English  |  正體中文  |  简体中文  |  总笔数 :0  
造访人次 :  52584869    在线人数 :  683
教育部委托研究计画      计画执行:国立台湾大学图书馆
 
臺灣學術機構典藏系統 (Taiwan Academic Institutional Repository, TAIR)
关于TAIR

浏览

消息

著作权

相关连结

"lin b m t"的相关文件

回到依作者浏览
依题名排序 依日期排序

显示项目 11-24 / 24 (共1页)
1 
每页显示[10|25|50]项目

机构 日期 题名 作者
國立交通大學 2014-12-08T15:33:44Z Sequence-dependent scheduling with order deliveries Lin, B. M. T.; Yin, P. Y.; Liu, Y. S.
國立交通大學 2014-12-08T15:22:33Z Two-stage assembly-type flowshop batch scheduling problem subject to a fixed job sequence Hwang, F. J.; Lin, B. M. T.
國立交通大學 2014-12-08T15:22:23Z Total completion time minimization in two-machine flow shop scheduling problems with a fixed job sequence Hwang, F. J.; Kovalyov, M. Y.; Lin, B. M. T.
國立交通大學 2014-12-08T15:20:52Z Resource-constrained flowshop scheduling with separate resource recycling operations Cheng, T. C. E.; Lin, B. M. T.; Huang, H. L.
國立交通大學 2014-12-08T15:15:20Z On relocation problems with multiple identical working crews Kononov, A. V.; Lin, B. M. T.
國立交通大學 2014-12-08T15:14:22Z Scheduling in an assembly-type production chain with batch transfer Lin, B. M. T.; Cheng, T. C. E.; Chou, A. S. C.
國立交通大學 2014-12-08T15:13:52Z A note on parallel-machine scheduling with deteriorating jobs Jeng, A. A. K.; Lin, B. M. T.
國立交通大學 2014-12-08T15:13:32Z Complexity results for single-machine scheduling with positional learning effects Lin, B. M. T.
國立交通大學 2014-12-08T15:13:03Z Customer order scheduling to minimize the number of late jobs Lin, B. M. T.; Kononov, A. V.
國立交通大學 2014-12-08T15:12:48Z Multicast routing and wavelength assignment with delay constraints in WDM networks with heterogeneous capabilities Chen, Ming-Tsung; Lin, B. M. T.; Tseng, Shian-Shyong
國立交通大學 2014-12-08T15:12:24Z Development of new features of ant colony optimization for flowshop scheduling Lin, B. M. T.; Lu, C. Y.; Shyu, S. J.; Tsai, C. Y.
國立交通大學 2014-12-08T15:11:00Z Maximizing the reward in the relocation problem with generalized due dates Lin, B. M. T.; Liu, S. T.
國立交通大學 2014-12-08T15:10:05Z Johnson's rule, composite jobs and the relocation problem Cheng, T. C. E.; Lin, B. M. T.
國立交通大學 2014-12-08T15:08:21Z Scheduling of a two-stage differentiation flowshop to minimize weighted sum of machine completion times Cheng, T. C. E.; Lin, B. M. T.; Tian, Y.

显示项目 11-24 / 24 (共1页)
1 
每页显示[10|25|50]项目