English  |  正體中文  |  简体中文  |  2828323  
???header.visitor??? :  32250291    ???header.onlineuser??? :  1036
???header.sponsordeclaration???
 
臺灣學術機構典藏系統 (Taiwan Academic Institutional Repository, TAIR)
???ui.leftmenu.abouttair???

???ui.leftmenu.bartitle???

???index.news???

???ui.leftmenu.copyrighttitle???

???ui.leftmenu.link???

"tseng c t"???jsp.browse.items-by-author.description???

???jsp.browse.items-by-author.back???
???jsp.browse.items-by-author.order1??? ???jsp.browse.items-by-author.order2???

Showing items 26-42 of 42  (2 Page(s) Totally)
<< < 1 2 
View [10|25|50] records per page

Institution Date Title Author
國立臺灣科技大學 2010 2D tunneling chart from redistributed 3D principal stress path Chen C.N.; Tseng C.T.
國立臺灣大學 2009-12 Spatial and temporal distributions of sailfish associated with environmental factors in the Northwestern Pacific Ocean Tseng, C.T.; Sun, C.L.; Yeh, S.Z.; Chen, S.C.; Liu, P.L.; Chen, S.C.; Liu, D.C.; Su, W.C.
國立臺灣科技大學 2009 Minimizing total tardiness on a single machine with controllable processing times Tseng C.-T.; Liao C.-J.; Huang K.-L.
國立臺灣科技大學 2009 A least flexibility first heuristic to coordinate setups in a two- or three-stage supply chain Liao C.-J.; Shyu C.-C.; Tseng C.-T.
國立臺灣科技大學 2008 A note on two-stage hybrid flowshop scheduling with missing operations Tseng, C. T. ; Liao, C. J. ; Liao, T. X.
國立臺灣科技大學 2008 Minimizing total tardiness on a single machine with controllable processing times Tseng, C. T. ; Liao, C. J. ; Huang, K. L.
國立臺灣科技大學 2008 A discrete particle swarm optimization for lot-streaming flowshop scheduling problem Tseng, C. T. ; Liao, C. J.
國立臺灣科技大學 2008 A least flexibility first heuristic for setup coordination between two and three stages of a supply chain Liao, C. J. ; Shyu, C. C. ; Tseng, C. T.
國立臺灣科技大學 2008 A particle swarm optimization algorithm for hybrid flow-shop scheduling with multiprocessor tasks Tseng, C. T. ; Liao, C. J.
國立臺灣大學 2008 Observations of Kuroshio upwelling from satellite and ship data in the Southern East China Sea Tseng, C. T.; Sun, C. L.; Yeh, S. Z.; Chen, S. C.; Liu, D. C.; Su, W. C.
國立臺灣科技大學 2007 A discrete version of particle swarm optimization for flowshop scheduling problems Liao, C. J. ; Tseng, C. T. ; Luarn, P.
國立臺灣科技大學 2006 A performance evaluation of permutation vs.non-permutation schedules in a flowshop Liao, C. J. ; Liao, L. M. ; Tseng, C. T.
國立臺灣科技大學 2005 Minimizing the total tardiness in a single machine with controllable processing times Tseng, C. T. ; Liao, C. J. ; Huang, K. L.
國立臺灣科技大學 2005 Two-stage hybrid flowshop scheduling with missing operations Liao, T. S. ; Tseng, C. T. ; Lu, W. C. ; Liao, C. J.
國立臺灣大學 2002-01 Suspended Matters in Onion Farms and Their Potential Effect on Corneal Injury of the Harvesters Hwang, Y.H.; Chou, E.J.; Chang, C.W.; Chen, C.C.; Ho, C.K.; Chou, C.L.; Lee, Z.Y.; Tseng, C.T.
國立臺灣大學 2002 Suspended matters in onion farms and their potential effect on corneal injury of the harvesters Hwang Y.H.; Chou, E.J.; Chang, C.W.; Chen, C.C.; Ho, C.K.; Chou, C.L.; Lee, Z.Y.; Tseng, C.T.
淡江大學 1996-02 A Mandarin Digits Recognition System Based on A Novel Class of Hyperrectan-Gular Composite Neural Networks 謝景棠; Hsieh, C. T.; 蘇木春; Su, Mu-chun; 曾慶達; Tseng, C. T.

Showing items 26-42 of 42  (2 Page(s) Totally)
<< < 1 2 
View [10|25|50] records per page