|
English
|
正體中文
|
简体中文
|
总笔数 :2823024
|
|
造访人次 :
30215657
在线人数 :
1012
教育部委托研究计画 计画执行:国立台湾大学图书馆
|
|
|
"chung t p"的相关文件
显示项目 1-10 / 10 (共1页) 1 每页显示[10|25|50]项目
國立臺灣科技大學 |
2017 |
Multiple-variable neighbourhood search for the single-machine total weighted tardiness problem
|
Chung, T.-P;Fu, Q;Liao, C.-J;Liu, Y.-T. |
國立臺灣科技大學 |
2016 |
Two new approaches for a two-stage hybrid flowshop problem with a single batch processing machine under waiting time constraint
|
Chung, T.-P;Sun, H;Liao, C.-J. |
國立臺灣科技大學 |
2015 |
Integrating production and transportation scheduling in a two-stage supply chain
|
Liao, C.-J.;Kuo, Y.-W.;Chung, T.-P.;Shih, S.C. |
國立臺灣科技大學 |
2014 |
A canned food scheduling problem with batch due date
|
Chung, T.-P.;Liao, C.-J.;Smith, M. |
國立臺灣科技大學 |
2014 |
Scheduling with multi-attribute setup times on two identical parallel machines
|
Lee, C.-H.;Liao, C.-J.;Chung, T.-P. |
國立臺灣科技大學 |
2013 |
An immunoglobulin-based artificial immune system for solving the hybrid flow shop problem
|
Chung, T.-P.;Liao, C.-J. |
國立臺灣科技大學 |
2012 |
An approach using particle swarm optimization and bottleneck heuristic to solve hybrid flow shop scheduling problem
|
Liao, C.-J.;Tjandradjaja, E.;Chung, T.-P. |
國立臺灣科技大學 |
2012 |
Minimizing makespan on parallel machines with batch arrivals
|
Chung, T.-P.;Liao, C.-J.;Lin, C.-H. |
國立臺灣科技大學 |
2010 |
Scheduling on identical machines with batch arrivals
|
Chung T.-P.; Liao C.-J.; Su L.-H. |
國立臺灣科技大學 |
2008 |
Scheduling on identical machines with batch arrivals in semiconductor testing house
|
Chung T.P.; Liao C.J.; Su L.H. |
显示项目 1-10 / 10 (共1页) 1 每页显示[10|25|50]项目
|