|
English
|
正體中文
|
简体中文
|
總筆數 :0
|
|
造訪人次 :
52808747
線上人數 :
585
教育部委託研究計畫 計畫執行:國立臺灣大學圖書館
|
|
|
"lee amy hsin i"的相關文件
顯示項目 86-110 / 160 (共7頁) << < 1 2 3 4 5 6 7 > >> 每頁顯示[10|25|50]項目
| 國立勤益科技大學 |
2008 |
A DEA window analysis on the product family mix selection for a semiconductor fabricator
|
Chung, Shu-Hsing;Lee, Amy Hsin-I ;Kang, He-Yau ;Lai, Chih-Wei |
| 中華大學 |
2008 |
印刷電路板產業之生產策略模式建構之初探
|
李欣怡; Lee, Amy Hsin-I |
| 中華大學 |
2008 |
考量要徑影響程度下之專案績效評估模式
|
李欣怡; Lee, Amy Hsin-I |
| 中華大學 |
2008 |
A MIP Model for IC Final Testing Order Selection Problem
|
李欣怡; Lee, Amy Hsin-I |
| 中華大學 |
2008 |
Evaluating buyer-supplier relationships in high-tech industry by analytic network process (ANP)
|
李欣怡; Lee, Amy Hsin-I |
| 中華大學 |
2008 |
A fuzzy goal programming with mixed 0-1 integer model approach for color filter inventory management in TFT-LCD manufacturing
|
李欣怡; Lee, Amy Hsin-I |
| 中華大學 |
2008 |
Preliminary study of a fuzzy integrated model for new product development of TFT-LCD
|
李欣怡; Lee, Amy Hsin-I |
| 中華大學 |
2008 |
油品市場顧客服務品質知覺評價
|
李欣怡; Lee, Amy Hsin-I |
| 中華大學 |
2008 |
台灣半導體製造業零件供應商評估之研究
|
李欣怡; Lee, Amy Hsin-I |
| 中華大學 |
2008 |
Capacity pricing mechanism for wafer fabrication
|
李欣怡; Lee, Amy Hsin-I |
| 中華大學 |
2008 |
A DEA window analysis on the product family mix selection for a semiconductor fabricator for a semiconductor fabricator
|
李欣怡; Lee, Amy Hsin-I |
| 中華大學 |
2008 |
A priority mix planning model for semiconductor fabrication under an uncertain information environment
|
李欣怡; Lee, Amy Hsin-I |
| 中華大學 |
2008 |
專案延遲極小化的活動工時緩衝設計
|
李欣怡; Lee, Amy Hsin-I |
| 中華大學 |
2008 |
Developing new products with knowledge management methods and process development management in a network
|
李欣怡; Lee, Amy Hsin-I |
| 中華大學 |
2008 |
Operating NPD innovatively with different technologies under a variant social environment
|
李欣怡; Lee, Amy Hsin-I |
| 中華大學 |
2008 |
Developing new products in a network with efficiency and innovation
|
李欣怡; Lee, Amy Hsin-I |
| 中華大學 |
2008 |
A mixed 0-1 integer programming for inventory model: A case study of TFT-LCD manufacturing company in Taiwan
|
李欣怡; Lee, Amy Hsin-I |
| 中華大學 |
2008 |
Strategic management of new products development at technological conglomerate network using expert support systems
|
李欣怡; Lee, Amy Hsin-I |
| 中華大學 |
2008 |
A fuzzy AHP and BSC approach for evaluating performance of IT department in the manufacturing industry in Taiwan
|
李欣怡; Lee, Amy Hsin-I |
| 中華大學 |
2008 |
Heuristic algorithms to solve the capacity allocation problem in photolithography area (CAPPA)
|
李欣怡; Lee, Amy Hsin-I |
| 中華大學 |
2007 |
A design of tool allocation mechanism in TFT-LCD array process
|
李欣怡; Lee, Amy Hsin-I |
| 中華大學 |
2007 |
The supplier selection of semiconductor packaging companies
|
李欣怡; Lee, Amy Hsin-I |
| 中華大學 |
2007 |
Minimizing the Total Completion Time for the TFT-Array Factory Scheduling Problem (TAFSP)
|
李欣怡; Lee, Amy Hsin-I |
| 中華大學 |
2007 |
TFT-LCD supplier selection by downstream manufacturer using fuzzy multi-choice goal programming
|
李欣怡; Lee, Amy Hsin-I |
| 中華大學 |
2007 |
Collaborative production-distribution planning for semiconductor production turnkey service
|
李欣怡; Lee, Amy Hsin-I |
顯示項目 86-110 / 160 (共7頁) << < 1 2 3 4 5 6 7 > >> 每頁顯示[10|25|50]項目
|