國立臺灣科技大學 |
2012 |
Solving single row facility layout problem using extended artificial chromosome genetic algorithm
|
Utamima, A.;Ou-Yang, C. |
國立臺灣科技大學 |
2012 |
A pattern based approach for structural analysis of workflow models
|
Ou-Yang, C.;Cheng, H.J. |
國立臺灣科技大學 |
2012 |
Transfer an EPC based process model into a hierarchical functional model to support value chain development
|
Ou-Yang, C.;Wang, S.H. |
國立臺灣科技大學 |
2011 |
Petri-net integration - An approach to support multi-agent process mining
|
Ou-Yang, C.;Winarjo, H. |
國立臺灣科技大學 |
2010 |
Applying process mining approach to support the verification of a multi-agent system
|
Ou-Yang C.; Juan Y.-C. |
國立臺灣科技大學 |
2010 |
Improving a commercial bank's operation performance through statistical process control
|
Tsai M.-C.; Ou-Yang C. |
國立臺灣科技大學 |
2009 |
A process-oriented multi-agent system development approach to support the cooperation-activities of concurrent new product development
|
Juan Y.-C.; Ou-Yang C.; Lin J.-S. |
國立臺灣科技大學 |
2009 |
A neural networks approach for forecasting the supplier's bid prices in supplier selection negotiation process
|
Lee C.C.; Ou-Yang C. |
國立臺灣科技大學 |
2009 |
Towards a standardised framework for a multi-agent system approach for cooperation in an original design manufacturing company
|
Lin J.-S.; Ou-Yang C.; Juan Y.-C. |
國立臺灣科技大學 |
2008 |
BPMN Based Business Process Model Feasibility Analysis-a Petri Net Approach
|
Ou-Yang, C. ; Lin, Y. D. |
國立臺灣科技大學 |
2008 |
A DCOR-Based MAS Framework to Support Desing Chain Cooperation
|
Lin, J. S. ; Yuan, Y. C. ; Ou-Yang, C. |
國立臺灣科技大學 |
2008 |
Transfer a Business Process Model into a Hierarchical Functional Model
|
Ou-Yang, C. ; Wang, S. H. |
國立臺灣科技大學 |
2008 |
Development and evaluation of the interactive bidding strategies for a demander and its suppliers in supplier selection auction market
|
Lee, C.C.;Ou-Yang, C. |
國立臺灣科技大學 |
2008 |
BPMN-based business process model feasibility analysis: A petri net approach
|
Ou-Yang, C.;Lin, Y.D. |
國立臺灣科技大學 |
2008 |
Developing an agent-based APS and ERP collaboration framework
|
Ou-Yang, C.;Hon, S.J. |
國立臺灣科技大學 |
2007 |
Development and Evaluation of the Interactive Bidding Strategies for a Demander and its Suppliers in Supplier Selection Auction Market
|
Lee, C. C. ; Ou-Yang, C. |
國立臺灣科技大學 |
2006 |
Developing an Agent-based PDM/ERP Collaboration System
|
Ou-Yang, C. ; Chang, M. J. |
國立臺灣科技大學 |
2006 |
Development and evaluation of the bidding strategies for a demander and its suppliers in supplier selection auction market
|
Lee, C. C. ; Ou-Yang, C. |
國立臺灣科技大學 |
2005 |
A Process Logic Comparison Approach to Support Business Process Benchmarking
|
Juan, J. C. ; Ou-Yang, C. |
國立臺灣科技大學 |
2004 |
A System Enterprise Model Comparison Approach to Support Business Process Gap Analysis
|
Juan, J. C. ; Ou-Yang, C. |
國立臺灣科技大學 |
2003 |
Developing a PDM/MRP Framework to Evaluate the Influence of Engineering Change on Inventory Scrap Cost
