| 國立臺灣科技大學 |
2011 |
M-estimator with asymmetric influence function for estimating the Burr type III parameters with outliers
|
Wang, F.K.;Lee, C.W. |
| 國立臺灣科技大學 |
2011 |
An M-Estimator for Estimating the Extended Burr Type III Parameters with Outliers
|
Wang, F.K.;Lee, C.W. |
| 國立臺灣科技大學 |
2010 |
TFT-LCD panel life study
|
Chu T.-P.; Sheu S.-H.; Wang F.-K. |
| 國立臺灣科技大學 |
2010 |
Robust regression for estimating the Burr XII parameters with outliers
|
Wang F.-K.; Cheng Y.-F. |
| 國立臺灣科技大學 |
2010 |
Process-oriented basis representation for a multivariate gauge study
|
Wang F.-K.; Chien T.-W. |
| 國立臺灣科技大學 |
2010 |
Adaptive neuro-fuzzy inference system for combined forecasts in a panel manufacturer
|
Wang F.-K.; Chang K.-K. |
| 國立臺灣科技大學 |
2010 |
EM algorithm for estimating the Burr XII parameters with multiple censored data
|
Wang F.K.; Cheng Y.F. |
| 國立臺灣科技大學 |
2010 |
A general procedure for process yield with multiple characteristics
|
Wang F.-K. |
| 國立臺灣科技大學 |
2010 |
Applying Lean Six Sigma and TRIZ methodology in banking services
|
Wang, F.K.;Chen, K.S. |
| 國立臺灣科技大學 |
2009 |
Modified diffusion model with multiple products using a hybrid GA approach
|
Wang, F. K. ; Chang, K. K. |
| 國立臺灣科技大學 |
2009 |
Using fuzzy neural networks for combined forecasts
|
Wang, F. K. ; Cheng, K. K. |
| 國立臺灣科技大學 |
2008 |
Process yield with measurement errors in semiconductor manufacturing
|
Wang, F. K. |
| 國立臺灣科技大學 |
2008 |
Applying six sigma to collaborative forecasting
|
Chang, K. K. ; Wang, F. K. |
| 國立臺灣科技大學 |
2008 |
Forecasting for the LCD monitor market
|
Lo, S. L. ; Wang, F. K. ; Lin, J. T. |
| 國立臺灣科技大學 |
2008 |
Applying bootstrap method to the typeⅠ& typeⅡ errors in the measurement system
|
Wang, F. K. ; Yang, S. W. |
| 國立臺灣科技大學 |
2008 |
Lot release times and dispatching rule for a TFT-LCD cell process
|
Lin, J. T. ; Wang, F. K. ; Peng, C. C. |
| 國立臺灣科技大學 |
2008 |
Applying six sigma methodology to collaborative forecasting
|
Chang, K.K.;Wang, F.K. |
| 國立臺灣科技大學 |
2008 |
Applying bootstrap method to the types I-II errors in the measurement system
|
Wang, F.K.;Yang, S.W. |
| 國立臺灣科技大學 |
2007 |
Multivariate capability indices: distributional and inferential properties
|
Pearn, W. L. ; Wang, F. K. ; Yen, C. H. |
| 國立臺灣科技大學 |
2007 |
Applying principal component analysis to a GR&R study
|
Wang, F. K. ; Yang, C. W. |
| 國立臺灣科技大學 |
2007 |
Product mix in the TFT-LCD industry
|
Wang, F. K; Du, T. ; Wen, D. |
| 國立臺灣科技大學 |
2007 |
Applying capability index to supply chain network
|
Wang, F. K. ; Du, T. |
| 國立臺灣科技大學 |
2007 |
A real-time vehicle-dispatching system for consolidating milk runs
|
Du, T. ; Wang, F. K. ; Lu, P. Y. |
| 國立臺灣科技大學 |
2007 |
Comparison of multivariate process capability indices in Encyclopedia of Statistics in Quality and Reliability
|
Wang, F. K. |
| 國立臺灣科技大學 |
2007 |
Apply FVT with Lean-Six-Sigma to upgrade value of Outputs
|
Lee, LarryJ. H. ; Wang, F. K. |
| 國立臺灣科技大學 |
2007 |
