|
English
|
正體中文
|
简体中文
|
Total items :0
|
|
Visitors :
51645871
Online Users :
864
Project Commissioned by the Ministry of Education Project Executed by National Taiwan University Library
|
|
|
|
Taiwan Academic Institutional Repository >
Browse by Author
|
"liao c j"
Showing items 71-80 of 137 (14 Page(s) Totally) << < 3 4 5 6 7 8 9 10 11 12 > >> View [10|25|50] records per page
| 國立臺灣科技大學 |
2012 |
Scheduling with multi-attribute setup times
|
Lee, C.-H.;Liao, C.-J.;Chao, C.-W. |
| 國立臺灣科技大學 |
2012 |
A case study of batch scheduling for an assembly shop
|
Lin, R.;Liao, C.-J. |
| 國立臺灣科技大學 |
2012 |
A discrete electromagnetism-like mechanism for single machine total weighted tardiness problem with sequence-dependent setup times
|
Chao, C.-W.;Liao, C.-J. |
| 國立臺灣科技大學 |
2012 |
An approach using particle swarm optimization and bottleneck heuristic to solve hybrid flow shop scheduling problem
|
Liao, C.-J.;Tjandradjaja, E.;Chung, T.-P. |
| 國立臺灣科技大學 |
2012 |
Neighborhood search procedures for single machine tardiness scheduling with sequence-dependent setups
|
Liao, C.-J.;Tsou, H.-H.;Huang, K.-L. |
| 國立臺灣科技大學 |
2012 |
Minimizing makespan on parallel machines with batch arrivals
|
Chung, T.-P.;Liao, C.-J.;Lin, C.-H. |
| 國立臺灣科技大學 |
2012 |
A tropical Cyclone-based Method for global optimization
|
Chao, C.-W.;Fang, S.-C.;Liao, C.-J. |
| 國立臺灣科技大學 |
2012 |
An improved heuristic for parallel machine weighted flowtime scheduling with family set-up times
|
Liao, C.-J.;Chao, C.-W.;Chen, L.-C. |
| 國立臺灣科技大學 |
2012 |
Scheduling with multi-attribute setup times
|
Lee, C.-H.;Liao, C.-J.;Chao, C.-W. |
| 國立臺灣科技大學 |
2011 |
Approaches to eliminate waste and reduce cost for recycling glass
|
Chao, C.W.;Liao, C.J. |
Showing items 71-80 of 137 (14 Page(s) Totally) << < 3 4 5 6 7 8 9 10 11 12 > >> View [10|25|50] records per page
|