|
"li rk"的相關文件
顯示項目 1-38 / 38 (共1頁) 1 每頁顯示[10|25|50]項目
| 國立交通大學 |
2019-04-02T05:59:35Z |
A methodology for schedule compression
|
Wu, HH; Li, RK |
| 國立交通大學 |
2019-04-02T05:59:32Z |
Design of a rule-based continuous process controller using modified IDEF0 methodology
|
Chen, SG; Wu, MZ; Li, RK |
| 國立交通大學 |
2019-04-02T05:58:45Z |
Integrating order release control with due-date assignment rules
|
Tsai, CH; Chang, GT; Li, RK |
| 國立交通大學 |
2014-12-08T15:49:12Z |
Constraint time buffer determination model
|
Tu, YM; Li, RK |
| 國立交通大學 |
2014-12-08T15:46:42Z |
The construction of production performance prediction system for semiconductor manufacturing with artificial neural networks
|
Huang, CL; Huang, YH; Chang, TY; Chang, SH; Chung, CH; Huang, DT; Li, RK |
| 國立交通大學 |
2014-12-08T15:46:22Z |
Mixing macro and micro flowtime estimation model: wafer fab example
|
Tseng, TY; Ho, TF; Li, RK |
| 國立交通大學 |
2014-12-08T15:45:34Z |
A due-date oriented scheduling heuristic for job shop cellular manufacturing system
|
Tsai, CH; Li, RK |
| 國立交通大學 |
2014-12-08T15:43:16Z |
Process capability analysis for an entire product
|
Chen, KS; Huang, ML; Li, RK |
| 國立交通大學 |
2014-12-08T15:42:58Z |
Capability evaluation of a product family for processes of the larger-the-better type
|
Chen, KS; Li, RK; Liao, SJ |
| 國立交通大學 |
2014-12-08T15:42:58Z |
Process quality analysis of products
|
Chen, KS; Chen, SC; Li, RK |
| 國立交通大學 |
2014-12-08T15:42:38Z |
Exact solution of inventory replenishment policy for a linear trend in demand - two-equation model
|
Lo, WY; Tsai, CH; Li, RK |
| 國立交通大學 |
2014-12-08T15:41:27Z |
Enhancement of Theory of Constraints replenishment using a novel generic buffer management procedure
|
Yuan, KJ; Chang, SH; Li, RK |
| 國立交通大學 |
2014-12-08T15:40:19Z |
Heuristic PAC model for hybrid MTO and MTS production environment
|
Chang, SH; Pai, PF; Yuan, KJ; Wang, BC; Li, RK |
| 國立交通大學 |
2014-12-08T15:37:10Z |
Heuristic dispatching rule to maximize TDD and IDD performance
|
Ho, TF; Li, RK |
| 國立交通大學 |
2014-12-08T15:36:48Z |
A new ART-counterpropagation neural network for solving a forecasting problem
|
Liu, TC; Li, RK |
| 國立交通大學 |
2014-12-08T15:18:31Z |
Contract manufacturer selection by using the process incapability index C-pp
|
Chen, KS; Chen, KL; Li, RK |
| 國立交通大學 |
2014-12-08T15:18:21Z |
Graphical analysis of capability of a process producing a product family
|
Huang, ML; Chen, KS; Li, RK |
| 國立交通大學 |
2014-12-08T15:17:52Z |
Suppliers capability and price analysis chart
|
Chen, KL; Chen, KS; Li, RK |
| 國立交通大學 |
2014-12-08T15:17:31Z |
