國立交通大學 |
2018-08-21T05:57:05Z |
Capacity Outer Bound and Degrees of Freedom of Wiener Phase Noise Channels with Oversampling
|
Barletta, Luca; Rini, Stefano |
國立臺灣科技大學 |
1999 |
Capacity Planning for a Twin Fab
|
Chen, J. C. ; Fan, Y. C. ; Wang, J. Y. ; Lin, T. K. ; Leea, S. H. ; Wu, S. C. ; Lan, Y. J. |
中原大學 |
1999 |
Capacity Planning for a Twin Fab
|
J. C. Chen;Y. C. Fan;J. Y. Wang;T. K. Lin;S. H. Leea;S. C. Wu;Y. J. Lan; |
中華大學 |
2008 |
Capacity Planning for Batch-Serial Processes with Time Constraints in Wafer Fabrication
|
杜瑩美; Tu, Ying Mei |
國立臺灣科技大學 |
2011 |
Capacity Planning for Cluster Tools of Wafer Fabrication Plant
|
Chen, J. C. ; Chen, C. W. ; Chen, K. H. ; Lin, C. H. |
國立臺灣科技大學 |
2010 |
Capacity Planning for Cluster Tools of Wafer Fabrication Plant
|
Chen, J. C. ; Chen, C. W. ; Chen, K. H. ; Lin, C. H. |
國立臺灣科技大學 |
2007 |
Capacity Planning for Serial and Batch Machines with Capability for Wafer Fabrication Plant
|
Chen, J. C. ; Chen, C. W. ; Lin, C. J. |
中原大學 |
2007-10-20 |
Capacity Planning for Serial and Batch Machines with Capability for Wafer Fabrication Plant
|
J. C. Chen;C. W. Chen;C. J. Lin; |
國立臺灣科技大學 |
2009 |
Capacity Planning for Weapon Production System
|
Chen, J. C. ; Chen, K. H. ; Lin, C. H. ; Chen, C. W. ; Yang, C. L. ; He, S. H. |
國立臺灣科技大學 |
2016 |
Capacity planning in thin film transistor - Liquid crystal display cell process
|
Chen, J.C;Chen, T.-L;Pratama, B.R;Tu, Q.-F. |
國立臺灣科技大學 |
2010 |
Capacity Planning of Serial and Batch Machines with Capability Constraints for Wafer Fabrication Plants
|
Chen, J. C. ; Chen, C. W. |
國立臺灣科技大學 |
2008 |
Capacity Planning System for IC Final Test Plant
|
Chen, J. C. ; Sun, C. J. ; Chen, C. C. |
中原大學 |
2008-12-04 |
Capacity Planning System for IC Final Test Plant
|
J. C. Chen;C. J. Sun;C. C. Chen; |
國立臺灣科技大學 |
2016 |
Capacity planning with ant colony optimization for TFT-LCD array manufacturing
|
Chen, J.C;Chen, T.-L;Pratama, B.R;Tu, Q.-F. |
國立臺灣科技大學 |
2018 |
Capacity planning with ant colony optimization for TFT-LCD array manufacturing
|
Chen, J.C.;Chen, T.-L.;Pratama, B.R.;Tu, Q.-F. |
國立臺灣科技大學 |
2002 |
Capacity Planning with Capability for Multiple Fabs
|
Chen, J. C. ; Lin, C. J. ; Rau, H. ; Chen, C. W. ; Tyan, J. C. |
中原大學 |
2002-06 |
Capacity Planning with Capability for Multiple Fabs
|
J. C. Chen;C. J. Lin;H. Rau;C. W. Chen;J. C. Tyan; |
中原大學 |
2002-06-29 |
Capacity Planning with Capability for Multiple Fabs
|
J. C. Chen;C. J. Lin;H. Rau;C. W. Chen;J. C. Tyan |
中原大學 |
2002-06-26 |
Capacity Planning with Capability for Multiple Fabs
|
J. C. Chen;C. J. Lin;H. Rau;C. W. Chen;J. C. Tyan |
國立臺灣科技大學 |
2005 |
Capacity planning with capability for multiple semiconductor manufacturing fabs
|
Chen, J. C. ; Chen, C-W. ; Chen, Lin, C. J. ; Rau, H. |
中原大學 |
2005-06 |
Capacity Planning with Capability for Multiple Semiconductor Manufacturing Fabs
|
James C. Chen;Chia-Wen Chen;C. Joe Lin;Hsin Rau |
中華大學 |
2010 |
Capacity planning with sequential time constraints under various control policies in the back-end of wafer fabrications
|
杜瑩美; Tu, Ying Mei |
中華大學 |
2009 |
Capacity planning with sequential two-level of time constraints in the back-end of wafer fabrication
|
杜瑩美; Tu, Ying Mei |
國立臺灣科技大學 |
2017 |
Capacity planning with technology replacement by stochastic dynamic programming
|
Wang, K.-J;Nguyen, P.H. |
中華大學 |
2008 |
Capacity pricing mechanism for wafer fabrication
|
李欣怡; Lee, Amy Hsin-I |