserng, H.P.; Yin, S.Y.L.; Hsu, C.W.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:36Z |
Analysing dispute mediation cases of infrastructure projects through project life cycle
|
Tserng, H.P.; Teng, W.-K.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:36Z |
A study of ontology-based risk management framework of construction projects through project life cycle
|
Tserng, H.P.; Yin, S.Y.L.; Dzeng, R.J.; Wou, B.; Tsai, M.D.; Chen, W.Y.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:36Z |
Developing a precast production management system using RFID technology
|
Yin, S.Y.L.; Tserng, H.P.; Wang, J.C.; Tsai, S.C.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:36Z |
Maintenance strategy for bridge components on the basis of performance
|
Tserng, H.P.; Yin, S.Y.-L.; Chung, C.-L.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:34Z |
Analyzing the role of national PPP units in promoting PPPs: Using new institutional economics and a case study
|
Tserng, H.P.; Russell, J.S.; Hsu, C.-W.; Lin, C.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:34Z |
An enforced support vector machine model for construction contractor default prediction
|
Tserng, H.P.; Lin, G.-F.; Tsai, L.K.; Chen, P.-C.; HUI-PING TSERNG |
臺大學術典藏 |
2019-12-19T07:12:34Z |
Modularization and assembly algorithm for efficient MEP construction
|
Tserng, H.P.; Yin, Y.L.; Jaselskis, E.J.; Hung, W.-C.; Lin, Y.-C.; HUI-PING TSERNG |