|
English
|
正體中文
|
简体中文
|
总笔数 :2854037
|
|
造访人次 :
45293585
在线人数 :
1256
教育部委托研究计画 计画执行:国立台湾大学图书馆
|
|
|
显示项目 731831-731840 / 2346288 (共234629页) << < 73179 73180 73181 73182 73183 73184 73185 73186 73187 73188 > >> 每页显示[10|25|50]项目
| 國立交通大學 |
2014-12-08T15:30:50Z |
Risk analysis for flood-control structure under consideration of uncertainties in design flood
|
Wu, Shiang-Jen; Yang, Jinn-Chuang; Tung, Yeou-Koung |
| 國立交通大學 |
2014-12-08T15:02:36Z |
Risk analysis for flow duration curve based seasonal discharge management programs
|
Kao, JJ; Bau, SF |
| 實踐大學 |
2013 |
Risk analysis for utilizing cloud computing- in perspectives of legality, hardware and non-hardware
|
Fan, C.K.;Chiang, C.M.F.;Lee, Y.H. |
| 東海大學 |
2012-11-01 |
Risk analysis for utilizing cloud computing- in perspectives of legality, hardware and non-hardware
|
Fan, C.K.; Chiang, C.-M.F.; Lee, Y.H. |
| 臺大學術典藏 |
2022-05-30T07:08:51Z |
Risk analysis in logistics systems: A research agenda during and after the COVID-19 pandemic
|
Choi T.-M.; Choi T.-M.; TSAN MING CHOI |
| 國立中山大學 |
1998 |
risk analysis of a submerged breakwater
|
C.C. Huang;J.S. Lin |
| 國立臺灣大學 |
1996-06 |
Risk Analysis of Joint Reservoir Operation in Central Taiwan
|
Kuo, J.T.; Chen, C.S.; Liao, Y.H. |
| 國立臺灣科技大學 |
2018 |
Risk analysis of lightning and surge protection devices for power energy structures
|
Liu C.-H.; Muna Y.B.; Chen Y.-T.; Kuo C.-C.; Chang H.-Y. |
| 國立交通大學 |
2014-12-08T15:27:06Z |
Risk analysis of reservoir level during rehabilitation
|
Wu, SJ; Yang, JC; Tung, YK |
| 國立臺灣海洋大學 |
2017-06 |
Risk Analysis of Reservoir Operations Considering Short-Term Flood Control and Long-Term Water Supply: A Case Study for the Da-Han Creek Basin in Taiwan
|
Wen-Ming Cheng; Chien-Lin Huang; Nien-Sheng Hsu; Chih-Chiang Wei |
显示项目 731831-731840 / 2346288 (共234629页) << < 73179 73180 73181 73182 73183 73184 73185 73186 73187 73188 > >> 每页显示[10|25|50]项目
|