|
English
|
正體中文
|
简体中文
|
Total items :0
|
|
Visitors :
52820824
Online Users :
671
Project Commissioned by the Ministry of Education Project Executed by National Taiwan University Library
|
|
|
|
Taiwan Academic Institutional Repository >
Browse by Author
|
"lin y k"
Showing items 131-140 of 318 (32 Page(s) Totally) << < 9 10 11 12 13 14 15 16 17 18 > >> View [10|25|50] records per page
| 國立臺灣科技大學 |
2015 |
Assessment of spare reliability for multi-state computer networks within tolerable packet unreliability
|
Lin, Y.-K.;Huang, C.-F. |
| 國立臺灣科技大學 |
2015 |
Demand satisfaction and decision-making for a PCB manufacturing system with production lines in parallel
|
Lin, Y.-K.;Chang, P.-C. |
| 國立臺灣科技大學 |
2015 |
A novel model for a manufacturing system with joint production lines in terms of prior-set
|
Lin, Y.-K.;Chang, P.-C. |
| 國立臺灣科技大學 |
2015 |
Fuzzy-based system reliability of a labour-intensive manufacturing network with repair
|
Chang, P.-C.;Lin, Y.-K. |
| 國立臺灣科技大學 |
2015 |
Reliability analysis for an apparel manufacturing system applying fuzzy multistate network
|
Chang, P.-C.;Lin, Y.-K. |
| 國立臺灣科技大學 |
2015 |
System reliability maximization for a computer network by finding the optimal two-class allocation subject to budget
|
Lin, Y.-K.;Yeh, C.-T. |
| 國立臺灣科技大學 |
2015 |
Lessons learned in design of an excavation with the installation of buttress walls
|
Hsieh, P.-G.;Ou, C.-Y.;Lin, Y.-K.;Lu, F.-C. |
| 國立臺灣科技大學 |
2015 |
Confidence-based reliability evaluation of multistate production network with process improvement
|
Cho, Y.-L.;Chang, P.-C.;Lin, Y.-K. |
| 國立臺灣科技大學 |
2015 |
The study of multipath TCP networks under latency with retransmission mechanism
|
Liao, Y.-C.;Lin, Y.-K.;Pan, C.-L. |
| 國立臺灣科技大學 |
2015 |
Predecessor-set technique for reliability evaluation of a stochastic manufacturing system
|
Lin, Y.-K.;Chang, P.-C. |
Showing items 131-140 of 318 (32 Page(s) Totally) << < 9 10 11 12 13 14 15 16 17 18 > >> View [10|25|50] records per page
|