Development of an artificial neural network to predict lead frame dimensions in an etching process
|
Liu, TC; Li, RK; Chen, MC |
| 國立交通大學 |
2014-12-08T15:06:01Z |
A FRAMEWORK FOR THE INTEGRATION OF COMPUTER-AIDED-DESIGN AND COMPUTER-AIDED PROCESS PLANNING
|
LI, RK; BEDWORTH, DD |
| 國立交通大學 |
2014-12-08T15:05:57Z |
A PART-FEATURE RECOGNITION SYSTEM FOR ROTATIONAL PARTS
|
LI, RK |
| 國立交通大學 |
2014-12-08T15:05:46Z |
A PART-FEATURE RECOGNITION SYSTEM FOR ROTATIONAL PARTS - NON-TURNING FEATURES
|
LI, RK; HWANG, TZ |
| 國立交通大學 |
2014-12-08T15:05:37Z |
A FRAMEWORK FOR PRISMATIC PART-DATA GENERATION - UNIT-MACHINED LOOP CONCEPT
|
LI, RK; YU, MH |
| 國立交通大學 |
2014-12-08T15:05:33Z |
AUTOMATIC 3D MACHINING FEATURE-EXTRACTION FROM 3D CSG SOLID INPUT
|
PERNG, DB; CHEN, Z; LI, RK |
| 國立交通大學 |
2014-12-08T15:05:23Z |
A 2-STAGE FEATURE-BASED DESIGN SYSTEM
|
LI, RK; TAUR, BW; SHYUR, HJ |
| 國立交通大學 |
2014-12-08T15:05:21Z |
A DGR METHOD FOR EXTRACTING THE TOPOLOGY OF AN UPPER-HALF PROFILE OF A TURNED PART FROM CAD DATA
|
CHEN, SL; CHEN, Z; LI, RK |
| 國立交通大學 |
2014-12-08T15:05:12Z |
MACHINABLE VOLUMES EXTRACTION - NON-BLOCK TYPE RAW-MATERIAL INPUT
|
LI, RK; TZIENG, SD |
| 國立交通大學 |
2014-12-08T15:05:00Z |
ASSEMBLY CODE GENERATION FROM A FEATURE-BASED GEOMETRIC MODEL
|
LI, RK; HUANG, CL |
| 國立交通大學 |
2014-12-08T15:04:46Z |
A FRAMEWORK FOR AUTOMATIC DFA SYSTEM-DEVELOPMENT
|
LI, RK; HWANG, CL |
| 國立交通大學 |
2014-12-08T15:04:27Z |
COMPOSITE FEATURE AND VARIATIONAL DESIGN CONCEPTS IN A FEATURE-BASED DESIGN SYSTEM
|
LI, RK; TU, YM; YANG, TH |
| 國立交通大學 |
2014-12-08T15:04:25Z |
A HEURISTIC RESCHEDULING ALGORITHM FOR COMPUTER-BASED PRODUCTION SCHEDULING SYSTEMS
|
LI, RK; SHYU, YT; ADIGA, S |
| 國立交通大學 |
2014-12-08T15:03:53Z |
A MULTIECHELON EVALUATION FRAMEWORK FOR CIM SYSTEMS-DESIGN
|
LIU, MC; TSAI, TJ; LIANG, SK; LI, RK |
| 國立交通大學 |
2014-12-08T15:03:32Z |
FEATURE MODIFICATION FRAMEWORK FOR FEATURE-BASED DESIGN SYSTEMS
|
LI, RK; LIN, CY; WU, HH |
| 國立交通大學 |
2014-12-08T15:03:14Z |
A NEW RESCHEDULING METHOD FOR COMPUTER-BASED SCHEDULING SYSTEMS
|
WU, HH; LI, RK |
| 國立交通大學 |
2014-12-08T15:02:31Z |
A methodology for schedule compression
|
Wu, HH; Li, RK |
| 國立交通大學 |
2014-12-08T15:01:30Z |
Design of a rule-based continuous process controller using modified IDEF0 methodology
|
Chen, SG; Wu, MZ; Li, RK |
| 國立交通大學 |
2014-12-08T15:01:25Z |
Design of a rule-based flexible manufacturing system controller using modified IDEF0 methodology
|
Chen, SG; Wu, MZ; Li, RK |
| 國立交通大學 |
2014-12-08T15:01:17Z |
Integrating order release control with due-date assignment rules
|
Tsai, CH; Chang, GT; Li, RK |
顯示項目 1-38 / 38 (共1頁) 1 每頁顯示[10|25|50]項目
|