Applying six sigma to improve performance in collaborative forecast
|
Chang, K. K. ; Wang, F. K. |
| 國立臺灣科技大學 |
2007 |
Applying capability index to the supply network analysis
|
Wang, F.-K.;Du, T. |
| 國立臺灣科技大學 |
2006 |
Measuring production yield for processes with multiple quality characteristics
|
Pearn, W. L. ; Wang, F. K. ; Yen, C. H. |
| 國立臺灣科技大學 |
2006 |
Quality evaluation of a manufactured product with multiple characteristics
|
Wang, F. K. |
| 國立臺灣科技大學 |
2006 |
A hybrid Push/Pull- dispatching rule for a photobay in a 300mm wafer fab
|
Lin, J. T. ; Wang, F. K; Chang, Y. M. |
| 國立臺灣科技大學 |
2006 |
Analysis of the supply and demand in the TFT-LCD market
|
Lin, J. T. ; Wang, F. K; Lo, S. L. ; Hsu, W. T. ; Wang, Y. T. |
| 國立臺灣科技大學 |
2006 |
Evaluating the efficiency of implementing total productive maintenance
|
Wang, F. K. |
| 國立臺灣科技大學 |
2006 |
Design a supply network for six sigma
|
Wang, F. K. |
| 國立臺灣科技大學 |
2006 |
Forecasting analysis of the notebook shipment by Taiwan firms
|
Wang, F. K. |
| 國立臺灣科技大學 |
2006 |
A hybrid push/pull-dispatching rule for a photobay in a 300 mm wafer fab
|
Lin, J.T.;Wang, F.K.;Chang, Y.M. |
| 國立臺灣科技大學 |
2006 |
Analysis of the supply and demand in the TFT-LCD market
|
Lin, J.T.; Wang, F.K.; Lo, S.L.; Hsu, W.T.; Wang, Y.T. |
| 國立臺灣科技大學 |
2005 |
The performance of the number of vehicles in a dynamic connecting transport AMHS
|
Lin, J. T. ; Wang, F. K; Yang, C. R. |
| 國立臺灣科技大學 |
2005 |
A simple data transformation of auto-correlated data for SPC
|
Wang, F. K. |
| 國立臺灣科技大學 |
2005 |
A parameterized dispatching rule for a Logic IC sort in a wafer fabrication
|
Lin, J. T. ; Wang, F. K; Kuo, P. C. |
| 國立臺灣科技大學 |
2005 |
Applying a control chart to the learning curve in TPM adoption
|
Wang, F. K. |
| 國立臺灣科技大學 |
2005 |
Product mix strategy in a TFT-LCD manufacturer
|
Wang, F. K. ; Wen, F. C. |
| 元智大學 |
2004-11 |
Applying Six-Sigma to supplier development
|
李有仁; Wang, F.K.; Du, T.C. |
| 國立臺灣科技大學 |
2004 |
Bayesian stopping rule for normal distribution
|
Wang, F. K; Keats, J. B. ; Leu, B. Y. |
| 國立臺灣科技大學 |
2004 |
Capacity-constrained scheduling for a logic IC final test facility
|
Lin, J. T. ; Wang, F. K; Lee, W. T. |
| 國立臺灣科技大學 |
2004 |
Virtual vehicle in the connecting transport automated material-handling system (AMHS)
|
Lin, J. T. ; Wang, F. K; Young, J. R. |
| 國立臺灣科技大學 |
2004 |
The maximum loading and the optimum number of vehicles in a double-loop of an interbay material handling system
|
Lin, J. T. ; Wang, F. K; Yen, P. Y. |
| 國立臺灣科技大學 |
2004 |
Operating characteristic curves for the exponential bayes-truncated test
|
Wang, F. K. ; Keats, J. B. |
| 國立臺灣科技大學 |
2004 |
Performance evaluation of an automated material handling system for a wafer fab
|
Wang, F. K. ; Lin, J. T. |
| 國立臺灣科技大學 |
2004 |
Applying six-sigma to supplier development
|
Wang, F. K; Du, T. C. ; Li, E. Y. |
| 國立臺灣科技大學 |
2004 |
A hybrid approach to estimate the parameters of the diffusion model
|
Wang, F. K. |