| 國立臺灣科技大學 |
2015 |
An efficient heuristic for a two-stage assembly scheduling problem with batch setup times to minimize makespan
|
Liao, C.-J.;Lee, C.-H.;Lee, H.-C. |
| 國立臺灣科技大學 |
2015 |
Understanding innovation for sustainable business management capabilities and competencies under uncertainty
|
Wu, K.-J.;Liao, C.-J.;Tseng, M.-L.;Chou, P.-J. |
| 國立臺灣科技大學 |
2015 |
Vision-Based Hand Gesture Recognition System for a Dynamic and Complicated Environment
|
Liao, C.-J;Su, Su S.-F;Chen, M.-C. |
| 國立臺灣師範大學 |
2014-12-02T06:33:51Z |
A comparative study of the professional competences development in Asian sport industry in higher education
|
Cheng, Philip S. T.; Fang, E.; Liao, C. J.; Lin, B.Y. |
| 國立臺灣師範大學 |
2014-12-02T06:33:51Z |
A comparative study of the professional competences development in Asian sport industry in higher education
|
Cheng, Philip S. T.; Fang, E.; Liao, C. J.; Lin, B.Y. |
| 國立臺灣科技大學 |
2014 |
A canned food scheduling problem with batch due date
|
Chung, T.-P.;Liao, C.-J.;Smith, M. |
| 國立臺灣科技大學 |
2014 |
Exploring decisive factors in green supply chain practices under uncertainty
|
Wu, K.-J.;Liao, C.-J.;Tseng, M.-L.;Chiu, A.S.F. |
| 國立臺灣科技大學 |
2014 |
Scheduling with multi-attribute setup times on two identical parallel machines
|
Lee, C.-H.;Liao, C.-J.;Chung, T.-P. |
| 國立臺灣科技大學 |
2014 |
A comparison of five hybrid metaheuristic algorithms for unrelated parallel-machine scheduling and inbound trucks sequencing in multi-door cross docking systems
|
Liao, T.W.;Chang, P.C.;Kuo, R.J.;Liao, C.-J. |
| 國立臺灣科技大學 |
2014 |
Unrelated parallel machine scheduling with dedicated machines and common deadline
|
Lee, C.-H.;Liao, C.-J.;Chao, C.-W. |
| 國立臺灣科技大學 |
2014 |
Risk management for outsourcing biomedical waste disposal - Using the failure mode and effects analysis
|
Liao, C.-J.;Ho, C.C. |
| 國立臺灣科技大學 |
2013 |
An immunoglobulin-based artificial immune system for solving the hybrid flow shop problem
|
Chung, T.-P.;Liao, C.-J. |
| 國立臺灣科技大學 |
2013 |
Batch scheduling problem for a machinery factory with fixed-position layout
|
Lin, R.;Liao, C.-J. |
| 國立臺灣科技大學 |
2013 |
Meta-heuristics for manufacturing scheduling and logistics problems
|
Liao, C.-J.;Gen, M.;Tiwari, M.K.;Chang, P.-C. |
| 國立臺灣科技大學 |
2013 |
Evaluation of advantages of an energy storage system using recycled EV batteries
|
Chen, T.-H.;Hsieh, T.-Y.;Yang, N.-C.;Yang, J.-S.;Liao, C.-J. |
| 國立臺灣科技大學 |
2012 |
Scheduling with multi-attribute setup times
|
Lee, C.-H.;Liao, C.-J.;Chao, C.-W. |
| 國立臺灣科技大學 |
2012 |
A case study of batch scheduling for an assembly shop
|
Lin, R.;Liao, C.-J. |
| 國立臺灣科技大學 |
2012 |
A discrete electromagnetism-like mechanism for single machine total weighted tardiness problem with sequence-dependent setup times
|
Chao, C.-W.;Liao, C.-J. |
| 國立臺灣科技大學 |
2012 |
An approach using particle swarm optimization and bottleneck heuristic to solve hybrid flow shop scheduling problem
|
Liao, C.-J.;Tjandradjaja, E.;Chung, T.-P. |
| 國立臺灣科技大學 |
2012 |
Neighborhood search procedures for single machine tardiness scheduling with sequence-dependent setups
|
Liao, C.-J.;Tsou, H.-H.;Huang, K.-L. |
| 國立臺灣科技大學 |
2012 |
Minimizing makespan on parallel machines with batch arrivals
|
Chung, T.-P.;Liao, C.-J.;Lin, C.-H. |
| 國立臺灣科技大學 |
2012 |
A tropical Cyclone-based Method for global optimization
|
Chao, C.-W.;Fang, S.-C.;Liao, C.-J. |
| 國立臺灣科技大學 |
2012 |
An improved heuristic for parallel machine weighted flowtime scheduling with family set-up times
|
Liao, C.-J.;Chao, C.-W.;Chen, L.-C. |
| 國立臺灣科技大學 |
2012 |
Scheduling with multi-attribute setup times
|
Lee, C.-H.;Liao, C.-J.;Chao, C.-W. |
| 國立臺灣科技大學 |
2011 |
