|
English
|
正體中文
|
简体中文
|
Total items :0
|
|
Visitors :
50971901
Online Users :
1115
Project Commissioned by the Ministry of Education Project Executed by National Taiwan University Library
|
|
|
|
Taiwan Academic Institutional Repository >
Browse by Author
|
"tseng c t"
Showing items 26-35 of 42 (5 Page(s) Totally) << < 1 2 3 4 5 > >> View [10|25|50] records per page
| 國立臺灣科技大學 |
2010 |
2D tunneling chart from redistributed 3D principal stress path
|
Chen C.N.; Tseng C.T. |
| 國立臺灣大學 |
2009-12 |
Spatial and temporal distributions of sailfish associated with environmental factors in the Northwestern Pacific Ocean
|
Tseng, C.T.; Sun, C.L.; Yeh, S.Z.; Chen, S.C.; Liu, P.L.; Chen, S.C.; Liu, D.C.; Su, W.C. |
| 國立臺灣科技大學 |
2009 |
Minimizing total tardiness on a single machine with controllable processing times
|
Tseng C.-T.; Liao C.-J.; Huang K.-L. |
| 國立臺灣科技大學 |
2009 |
A least flexibility first heuristic to coordinate setups in a two- or three-stage supply chain
|
Liao C.-J.; Shyu C.-C.; Tseng C.-T. |
| 國立臺灣科技大學 |
2008 |
A note on two-stage hybrid flowshop scheduling with missing operations
|
Tseng, C. T. ; Liao, C. J. ; Liao, T. X. |
| 國立臺灣科技大學 |
2008 |
Minimizing total tardiness on a single machine with controllable processing times
|
Tseng, C. T. ; Liao, C. J. ; Huang, K. L. |
| 國立臺灣科技大學 |
2008 |
A discrete particle swarm optimization for lot-streaming flowshop scheduling problem
|
Tseng, C. T. ; Liao, C. J. |
| 國立臺灣科技大學 |
2008 |
A least flexibility first heuristic for setup coordination between two and three stages of a supply chain
|
Liao, C. J. ; Shyu, C. C. ; Tseng, C. T. |
| 國立臺灣科技大學 |
2008 |
A particle swarm optimization algorithm for hybrid flow-shop scheduling with multiprocessor tasks
|
Tseng, C. T. ; Liao, C. J. |
| 國立臺灣大學 |
2008 |
Observations of Kuroshio upwelling from satellite and ship data in the Southern East China Sea
|
Tseng, C. T.; Sun, C. L.; Yeh, S. Z.; Chen, S. C.; Liu, D. C.; Su, W. C. |
Showing items 26-35 of 42 (5 Page(s) Totally) << < 1 2 3 4 5 > >> View [10|25|50] records per page
|