|
English
|
正體中文
|
简体中文
|
总笔数 :0
|
|
造访人次 :
52782175
在线人数 :
790
教育部委托研究计画 计画执行:国立台湾大学图书馆
|
|
|
"lin y k"的相关文件
显示项目 196-205 / 318 (共32页) << < 15 16 17 18 19 20 21 22 23 24 > >> 每页显示[10|25|50]项目
| 國立臺灣科技大學 |
2013 |
Quick reliability assessment of two-commodity transmission through a capacitated-flow network
|
Lin, Y.-K. |
| 國立臺灣科技大學 |
2013 |
Quick reliability assessment of two-commodity transmission through a capacitated-flow network
|
Lin, Y.-K. |
| 國立臺灣科技大學 |
2013 |
Foreword: Special issue on statistical reliability and maintenance modeling
|
Chukova, S.;Dohi, T.;Lin, Y.-K. |
| 臺北醫學大學 |
2013 |
Ablation of the androgen receptor gene modulates atrial electrophysiology and arrhythmogenesis with calcium protein dysregulation
|
Tsai, W. C.;Yang, L. Y.;Chen, Y. C.;Kao, Y. H.;Lin, Y. K.;Chen, S. A.;Cheng, C. F.;Chen, Y. J. |
| 國立臺灣大學 |
2013 |
Increased risk of prostate cancer following sexually transmitted infection in an Asian population
|
Chung, S. D.; Lin, Y. K.; Huang, C. C.; Lin, H. C. |
| 國立臺灣科技大學 |
2012 |
Reliability evaluation for a multi-line production system with reworking actions
|
Chang, P.-C.;Lin, Y.-K. |
| 國立臺灣科技大學 |
2012 |
Accuracy rate issue for system reliability evaluation of multiple terminals
|
Lin, Y.-K.;Huang, C.-F. |
| 國立臺灣科技大學 |
2012 |
Reliability evaluation of a computer network in cloud computing environment subject to maintenance budget
|
Lin, Y.-K.;Chang, P.-C. |
| 國立臺灣科技大學 |
2012 |
System reliability of a manufacturing network with reworking action and different failure rates
|
Lin, Y.-K.;Chang, P.-C. |
| 國立臺灣科技大學 |
2012 |
A study of correlated failures on the network reliability of power transmission systems
|
Lin, Y.-K.;Chang, P.-C.;Fiondella, L. |
显示项目 196-205 / 318 (共32页) << < 15 16 17 18 19 20 21 22 23 24 > >> 每页显示[10|25|50]项目
|