Approaches to eliminate waste and reduce cost for recycling glass
|
Chao, C.W.;Liao, C.J. |
| 國立臺灣科技大學 |
2011 |
A linear programming approach to the electricity contract capacity problem
|
Chen, C.Y.;Liao, C.J. |
| 國立臺灣科技大學 |
2011 |
The use of failure mode and effects analysis to construct an effective disposal and prevention mechanism for infectious hospital waste
|
Ho, C.C.;Liao, C.J. |
| 國立臺灣科技大學 |
2011 |
An ant colony optimization algorithm for setup coordination in a two-stage production system
|
Liao, C.J.;Tsai, Y.L.;Chao, C.W. |
| 國立臺灣科技大學 |
2011 |
An application of variable neighbourhood search to hospital call scheduling of infant formula promotion
|
Lin, H.Y.;Liao, C.J.;Tseng, C.T. |
| 國立臺灣大學 |
2011 |
Effect of Annealing Process on Residual Strain/Stress Behaviors in FePt Thin Films
|
Hsiao, S.N.; Chen, S.K.; Liu, S.H.; Liao, C.J.; Yuan, F.T.; Lee, H.Y. |
| 臺大學術典藏 |
2011 |
Progesterone-regulated B4galnt2 expression is a requirement for embryo implantation in mice
|
Li P.-T.; Liao C.-J.; Wu W.-G.; Yu L.-C.; Chu S.T.; LUNG-CHIH YU |
| 國立臺灣科技大學 |
2010 |
Applying fuzzy simple additive weighting system to health examination institution location selection
|
Lin H.Y.; Liao C.J.; Chang Y.H. |
| 國立臺灣科技大學 |
2010 |
Scheduling on identical machines with batch arrivals
|
Chung T.-P.; Liao C.-J.; Su L.-H. |
| 國立臺灣科技大學 |
2010 |
Vehicle routing with cross-docking in the supply chain
|
Liao C.-J.; Lin Y.; Shih S.C. |
| 國立臺灣科技大學 |
2010 |
Parallel machine scheduling with preference of machines
|
Chuang M.-C.; Liao C.-J.; Chao C.-W. |
| 國立臺灣海洋大學 |
2010 |
Progress Toward an Asian Marine Core Research Center in Taiwan Ocean Research Institute (TORI)
|
Chou C.-C.;Liao C.-J.;Huang Y.-L.;Chen M.-.T.;Yu P.-S.;Liu S.-Y.;Liu C.-S. |
| 國立臺灣科技大學 |
2009 |
Minimizing total tardiness on a single machine with controllable processing times
|
Tseng C.-T.; Liao C.-J.; Huang K.-L. |
| 國立臺灣科技大學 |
2009 |
Minimizing the sum of job completion times on capacitated two-parallel machines
|
Liao C.-J.; Chao C.-W.; Lin C.-H. |
| 國立臺灣科技大學 |
2009 |
A least flexibility first heuristic to coordinate setups in a two- or three-stage supply chain
|
Liao C.-J.; Shyu C.-C.; Tseng C.-T. |
| 國立臺灣科技大學 |
2008 |
Makespan minimization for multiple uniform machines
|
Lin, C. H. ; Liao, C. J. |
| 國立臺灣科技大學 |
2008 |
A note on two-stage hybrid flowshop scheduling with missing operations
|
Tseng, C. T. ; Liao, C. J. ; Liao, T. X. |
| 國立臺灣科技大學 |
2008 |
Minimizing total tardiness on a single machine with controllable processing times
|
Tseng, C. T. ; Liao, C. J. ; Huang, K. L. |
| 國立臺灣科技大學 |
2008 |
Ant colony optimization combined with taboo search for the job shop scheduling problem
|
Huang, K. L. ; Liao, C. J. |
| 國立臺灣科技大學 |
2008 |
A discrete particle swarm optimization for lot-streaming flowshop scheduling problem
|
Tseng, C. T. ; Liao, C. J. |
| 國立臺灣科技大學 |
2008 |
A least flexibility first heuristic for setup coordination between two and three stages of a supply chain
|
Liao, C. J. ; Shyu, C. C. ; Tseng, C. T. |
| 國立臺灣科技大學 |
2008 |
An ant colony optimization algorithm for scheduling in agile manufacturing
|
Liao, C. J. ; Liao, C. C. |
| 國立臺灣科技大學 |
2008 |
A particle swarm optimization algorithm for hybrid flow-shop scheduling with multiprocessor tasks
|
Tseng, C. T. ; Liao, C. J. |
| 國立臺灣科技大學 |
2008 |
Improved MILP models for two-machine flowshop with batch processing machines
|
Liao, C. J. ; Liao, L. M. |
| 國立臺灣科技大學 |
2008 |
Minimizing makespan on parallel machines with machine eligibility restrictions
|
Lin, C. H. ; Liao, C. J. |
| 國立臺灣科技大學 |
2008 |
Scheduling on identical machines with batch arrivals in semiconductor testing house
|
Chung T.P.; Liao C.J.; Su L.H. |