| 國立臺灣科技大學 |
2008 |
Lot release times and dispatching rule for a TFT-LCD cell process
|
Lin, J. T. ; Wang, F. K. ; Peng, C. C. |
| 國立臺灣科技大學 |
2008 |
Applying six sigma methodology to collaborative forecasting
|
Chang, K.K.;Wang, F.K. |
| 國立臺灣科技大學 |
2008 |
Applying bootstrap method to the types I-II errors in the measurement system
|
Wang, F.K.;Yang, S.W. |
| 國立臺灣科技大學 |
2007 |
Multivariate capability indices: distributional and inferential properties
|
Pearn, W. L. ; Wang, F. K. ; Yen, C. H. |
| 國立臺灣科技大學 |
2007 |
Applying principal component analysis to a GR&R study
|
Wang, F. K. ; Yang, C. W. |
| 國立臺灣科技大學 |
2007 |
Product mix in the TFT-LCD industry
|
Wang, F. K; Du, T. ; Wen, D. |
| 國立臺灣科技大學 |
2007 |
Applying capability index to supply chain network
|
Wang, F. K. ; Du, T. |
| 國立臺灣科技大學 |
2007 |
A real-time vehicle-dispatching system for consolidating milk runs
|
Du, T. ; Wang, F. K. ; Lu, P. Y. |
| 國立臺灣科技大學 |
2007 |
Comparison of multivariate process capability indices in Encyclopedia of Statistics in Quality and Reliability
|
Wang, F. K. |
| 國立臺灣科技大學 |
2007 |
Apply FVT with Lean-Six-Sigma to upgrade value of Outputs
|
Lee, LarryJ. H. ; Wang, F. K. |
| 國立臺灣科技大學 |
2007 |
Applying six sigma to improve performance in collaborative forecast
|
Chang, K. K. ; Wang, F. K. |
| 國立臺灣科技大學 |
2007 |
Applying capability index to the supply network analysis
|
Wang, F.-K.;Du, T. |
| 國立臺灣科技大學 |
2006 |
Measuring production yield for processes with multiple quality characteristics
|
Pearn, W. L. ; Wang, F. K. ; Yen, C. H. |
| 國立臺灣科技大學 |
2006 |
Quality evaluation of a manufactured product with multiple characteristics
|
Wang, F. K. |
| 國立臺灣科技大學 |
2006 |
A hybrid Push/Pull- dispatching rule for a photobay in a 300mm wafer fab
|
Lin, J. T. ; Wang, F. K; Chang, Y. M. |
| 國立臺灣科技大學 |
2006 |
Analysis of the supply and demand in the TFT-LCD market
|
Lin, J. T. ; Wang, F. K; Lo, S. L. ; Hsu, W. T. ; Wang, Y. T. |
| 國立臺灣科技大學 |
2006 |
Evaluating the efficiency of implementing total productive maintenance
|
Wang, F. K. |
| 國立臺灣科技大學 |
2006 |
Design a supply network for six sigma
|
Wang, F. K. |
| 國立臺灣科技大學 |
2006 |
Forecasting analysis of the notebook shipment by Taiwan firms
|
Wang, F. K. |
| 國立臺灣科技大學 |
2006 |
A hybrid push/pull-dispatching rule for a photobay in a 300 mm wafer fab
|
Lin, J.T.;Wang, F.K.;Chang, Y.M. |
| 國立臺灣科技大學 |
2006 |
Analysis of the supply and demand in the TFT-LCD market
|
Lin, J.T.; Wang, F.K.; Lo, S.L.; Hsu, W.T.; Wang, Y.T. |
| 國立臺灣科技大學 |
2005 |
The performance of the number of vehicles in a dynamic connecting transport AMHS
|
Lin, J. T. ; Wang, F. K; Yang, C. R. |
| 國立臺灣科技大學 |
2005 |
A simple data transformation of auto-correlated data for SPC
|
Wang, F. K. |
| 國立臺灣科技大學 |
2005 |
A parameterized dispatching rule for a Logic IC sort in a wafer fabrication
|
Lin, J. T. ; Wang, F. K; Kuo, P. C. |
| 國立臺灣科技大學 |
2005 |
Applying a control chart to the learning curve in TPM adoption
|
Wang, F. K. |