|
English
|
正體中文
|
简体中文
|
总笔数 :0
|
|
造访人次 :
52721076
在线人数 :
605
教育部委托研究计画 计画执行:国立台湾大学图书馆
|
|
|
"cho chiwoon"的相关文件
显示项目 1-5 / 5 (共1页) 1 每页显示[10|25|50]项目
| 國立交通大學 |
2019-04-03T06:38:53Z |
Mathematical Problems in Emerging Manufacturing Systems Management
|
Yang, Taho; Chen, Mu-Chen; Chan, Felix T. S.; Cho, Chiwoon; Kumar, Vikas |
| 國立成功大學 |
2012-12 |
Simulation study for a proposed segmented automated material handling system design for 300-mm semiconductor fabs
|
Hsieh, Chiung-Hsi; Cho, Chiwoon; Yang, Taho; Chang, Ting-Jiun |
| 國立成功大學 |
2012 |
The use of a simulation, a hybrid Taguchi, and dual response surface methods in the automated material handling system tool-to-tool strategy for a 300-mm fab
|
Yang, Taho; Shen, Yu-An; Cho, Chiwoon |
| 國立成功大學 |
2008-06 |
Using simulation and multi-criteria methods to provide robust solutions to dispatching problems in a flow shop with multiple processors
|
Kuo, Yiyo; Yang, Taho; Cho, Chiwoon; Tseng, Yao-Ching |
| 國立成功大學 |
2007-02-01 |
A genetic algorithms simulation approach for the multi-attribute combinatorial dispatching decision problem
|
Yang, Taho; Kuo, Yiyo; Cho, Chiwoon |
显示项目 1-5 / 5 (共1页) 1 每页显示[10|25|50]项目
|