|
English
|
正體中文
|
简体中文
|
Total items :0
|
|
Visitors :
53307420
Online Users :
1067
Project Commissioned by the Ministry of Education Project Executed by National Taiwan University Library
|
|
|
|
Taiwan Academic Institutional Repository >
Browse by Author
|
"huang feng yi"
Showing items 1-19 of 19 (1 Page(s) Totally) 1 View [10|25|50] records per page
| 國立交通大學 |
2017-04-21T06:56:17Z |
Click "Like" on Facebook: The Effect of Customer-to-customer Interaction on Customer Voluntary Performance for Social Networking Sites
|
Hu, Kai-Chieh; Lu, Mingying; Huang, Feng-Yi; Jen, William |
| 國立交通大學 |
2017-04-21T06:56:10Z |
Click "Like" on Facebook: The Effect of Customer-to-customer Interaction on Customer Voluntary Performance for Social Networking Sites
|
Hu, Kai-Chieh; Lu, Mingying; Huang, Feng-Yi; Jen, William |
| 亞洲大學 |
2016 |
The Study of Organizational Change for Mio Li County Fire Department Rescue System
|
Huang, Feng-Yi |
| 亞洲大學 |
2016 |
The Study of Organizational Change for Mio Li County Fire Department Rescue System
|
Huang, Feng-Yi |
| 元智大學 |
2012-06-27 |
A Green Design for Assembly Model for Integrated Design Evaluation and Assembly and Disassembly Sequence Planning
|
Tseng Y.-J.; Yu, Fang-Yu; Huang, Feng-Yi |
| 元智大學 |
2012-06-07 |
Integrated evaluation of product design and forward supply chain and reverse supply chain using FANP
|
Tseng Y.-J.; Wang, Yen-Jung; Lee, Pei-Ju; Huang, Feng-Yi |
| 元智大學 |
2012-06-07 |
A design for supply chain model for supplier selection in a closed-loop supply chain using a mathematical model
|
Tseng Y.-J.; Wang, Yen-Jung; Chen, Chia-Chi; Huang, Feng-Yi |
| 元智大學 |
2012-06-07 |
A design for supply chain model for supplier selection in a closed-loop supply chain using a mathematical model
|
Tseng Y.-J.; Wang, Yen-Jung; Chen, Chia-Chi; Huang, Feng-Yi |
| 東吳大學 |
2012 |
按個「讚」吧!網路社群顧客互動對顧客自發行為之影響
|
黃鳳儀; Huang, Feng-yi |
| 國立政治大學 |
2012 |
比利時多元文化主義發展之研究
|
黃鳳儀; Huang, Feng Yi |
| 元智大學 |
2011-11 |
A Green Assembly Sequence Planning Model with a Closed-Loop Assembly and Disassembly Sequence Planning Using a Particle Swarm Optimization Method
|
Tseng Y.-J.; Yu, Fang-Yu; Huang, Feng-Yi |
| 元智大學 |
2011-11 |
A Green Assembly Sequence Planning Model with a Closed-Loop Assembly and Disassembly Sequence Planning Using a Particle Swarm Optimization Method
|
Tseng Y.-J.; Yu, Fang-Yu; Huang, Feng-Yi |
| 元智大學 |
2010-07 |
Supplier Selection and Evaluation Models for a Design Change Scheme in Collaborative Manufacturing Environment
|
鄭元杰; Su, Yu-Ju; Huang, Feng-Yi |
| 元智大學 |
2010-07 |
A green decision support system for integrated assembly and disassembly planning using a PSO approach
|
鄭元杰; Yu, Fang-Yu; Huang, Feng-Yi |
| 元智大學 |
2009-12 |
Tolerance allocation using particle swam optimization for production planning in the collaborative manufacturing environment
|
鄭元杰; Huang, Feng-Yi |
| 元智大學 |
2009-12 |
A multi-plant assembly sequence planning model with assembly sequence planning and plant assignment using case-based reasoning and GA methods
|
鄭元杰; Huang, Feng-Yi; Hung, Tzu-Yin; Lin, Yu-Hu |
| 元智大學 |
2009-12 |
A multi-plant and multi-stage capacity planning model for IC packaging processes
|
鄭元杰; Huang, Feng-Yi; Ku, Ting-Yu; Lin, Yu-Hua |
| 元智大學 |
2009-12 |
An integrated assembly sequence planning and plant assignment model for products assembled in a multi-plant system
|
鄭元杰; Chen, Jian-yu; Huang, Feng-Yi |
| 元智大學 |
2007-07 |
Integrated evaluation of design task assignment and manufacturing operation distribution in a multi-plant collaborative system
|
鄭元杰; Li, Wan-Ping; Huang, Feng-Yi |
Showing items 1-19 of 19 (1 Page(s) Totally) 1 View [10|25|50] records per page
|