|
English
|
正體中文
|
简体中文
|
總筆數 :2823024
|
|
造訪人次 :
30273188
線上人數 :
1126
教育部委託研究計畫 計畫執行:國立臺灣大學圖書館
|
|
|
"chiu tiffany"的相關文件
顯示項目 1-9 / 9 (共1頁) 1 每頁顯示[10|25|50]項目
朝陽科技大學 |
2024-06 |
Effects of physical activity intervention on reducing neck and upper extremity pain intensity for female office computer workers
|
Sung, Peng-Cheng;Chiu, Tiffany;Wang, Yunsen; 宋鵬程 |
朝陽科技大學 |
2021-06 |
Multi-item Production Lot Sizing with Postponement, External Source for Common Parts, and Adjustable Rate for End Products
|
邱元錫; Chiu, Singa Wang; Wu, Hua-Yao; Chiu, Tiffany |
朝陽科技大學 |
2021-03 |
ECONOMIC MANUFACTURING QUANTITY MODEL WITH MACHINE FAILURE, OVERTIME, AND REWORK/DISPOSAL OF NONCONFORMING ITEMS
|
邱元錫; 王聖嘉; Chiu, Tiffany; Lin, Hong-Dar |
朝陽科技大學 |
2021-01 |
A multi-item batch fabrication problem featuring delayed product differentiation, outsourcing, and quality assurance
|
邱元錫; 張輝鑫; 王聖嘉; Chiu, Tiffany |
朝陽科技大學 |
2020-09 |
The Collective Influence of Component Commonality, Adjustable-Rate, Postponement, and Rework on Multi-Item Manufacturing Decision
|
Chiu, Tiffany; You, Liang-Wei;Ye, Tsu-Ming; 王聖嘉 |
朝陽科技大學 |
2020-06-15 |
Combining the delayed differentiation policy and common parts’ partial outsourcing strategy into a multi-item FPR-based system
|
王聖嘉; 邱元錫; Zhao, Zhong-Yun; Chiu, Tiffany |
朝陽科技大學 |
2019-07 |
Satisfying multiproduct demand with a FPR-based inventory system featuring expedited rate and scraps
|
王聖嘉; 邱元錫; Huang, Yi-Jing; Chiu, Tiffany |
朝陽科技大學 |
2019-05-21 |
Production planning incorporating issues of reliability and backlogging with service level constraint
|
Chiu, Tiffany; Liang, Gang-Ming; 王聖嘉; 邱元錫 |
朝陽科技大學 |
2017-10-18 |
On effect of delayed differentiation on a multiproduct vendor–buyer integrated inventory system with rework
|
王聖嘉; Wu, Mei-Fang; Chiu, Tiffany; Lin, Hong-Dar |
顯示項目 1-9 / 9 (共1頁) 1 每頁顯示[10|25|50]項目
|