|
Ou-Yang, C. ; Cheng, M. C. |
國立臺灣科技大學 |
2003 |
A business process comparison approach for ERP adoption
|
Juan, Y. C. ; Ou-Yang, C. |
國立臺灣科技大學 |
2003 |
A structural approach for process logic comparison between flowcharts
|
Juan, Y. C. ; Ou-Yang, C. |
國立臺灣科技大學 |
2002 |
Developing an Integration Framework to Support the Information Flow between PDM and MRP
|
Ou-Yang, C. ; Jiang, T. A. |
國立臺灣科技大學 |
2001 |
Developing and Computer-aided Environment to Investigate the Influence of Design Schedule Changes on MRP
|
Ou-Yang, C. ; Liu, H. C. |
國立臺灣科技大學 |
2000 |
Developing a Computer Shop Floor Control Model for a CIM System- Using Object Modeling Technique
|
Ou-Yang, C. ; Guan, T. Y. ; Lin, J. S. |
國立臺灣科技大學 |
2000 |
Applying an Integrated Analysis Method to Develop a Shop Floor Control System
|
Ou-Yang, C. ; Chang, R. H. |
國立臺灣科技大學 |
2000 |
Evaluate the Information Flow in a Hierarchical Shop Floor Control Framework
|
Ou-Yang, C. ; Lee, J. C. |
國立臺灣科技大學 |
1999 |
Applying the Topological Relationships of Form Features to Retrieve Part Models from a CAD System
|
Ou-Yang, C. ; Liou, P. Y. |
國立臺灣科技大學 |
1999 |
Developing an Integrated Intelligent Framework to Support Engineering Change Process for Axial Piston Pump
|
Ou-Yang, C. ; Chang, C. W. |
國立臺灣科技大學 |
1999 |
Developing a STEP-based Integration Environment to Evaluate the Impact of an Engineering Change on MRP
|
Ou-Yang, C. ; Pei, H. N. |
國立臺灣科技大學 |
1999 |
Developing a Petri Nets Model to Evaluate the Information Flow in a Modified Hierarchical Shop floor Control Framework
|
Ou-Yang, C. ; Shieh, C. M. |
國立臺灣科技大學 |
1999 |
Applying Feature Spatial Relationships Concepts to Retrieve CAD Drawing Files
|
Ou-Yang, C. ; Chang, T. M. |
國立臺灣科技大學 |
1998 |
The Development of a Hybrid Shop Floor Control System-Applying Bidding Method in Job Dispatching
|
Ou-Yang, C. ; Lin, J. S. |
國立臺灣科技大學 |
1998 |
A Decision Analysis Method for Tardy WIP-from Production Cost Point of View
|
Ou-Yang, C. ; Liou, M. E. |
國立臺灣科技大學 |
1997 |
Developing an Integrated Framework for Feature-based Early Manufacturing Cost Estimation
|
Ou-Yang, C. ; Lin, T. S. |
國立臺灣科技大學 |
1995 |
An Approach to Find the Minimum Wall Thickness of a Part from Its B-Rep Model
|
Ou-Yang, C. ; Yuan, Y. C. |
國立臺灣科技大學 |
1994 |
An Approach to Find the Minimum Wall Thickness of a Part from Its B-Rep Model
|
Ou-Yang, C. ; Yuan, Y. C. |
國立臺灣科技大學 |
1993 |
A Computer Analysis of Orientation Devices for Vibratory Bowl Feeders
|
Ou-Yang, C. ; Maul, G. P. |
國立臺灣科技大學 |
1992 |
Part Stable Orientation Analysis: A Near Convex Shape Approach
|
Ou-Yang, C. |
國立臺灣科技大學 |
1991 |
Manufacturability Assessment: An Object Oriented Approach
|
Chen, Y. M. ; Ou-Yang, C. ; Miller, R. A. |
國立臺灣科技大學 |
1989 |
Optimal Injection Velocity Profiling
|
Ou-Yang, C. ; Maul, G. P. |
國立臺灣科技大學 |
1987 |
Predicting the Cycle Time for a Sequence of Parts in a Sensor-Based Vibratory Bowl Feeder
|
Maul, G. P. ; Ou-Yang, C. |