| 育達商業科技大學 |
2007 |
Optimum Production Control and Workforce Scheduling of Machining Project
|
羅智耀;侯成一;藍天雄 |
| 育達商業科技大學 |
2008 |
Optimum Production Layout under Space Constraint
|
T.S. Lan |
| 南台科技大學 |
2006-06 |
Optimum production length and process mean setting
|
陳忠和; Chung-Ho Chen |
| 大葉大學 |
2008-11 |
Optimum production of trehalose by immobilized Picrophilus torridus trehalose synthase.
|
Chang, Shu-Wei;Chou, Hsin-Hung;Lee, Guan-Chiun;Shaw, Jei-Fu |
| 育達商業科技大學 |
2007 |
Optimum Production Planning Model under Probabilistic Market Demand
|
藍天雄;羅智耀 |
| 南台科技大學 |
2008-08-07~09 |
Optimum production run length and target value setting for a filling process
|
陳忠和; Chung-Ho Chen |
| 南台科技大學 |
2008-01 |
Optimum production run length and warranty period setting for the imperfect production system
|
陳忠和; Chung-Ho Chen |
| 南台科技大學 |
2006-08 |
Optimum production run length and warranty period setting for the imperfect production system
|
陳忠和; Chung-Ho Chen |
| 淡江大學 |
1978-08 |
Optimum PWM inverter drives for induction motors
|
Shiu, Yuan-yih; 許源裕; Yang, Wei-tzen; 楊維楨 |
| 國立臺灣海洋大學 |
2013 |
Optimum quantizing of monotonic nondecreasing arrays
|
William Wei-Yuan Hsu; Cheng-Yu Lu; Ming-Yang Kao; Jan-Ming Ho |
| 國立臺灣海洋大學 |
2013 |
Optimum quantizing of monotonic nondecreasing arrays
|
William Wei-Yuan Hsu; Cheng-Yu Lu; Ming-Yang Kao; Jan-Ming Ho |
| 嘉南藥理大學 |
2019 |
Optimum recovery of phosphate from simulated wastewater by unseeded fluidized-bed crystallization process
|
Pahunang, Rekich R.; Ballesteros, Florencio C., Jr.; de Luna, Mark Daniel G.; Vilando, Anabella C.; Lu, Ming-Chun |
| 國立臺灣科技大學 |
2020 |
Optimum replacement policy for cumulative damage models based on multi-attributes
|
Sheu, Sheu S.-H.;Liu, T.-H.;Zhang, Zhang Z.-G.;Tsai, H.-N. |
| 亞洲大學 |
2020-01-20 |
Optimum Replacement Policy for Cumulative Damage Models Based on Multi-Attributes
|
徐世輝; SHEU, SHEY-HUEI; Liu, Tzu-Hsin; Zhe-George, Zhe-George Z; Zhang, Zhe-George; Tsa, Hsin-Nan; Tsai, Hsin-Nan |
| 南台科技大學 |
1986 |
Optimum Replacement Policy for Multi-Tool Operations
|
陳茂生;賴明材 |
| 國立成功大學 |
2009-05 |
Optimum sample size allocation to minimize cost or maximize power for the two-sample trimmed mean test
|
Guo, Jiin-Huarng; Luh, Wei-Ming |
| 國立屏東大學 |
2009 |
Optimum sample size allocation to minimize cost or maximize power for the two-sample trimmed mean test.
|
郭錦煌;Guo, J.H.,;Luh, W.M. |
| 臺大學術典藏 |
2020-03-02T06:39:56Z |
Optimum sampling for track PEB CD integrated metrology
|
Chen, A.; Hsueh, S.; Blue, J.; ARGON CHEN |
| 臺大學術典藏 |
2020-03-02T06:40:11Z |
Optimum sampling for track PEB CD integrated metrology
|
Chen, A.; Hsueh, S.; Blue, J.; JAKEY BLUE |
| 淡江大學 |
1978-04 |
Optimum scheduling of power generation
|
Yang, Wei-tzen; 楊維楨 |
| 淡江大學 |
2009 |
Optimum screening procedure for a production process with surrogate variables
|
孫湘斐; Sun, Xiang-fei |
| 國立成功大學 |
2011-07 |
Optimum Shape Design for Three-Layer Interfacial Surfaces
|
Huang, Cheng-Hung; Wuchiu, Cheng-Tso |
| 淡江大學 |
2013 |
Optimum Slide-way Structural Design for A New Polarized Scattering Instrument
|
Shih, C.J.; Teng, T-L; Liang, C-C; Huang, Y. A |
| 淡江大學 |
2012-07-15 |
Optimum Slide-way Structural Design for A New Polarized Scattering Instrument
|
Shih, C. J., Teng, T. L., Liang, C.C. Huang, Y. A. |
| 國立臺灣海洋大學 |
1995 |
Optimum Spacings of Longitudinal Convective Fin Arrays
|
Yeh R.H.;Liaw S.P.;Chang M. |